IMHO, only AC EMU's should go up north while Dual Voltage EMUs should stay in the Southeast.
I assumed the rebuilds were going to remove DV ability on the grounds of simplify to make reliable? in the same way that Southerns 313s no longer have AC ability and at one time 319s were used without pantographs on the DC network.
Only place in the north that suits DV is merseyside and I dont think a 319 would fit in their tunnels?
Is there any likelihood that some of FC's Class 317/1s or 321/4s get sent up north to Northern in-lieu of the currently planned Class 319s?
Would they even be aloud as all trains have to have an end door iirc
319s have end doors. Whether they still would after refurbishment is unknown (to me at least).
In my view air con is a waste of money and unwelcome. It consumes huge amounts of energy and the ~2 weeks of the year when it is needed it seldom works properly. I would rather open a window.
One thing I certainly don't like is windows that open. Sitting there with a breeze may be lovely on a few days in the year but not for most.
Personally I am delighted that all modern trains do not have windows that open.
Hopper windows make me cross.
Is there any likelihood that some of FC's Class 317/1s or 321/4s get sent up north to Northern in-lieu of the currently planned Class 319s?
IMHO, only AC EMU's should go up north while Dual Voltage EMUs should stay in the Southeast.
In my view air con is a waste of money and unwelcome. It consumes huge amounts of energy and the ~2 weeks of the year when it is needed it seldom works properly. I would rather open a window.
Then there's the 158 syndrome. Air conditioned, but only just.
The emergency windows have to be opened on hot days and you are back with hopper windows.
In my view air con is a waste of money and unwelcome. It consumes huge amounts of energy and the ~2 weeks of the year when it is needed it seldom works properly. I would rather open a window.
At St Helens, there are now holes on the platform for what I guess will be cantilever gantry types, given they're only on the Liv-bound platform. Additionally, there's a lot more foundation work than I recall at the (Parr St?) bridge end.
Excavations extend east of the Junction station now, but the nearest concrete is still about half a mile west.
If the 319s are to have new ends then I would have thought it might be more useful to fit gangway/vestibule ends rather than just retain end doors. This would facilitate conductor, passengers, catering trolley movement throughout the train when coupled in multiple, a shortcoming of most DMU stock in the North apart from classes 156, 158 and some 150s.
In my view air con is a waste of money and unwelcome. It consumes huge amounts of energy and the ~2 weeks of the year when it is needed it seldom works properly. I would rather open a window.
Will they run an electric Lime Street to Warrington Bank Quay service?
Makes sense to do so, as the Liverpool to Warrington part of the 'triangle' is also getting wired.
Some people on here think the Warrington BQ service will be diverted to Manchester Victoria to make 2tph.
I don't suppose anybody's consulted Warrington about it.
It makes very good connections with the London train for St Helens etc.
A while ago I had heard that the second train per hour would run in to Bank Quay from Manchester and reverse, then continue onto Liverpool, obviously repeating the same pattern on the way back, truth in it? I have no idea.
The article describes issues with recruitment and skills of the wiring team, and says NR has to learn from them to prevent slippage in the wider wiring programme.
You would certainly expect so from reading Modern Railways.Are we likely to see these wires falling down?