tbtc
Veteran Member
As far as I am aware there are only 2 current significant re-openings in delivery rather than 'pie in the sky'
If the Business Cases have stacked up for these, what other re-openings make the most sense and why?
- Borders Rail and
- East-West Rail.
Matlock to Buxton? Woodhead? A no-brainer for me must be the Ivanhoe line from Leicester to Burton. Most of the infrastructure is there already and it connects quite a number of towns that need economic regeneration that are a long way from existing stations.
I'm not convinced that the Waverley Line was ever about the BCR - it was about the tokenism of serving a political area without a train station rather than because it had a better business case than (say) Alloa to Dunfermline, Thornton to Leven, redoubling other lines...
...but, since you mention the Business Cases, it's funny how we've heard nothing from the SELRAP people since they were trumpeting benefits that were "6.5 times the total costs" of reopening the Skipton - Colne line - a truly astonishing figure if true. If...
(I did ask a few times what level of reopening they were talking about - a simple Parry People Mover style shuttle built on the cheap, a Network Rail standard line that'd allow the Colne Pacers to extend on a single track to Skipton, a double track electrified line for longer distance services from Liverpool to Hull.. but nobody seemed to know what the 6.5:1 ratio was actually in relation to)
A lot of the suggestions you'll get will be "solutions in need of a problem" - like Woodhead (which became fairly pointless once the heavy freight went) - if we want new lines then we shouldn't restrict ourselves to following old lines.
Not a chance.
Cross City to Burton and Ivanhoe if councils properly got behind it and sorted out a chord at the Leicester end. A big section 106 agreement would help both although the Cross City extension is more likely.
Interesting - hadn't heard of that plan
To have a good business case you need:
A: lots of passengers
B: low cost of restoration
C: low cost of operation
The schemes that will deliver this usually have the following features:
1: Serve a town(s) of 10,000 population not currently connected by rail.
2: Connect that town(s) with a major city that provides good employment opportunities (broadly the UK cities with 300,000+ populations but also some smaller places with very strong economies).
3: Utilise a disused line or broadly unobstructed disused alignment
4: Operate as an extension of an existing service to minimise stock requirement and terminal capacity usage.
Once you know these factors you can work out within 10 minutes that your proposed reopening is not viable if it does not meet A, B, C, 1, 2 and 3. You can get away without 4 if you are serving a terminal with spare capacity but it will impact the business case.
The other reopening that can work is where you connect an existing rail served town to a different major employment centre from its current connections or by a significantly quicker route. Otherwise the same rules apply.
Plus "Z" - politics?
That's why we're getting the Waverley Line re-opened to Galashiels (the LibDem's price for going into coalition with Scottish Labour) but we aren't getting the Leamside Line re-opened to serve Washington (a much bigger place, prime commuter belt, but a less emotive cause!).
Indeed. Benefit:cost ratios only seem to be used to trash proposals.
Pesky meddling facts
the Peak line, potentially opening up local tourism, providing a new faster inter-regional route between the North West and the East Midlands, an alternative route from Manchester to London, relieving the Hope Valley etc.
Since the Hope Valley generally sees two/three/four coach DMUs (but Sheffield/ Stockport/ Manchester Piccadilly can obviously accommodate *much* longer trains), it strikes me that there's a simpler way to provide more seats on the Hope Valley line?
An "alternative" route to Manchester? What use would that be most of the time? It's a fairly flimsy case, sorry.
The Tottenham South Curve maybe ?
I thought that these threads were for impractical reopenings through scenic areas, rather than practical suggestions!
Seriously though, a direct link from Tottenham Hale (on the Liverpool Street - Stansted/ Cambridge line) to South Tottenham (on the GOBLIN) sounds a good idea - especially as the GOBLIN has insufficient links to the rest of the lines in London. Sounds reasonable
