Wyrleybart
Established Member
Doesn't bode well for the rest of the fleet then, if one has electrical issues, it would be surprising if the rest of the fleet doesn't.
To be fair, these units have been in regular use since 2000-2001 with very little downtime, and in largely original condition. For a UK diesel train that is pretty impressive - even if you are not fond of them.
I believe there are more issues with the voyagers more recently and I credit the Alstom and XC staff with getting the units back to Central Rivers for the repairs and maintenance as well as they do. Just remember that a unit that leaves Longsight, Eastleigh, Laira etc needs to be on a 4 car or 5 car diagram that ends at Central Rivers that night, to achieve an exam or repair.
Guessing that Alstom have stripped 220033 down, examined the components, pored over the existing designs and are now considering how to cost-effectively replaced the tired and obsolete components with new stuff which will last another 20 years.
