DJH1971
Established Member
Doesn't need to be ready by then, 350s are behind.
Where did you hear this?
Doesn't need to be ready by then, 350s are behind.
Although it may look bad for TPE if they can't launch their first electric services as early as planned, as long as all the EMUs are up and running in time for May then no harm will be done in the long term.
Although it may look bad for TPE if they can't launch their first electric services as early as planned, as long as all the EMUs are up and running in time for May then no harm will be done in the long term.
Could FTPE use the 350/1 it's got on loan from LM for testing the OHLE?
The loan unit is a 350/2, but I wouldn't imagine there would be a problem with any 350 type.
1st 350/4 drag is tomorrow according to WNXX
http://www.realtimetrains.co.uk/train/O35953/2013/11/07/advanced
So, the first of TPE's 350's lands in the UK tomorrow then?
That's what's being reported.
Good to hear!
Wonder if they'll start work almost immediately though, for the planned change next month?
They should hopefully work out of the box then... (Well, this is Siemens)
Not like the Velaro then. How many years late now?
I dont think you can blame Siemens for being sued by Alstom and delays in licensing by governments.
I dont think you can blame Siemens for being sued by Alstom and delays in licensing by governments.
Fascinating to see the diggers at Dore-Huyton excavating buried platforms like something off a Time Team episode.
Err, station before Huyton from LS whichever it was (and dont get me started on the mid afternoon 3:31 train to Wigan NW being standing room only the whole way), theyve pretty much cleared the length between the two stations apart from where theres bridges and in the two stations diggers were excavating deep exposing former platforms.
The old Roby Platforms have been uncovered and in full view since March this year. Likewise the subway is now fully opertional from one side to the other rather than between Platforms 1 and 2. Also the old trackbed between the stations have been also exposed during that time as well, so nothing new there. I suspect it is Huyton Station is the location were the platforms have been recently uncovered including uncovering the subway.Err, station before Huyton from LS whichever it was (and dont get me started on the mid afternoon 3:31 train to Wigan NW being standing room only the whole way), theyve pretty much cleared the length between the two stations apart from where theres bridges and in the two stations diggers were excavating deep exposing former platforms.
The old Roby Platforms have been uncovered and in full view since March this year. Likewise the subway is now fully opertional from one side to the other rather than between Platforms 1 and 2. Also the old trackbed between the stations have been also exposed during that time as well, so nothing new there. I suspect it is Huyton Station is the location were the platforms have been recently uncovered including uncovering the subway.Err, station before Huyton from LS whichever it was (and dont get me started on the mid afternoon 3:31 train to Wigan NW being standing room only the whole way), theyve pretty much cleared the length between the two stations apart from where theres bridges and in the two stations diggers were excavating deep exposing former platforms.