The Pendo depot is an Alstom facility. As Wabtec were the subcontractor to Alstom perhaps they decided to undertake the rectification, themselves and miss Wabtec out. I've heard it's a massive job, Alstom will probably have the best chance in regards the burnt wiring as they will have all the schematics and knowledge.
My understanding was the wiring wasn't so much of an issue. It was the damage to the structure of the coach and floor that was the sticking point. Almost to the point of having to potentially rebuild one of the remaining and unrequired 460 luggage coaches. Although that was obviously a last resort.
