Some pictures of the Hillary Clinton* signals at Luton today
*all the lights have gone out
25kV Trumps 650V

Some pictures of the Hillary Clinton* signals at Luton today
*all the lights have gone out

Plus, my experience last night was that the driver of the Arriva bus from Hatfield to St Albans wouldn't accept train tickets, as the Thameslink site claimed, so it was either pay, or hope a shuttle was operating, with no sign of the latter.I guess the Arriva services may have worked better, but if you're moving train loads of people to another line, you must have your own buses and with TL being a 24 hour railway and GN not that far off (first train around 4am) then I'd have expected shuttles running throughout the night and morning.
Assuming no trains through the core, how many per hour can be turned around in St Pancras low level?
The photo I've sen elsewhere looks like a signal tail cable hanging off the signal gantry.
Although some operators do have contingency plans in place, Ensign for example.
Any link to the picture?
Thameslink is a fragile, unreliable, shambles. Performance is absolutely woeful, and that's no exaggeration.
If the infrastructure can't be made to work reliably now, a reliable 24tph is a complete dream. The powers that be need to snap out of the Thameslink Programme Dreamworld, and enter reality.
I'm tired of reading excuses for this unreliable joke of a train service.
CAPE/CAPEd is railway (in fact ex-railway telegraph transmission) shorthand for "Cancelled At Point of Entry", ie. service cancelled in its entirety, from the very start of its booked journey on the network.
CAPE/CAPEd is railway (in fact ex-railway telegraph transmission) shorthand for "Cancelled At Point of Entry", ie. service cancelled in its entirety, from the very start of its booked journey on the network.
To: Class377/5
I'm struggling to understand your example above. How could TL11 and TL12 run then when they can't run them at the moment? What am I missing?
I may have missed it, but has anyone identified the probable origin of the dangling cable? In other words, was it something that was being worked on at the time, or had it just been left loose? If the latter, something of a serious safety and engineering breach I would have thought.
Thameslink is a fragile, unreliable, shambles. Performance is absolutely woeful, and that's no exaggeration.
If the infrastructure can't be made to work reliably now, a reliable 24tph is a complete dream. The powers that be need to snap out of the Thameslink Programme Dreamworld, and enter reality.
I'm tired of reading excuses for this unreliable joke of a train service.
Alternative Routes
-
Replacement buses are operating as below to link to Great Northern routes until 23:00.
between Bedford and St Neots
between Luton and Hitchin
between St Albans and Hatfield
-
The following local bus services are accepting Thameslink ticket holders:
ARRIVA bus route 300, 301 and 724 between St Albans and Hatfield where Great Northern services run to London Kings Cross.
METROLINE buses 84, 84A between St Albans and Potters Bar where Great Northern services run to London Kings Cross.
METROLINE bus 714 between St Albans/Luton and New Barnet where Great Northern services run to London Kings Cross.
UNO buses route 602 St Albans/Radlett to Hatfield, 653 St Albans to Hatfield where Great Northern services run to London Kings Cross.
UNO bus 602 between St Albans/Radlett and Watford High Street where London Overground services run to London Euston.
UNO bus 615 between Elstree & Borehamwood and Stanmore where the Jubilee line runs.
UNO bus 655 between St Albans, Radlett and Esltree & Borehamwood.
Greenline route 757 services between Victoria and Luton.
Really? I agree with the C but I thought the rest was "and proceed empty/to xxx (destination)". I'm pretty sure to have been involved with trains we CAPEd en-route.
Don't forget that with the combined efforts of the resignalling, the automatic operation, the separation of the tracks from the core all the way to Windmill Junction, and the capacity creating trains, the post 2018 picture is entirely different.
Yeah, it feels like EMT have got significantly better access. And those with the least alternatives (aka Bedford to Harpenden users) have essentially one train an hour with no guidance over when in the hour it might leave...
(Altho Rick's numbers are more promising than those on the previous page)
Rick - and the part-day meltdowns every time a train pulls the wires down at City Thamelink...
Hold your horses - EMT's decisions haven't been that great today. Cancelling the Corby's means a drop to hourly services for Wellingborough and Kettering, with busier than normal trains because they were picking up extra passengers at Luton and Bedford - and were only stopping hourly at those as the Corby is usually the other stopper along there. I don't know why they couldn't have stopped the Nottingham fast at Bedford, Wellingborough and Kettering, running it in the path of the Corby as far as Kettering and then let it pick up its usual path from there - it's leaves STP 15 after the Corby so must only be a few mins behind it by Kettering.
.. Without looking it up West Hampstead must be around 40 years old so it is to be hoped that the original equipment has been updated at some point...
Wow. And without the Marston Vale and Abbey lines, this would have been even more of a car crash...
The 'outside' kit such as point machines will be replaced every so often because they have moving parts so get worn. WH was put in during the Clamp-lock (mechanism type) era, but they have gone out (and in) of favour several times over the years, and newer types of mechanism have been developed, these tend to be put in on junction renewals and remodellings
Signal heads tend to last for years, though over the last few years there have been like-for-like replacements with LED types in many areas, I expect the WH area will have had its share of these.
Lineside cables get damaged, or become life expired, so some of those will have been renewed.
Other than that, the interlocking kit can be kept going almost indefinitely, it's relay-based (apart from the London end which was resignalled for the CTRL works), so you can just keep periodically renewing the relays.
The control panel in WH itself has had some partial renewals, but was showing its age the last time I was in there, and the electronic systems (remote control) are fairly easy to replace with modern equivalents. This is being done elsewhere as a prelude to recontrol onto a ROC, because the new systems are more compatible with the ROC systems.
WH was commissioned in stages between (IIRC) 1978/9 and 1982, so your estimate wasn't too far out.
I may have missed it, but has anyone identified the probable origin of the dangling cable? In other words, was it something that was being worked on at the time, or had it just been left loose? If the latter, something of a serious safety and engineering breach I would have thought.
Trains were disrupted after a signalling wire came into contact with overhead electric lines, it said.
Robert McIntosh, from Network Rail, said: "What we do know is one of our signalling cables did come away.
"A signalling system that normally carries 24 volts had a sudden injection of 25,000 volts. It has caused quite extensive damage, which is why it's taking us so long to put this right."
http://www.lutontoday.co.uk/news/update-train-delays-after-overhead-wire-damage-1-7671452
Right had some time to actually put together what you'd do with the service and having the link to GN would actually improve the situation. The link would allow BML services for example to run as booked from the Core south. This would give the high peak hour 22tph against the 24tph depending on what you can run on MML. Maybe possible to run the TL1 services fully but may reduce what shttules can be provided on MML.
Mainline
TL1 - Bedford to Brighton
Run as Bedford to St Pancras (high level) service alongside TL2
London Bridge to Brighton (currently 2tph to anyway so room for it)
TL2 - Bedford to Gatwick
Run as Bedford to St Pancras (high level) service alongside TL1
TL3 - Bedford to East Grinstead - Peak Only
Run from London bridge low level like today
TL4 - Bedford to Littlehampton - Peak Only
Run from London bridge low level like today
TL5 - Peterborough to Horsham
Can run as normal
TL6 - Cambridge to Brighton
Can run as normal
TL7 - Cambridge to Maidstone East
Can run as normal
Metro
TL8 - Welwyn GC to Sevenoaks - Peak only
Blackfriars to Sevenoaks - Off Peak
Can ran as normal
TL9 - Luton to Orpington - Peak only
Kentish Town to Orpington - Off peak
Run as Kentish Town to Orpington all day
TL10 - Luton to Rainham
Run as West Hampstead to Rainham
TL11 - St Albans to Sutton via Wimbledon
Can run as normal
TL12 - St Albans to Sutton via Mitcham
Can run as normal
NR is planning a block overnight to attempt a final fix.
Great but what happens to the other half of TL2 - no TL services to Coulsdon South and Merstham, plus 50% reduction at Redhill?? Not a good solution for us!! Cutting of Three Bridges to Bedford service with ongoing unreliability from Southern has been a nightmare for off peak travel in last two days
Both Coulsdon South and Mersham are peak only so a few additional stops on Southern will balance that. Or simply put some stops on Horsham and/or Brighton service. Or simply run a Finsbury Park to Three Bridges service. Reverse stock in the depot so no major reason you can't.