It's hardly fair comment. The routes have never been tested on infrastructure that was designed for them. They've been forced to either cross the main line to get to and from London Bridge high level; then conflict with Charing Cross and Cannon Street services; then the single track section at the base of the spur towards Blackfriars. To say nothing of Windmill Junction.
At the moment they are forced to crawl along the slowest way from East Croydon to Blackfriars which is one long bottleneck.
Don't forget that with the combined efforts of the resignalling, the automatic operation, the separation of the tracks from the core all the way to Windmill Junction, and the capacity creating trains, the post 2018 picture is entirely different.
There is still flat crossings on Cambria Junction, just north of Loughborough Junction, Nunhead Junction, the diamond outside Lewisham, Courthill/Ladywell Junction (from Ladywell to London and Lewisham to Hither Green) and of course the crossings that Thameslink propose to use to get from London Bridge towards Deptford plus North Kent (i think?) junction itself.
And that's just SET land up to Lewisham.
NR had an opportunity to untangle literally everything on the way up to London Bridge and Blackfriars but instead narrowed that focus down to from Brighton up to London Bridge instead. What we'll have in 2018 is the major bottleneck (or the label of it) simply moving further out to a new location.