There is probably a lot more power transmission equipment manufacturing capacity available to supply equipment to Europe since the USA cut itself off from the world.
Below demonstrates how much wind is being wasted due to the inadequate grid transmission system the UK has. It would have been less in winter as demand would be higher.Bumping this - windy day today, Sun near peak intensity and nice temperature so little demand for heating or aircon. Big negative prices in the wholesale market (usual caveats apply!)
We are currently exporting to France, Belgium, Norway, Belgium, Ireland and the Netherlands. Might have been easier to say everywhere but Denmark! No doubt wind is also being constrained.

And that's only because the Viking Link has been out of action for the past few weekseverywhere but Denmark!
And that's only because the Viking Link has been out of action for the past few weeks
It was a planned outage for two weeks.ah, i did wonder.
Edit @ 22:50 25/5: Albeit it must be back in line as we are now exporting almost 1GW.
To me that makes a case for energy storage of some sort.Bumping this - windy day today, Sun near peak intensity and nice temperature so little demand for heating or aircon. Big negative prices in the wholesale market (usual caveats apply!)
We are currently exporting to France, Belgium, Norway, Belgium, Ireland and the Netherlands. Might have been easier to say everywhere but Denmark! No doubt wind is also being constrained.
Yes, that's correct. Positive numbers mean the interconnectors are adding to the grid like the generators, negative the opposite.Can someone help?
I looked at Gridwatch 5 mins ago & it showed the Viking interconnector at minus 0.61.
Does the minus indicate we are sending power to Denmark via Viking & + mean we are taking in power from abroad.
@Bald Rick has also pointed to an ever growing battery storage network coming online in the year's ahead.To me that makes a case for energy storage of some sort.
Though all the interconnectors mean that the Synchronous Grid of Continental Europe is acting as a giant battery. Around 20% of their electricity comes from hydro, so they can switch much of that off, keeping the water in the mountains, when we have wind.To me that makes a case for energy storage of some sort.
It was a planned outage for two weeks.
Also another big missing piece of electrical infrastructure is Dinorwig pumped storage which has all six units out of service from April 25 to various dates in Q4 for major overhauls as well as NG replacing some of the underground cables.
There's a lot of pumped storage hydro in the works too, provided the government confirms how it's going to get paid for.
To me that makes a case for energy storage of some sort.
If there serious about Net Zero then we need long term storage at this scale like yesterday so they should just get on with it. Nearly 70GWh of wind constrained off today that could have pumped a lot of water uphill.Ah, thanks. That explains a lot.
Indeed. There’s lots of pumoed storage proposals out there, the largest of which are:
Coire Glas, almost a dead cert, given that SSE have already spent around £100m on it. 1.3GW and 30GWh.
Loch Earba now has consent, 1.8GW and 40GWh
Loch Fearna has the planning application submitted, 1.8GW and 37GWh
Glen Earrach also has the planning application submitted, 2.0GW and 34GWh
Personally, I can’t see all 4 happening, but if they did it would be almost 7GW and 141GWh. Whilst they would rarely if ever all run at max power export, That’s still a significant ‘battery’. However it will be at least 5-6 years before any of it comes on line. Meanwhile…
Under the connections reform changes they are proposing to put a cap on battery connections to around 40GW at 2030. This will be further sub allocated to individual parts of the country. There not restricting duration so developers will surely aim for 2-4hr duration I would imagine. The output of the exercise is due later this year.Battery capacity is being added all the time. Almost every working day, there is a press release about a major battery project gaining planning consent or being energised. Some of them are huge - individually hundreds of megawatts, sometimes a gigawatt, and usually 2-3 hours of storage. Just one of scores of examples, Coalburn 1 near Lesmahagow in Lanarkshire will be commissioned in 4-5 months, 0.5GW and 1GWh. You can see it under construction from the M74 (as you drive past at 30mph).
In total, the consented projects have around 55GW and 120GWh of capacity. The constraint is getting them connected.
Solar production is very significant during the day, but zero overnight, which explains the lower prices in the middle of the day.Bizarrely the price of electricity overnight has been/is higher than in the middle of day (though not above evening peak prices). This is despite wind dominating power, gas being at the baseline minimum to remain "warm", and being a net exporter overnight. Is the export market skewing prices up?
Probably also a lot of behind the meter solar generation which shows up as reduced demand during the middle of the day when the sun shines.Solar production is very significant during the day, but zero overnight, which explains the lower prices in the middle of the day.
This is the classical "duck curve" phenomenon that has been known in California for many years.Solar production is very significant during the day, but zero overnight, which explains the lower prices in the middle of the day.
Looks to me that the market is working as it should.Bizarrely the price of electricity overnight has been/is higher than in the middle of day (though not above evening peak prices). This is despite wind dominating power, gas being at the baseline minimum to remain "warm", and being a net exporter overnight. Is the export market skewing prices up?
Well yes, you'd expect the export market to net increase prices.Bizarrely the price of electricity overnight has been/is higher than in the middle of day (though not above evening peak prices). This is despite wind dominating power, gas being at the baseline minimum to remain "warm", and being a net exporter overnight. Is the export market skewing prices up?
Pretty well the entire solar fleet even the 50MW sites are embeded at the distribution level and NESO has no visibility in real time what they are actually producing so has to 2nd guess the impact and put in place sufficient dynamic response services (frequency management) to manage the consequences of fluctuating output.Probably also a lot of behind the meter solar generation which shows up as reduced demand during the middle of the day when the sun shines.
Nuclear also contributes towards inertia needsThis can lead to fossil fuelled power stations required for grid stability but running at low percentage of capacity.
This seemed to be the case for several days over the past few weeks. Impressive!Renewables doing 85% of our energy needs at the moment, to the point we're net exporting and have raw costs as a low as -£28.
That is the merchant power price but not what the windfarm owners actually receive.Renewables doing 85% of our energy needs at the moment, to the point we're net exporting and have raw costs as a low as -£28.
Yup that's today but wind production this year is running c15% below last year and that's with more turbines in use so its got a bit of catching up to do. Anyhow with solar we are displacing more and more gas but its already accepted that gas can never be fully displaced and it will need to be held as standby plant. We are also way off levels of battery storage that would be needed to support dark windless days in winter. Existing electrical demand is c1TWh/day in mid winter but if we actually electrify heat and vehicles that will be much higher albeit our deindustrialisation can be said to be helping but only at the expense of offshoring our emissions elsewhere. So battery capacity currently is c8GWh so we have some way to go but by end of decade that should be at 100GWh based on current developments. What the UK needs to do is get on with the pumped storage schemes like Cloire Gas (30GWh) Dinorwic is only 9GWh for comparison.Currently got circa 80% of our energy coming from all renewables, while also not net importing. The week ahead is also looking at similar wind and sun conditions so should see more of this. Would be good to finally start seeing battery storage usage, I haven't found anywhere with live reporting on when this is charging/discharging, but given it's becoming an increasingly large feature of our grid, this will need to be done promptly.
You aren't aware of the existence of or the investment going into synchronous condensers then? See e.g. "ABB’s synchronous condensers go live in Liverpool to stabilize the UK’s power grid" https://new.abb.com/news/detail/101...-in-liverpool-to-stabilize-the-uks-power-gridSo who is paying for the gas installations sitting on spinning standby for the occasions when a cloud covers the sun. This is called 'flexing' and is very bad for old gas turbines. Also we need electic generated from spinning machines to keep the frequency stable.
No it didn't, the company paid to run the grid didn't pay the generators to be on standby, or it did but they took the money and didn't do it. See https://cleantechnica.com/2025/06/18/inside-the-iberian-grid-collapse-what-really-went-wrongIf we were to lose a generating asset the remaining spinning machines would slow. Static inverters (they convert DC from renewables, batteries and the interconnectors from mainland europe) cant keep the frequency at 50HZ. they will chase the fequency down. Tis happened in 2019 nerly cauign the rid to fail. and something similar happened in Iberia this year.
Renewable energy was neither the cause nor the problem, but the incident underscores the urgent need to ensure renewable-rich grids embody robust voltage and frequency management capabilities traditionally provided by synchronous fossil generators. The future, however, clearly belongs to renewables supported by advanced inverter technologies, dynamic voltage stabilization hardware, smart market structures, and robust regulatory frameworks.
this would be the Katherine Porter, reported elsewhere as " a well known anti-RE propagandist," I presumeThere are large costs caused by renewabes that are not properly allocated to them. Read Kathryn Porter
and has probably been in the pockets of the fossil fuel industry most of her career, even if she does claim to be an engineer and industry specialist..on X, LinkedIn, You Tube and in the daily Telegraph. She has higher degrees in physics and business...
Solar plus wind is still near 80%. As the grid is working now, when will this issue arise?Static inverters (they convert DC from renewables, batteries and the interconnectors from mainland europe) cant keep the frequency at 50HZ.