Nothing = £150m+
Indeed, makes you wonder how a preserved railway manages to lay 8 miles of track for less, mind you the line speed will be lower but give them £1m and it will be respectable I am sure
Nothing = £150m+
I think the other issue with the Ivanhoe line is that the track would need to be re-laid between Burton and Leicester due to its poor condition. At the moment it resembles the kind of ride that you would find at a fun fair.
To have a good business case you need:
A: lots of passengers
B: low cost of restoration
C: low cost of operation
The schemes that will deliver this usually have the following features:
1: Serve a town(s) of 10,000 population not currently connected by rail.
2: Connect that town(s) with a major city that provides good employment opportunities (broadly the UK cities with 300,000+ populations but also some smaller places with very strong economies).
3: Utilise a disused line or broadly unobstructed disused alignment
4: Operate as an extension of an existing service to minimise stock requirement and terminal capacity usage.
(Haxby 8700)
re-build Holborn Viaduct station: it's the only place I can see to turn around the North bound class 700s when the Thameslink Core goes into meltdown and shuts down every rush hour.....
There's plenty of places, don't worry.
I'm afraid it's not a myth. See the emerging Sussex Route strategy. Every peak path is taken. And as the good folk of Croydon will testify, all the trains are full. Routing the trains via the wilds of Sussex won't make them any less full. All the above does is shuffle the pack. But to pick up the points:
There are no London Bridge Tunbridge Wells Thameslink trains in any timetable spec for 2018 or beyond, and there is no capacity at Tunbridge Wells (or the line up to London Bridge) for additional peak trains. The existing Tunbridge Wells starters are full and standing arriving into London now.
The good folk of East Grinstead and stations to South Croydon will not be impressed at losing most if not all of their London Bridge services. These are 8/10/12 car now - and full at London Bridge.
The peak half hourly Uckfield services will be 230m long (10 x 23) within 2 years, maybe sooner. And full at London Bridge.
I thought the Beverley line came in tthrough Huntington and New Earswick?
I would imagine at some-point the Scottish government will look into reopening the Edinburgh Suburban and Southside Junction Railway for passenger services with a couple of the old stations re-opening
The problem was that it was a slow single track line infested with level crossings. As early as 1950 it had only 8 trains a day with two extras from Guildford to Cranleigh. It would have needed extensive investment to modernise it and at the time the bus was probably almost as fast from Cranleigh as the train- as was the case in most places outside London in the 1960. It was only after the lines were lost that urban congestion came to the provinces slowing down interurban bus services and making them unreliable.
Rail passenger numbers have grown a lot since the 50's and 60's. For instance it wasn't that long ago that Fleet had two trains an hour, it now has three. Based on that it would increase Cranleigh to 12 to 15 trains a day (or one per hour over a 12 to 15 hour period - 0700-1900 to 0600-2100). However given the tidal nature of the flow I would expect that there would be a service or to up before any services back down to allow one or two services back down after the up services had finished.
Going rather off topic now, though, it's interesting that *peak* services on some lines in the area in the area have actually got less frequent since the 90s. The nearby Portsmouth Direct used to have 6 trains an hour during peak time, now it's only four plus one additional at 1818 - virtually the same frequency as off peak. Likewise the Alton line is half-hourly only during peak hours, used to be 20 mins in the mid-80s.
For whatever reason, there's more services at quiet off peak times but less during the peak on many lines!
Doubt it. Various studies have all looked at the option, either through heavy rail or through tram-train, and all found that the (minimal) costs would more than outweigh the benefits. Unlike London there's no demand for an Overground just yet and the only realistic frequencies would be so low that you would be faster getting a train or tram into the centre and back out again, thus negating the whole point of the exercise.
The last study that got done a few years back concluded that two of the three options presented had a better money return than either Edinburgh Trams or HS2.
Given that the southern loop is going to be electrified in the next few years, now is the time to relook at opening the loop to passenger services.
The last study that got done a few years back concluded that two of the three options presented had a better money return than either Edinburgh Trams or HS2.
Given that the southern loop is going to be electrified in the next few years, now is the time to relook at opening the loop to passenger services.
I would like to see the old St Helens Central - St Helens Junction line re-opened
Currently St Helens Town is growing again attracting more people meaning Passenger Numbers are going up. I think now would be the perfect time to re-open the Line and give people of St Helens more options of Travel, it should also help St Helens Town grow further with the better Transport Connection.
Yes, and the approaches to all of those will be queuing solid in less than a jiffy when trains need to be turned around (not forgetting existing rather than new infrastructure each side of the Core, conflicting movements, train crew hours, passenger confusion, Control fatigue and so on). Now, I wouldn't really go so far as to say that Holborn Viaduct would be a good place to turn around trains, as that would also be affected by all of the above, but the more locations the better. I appreciate the extensive modelling undertaken to see where turnarounds are best, but the railway has its own special breed of chaos, and with peak-hour passenger numbers, there are immense human factors at play.
Unfortunately, as the London Bridge project shows, separating conflicting moves and creating space for passengers and trains is hard enough, so the chances of a reinstatement of Holborn Viaduct station may indeed not be the best choice...
Holborn Viaduct being slightly off the line of route and thus not blocking other train movements seems a no-brainer. Would not necessarily have to re-open as a station: would a passenger link be possible to the northern entrance of St Pauls Thameslink be possible, to be opened as and when?
Except it doesn't, much. The Uckfield trains are already full at Croydon in the peak. There's no capacity for more trains north of Croydon after Thameslink.
..........
Personally I would prefer changes to the single line sections over any extension to Lewes. Strikes me that the single line sections mean that the diesels take up significant platform time at London Bridge, having a far longer turn round time than the electics.
I am really unsure there is much demand from the existing Uckfield line to go south. There are already relatively good bus links for that.
One thing you haven't mentioned is that whilst it may only be 8 miles from Uckfield to Lewes I would assume that the single line sections start to cause even more chaos if you start running south of Uckfield?
Personally I would prefer changes to the single line sections over any extension to Lewes. Strikes me that the single line sections mean that the diesels take up significant platform time at London Bridge, having a far longer turn round time than the electics.
I am really unsure there is much demand from the existing Uckfield line to go south. There are already relatively good bus links for that.
I'm only a mere passenger, but isn't Holborn Viaduct essentially the existing Northern Entrance to City Thameslink anyway?
There are the Snow Hill sidings which can be used for turnarounds from the south, but there is nowhere from the North as the trains melt down at Farringdon going south, or City X going north?
I believe the reason for extending Farringdon over the site of the Moorgate junction was because the other end of the platforms is on a very steep gradient - probably steep enough to be a risk of wheelchairs rolling away down the platform.
Track is respectable from Coalville towards Leicester, agreed past Mantle Lane the track needs to be re laid, two main issues are that the local council in Coalville don't want a railway as the people running the council will be out of pocket, secondly there is an issue at the junction Leicester end, believe a chord has been lifted and a industrial estate is pretty close to the original chord