ETA: How many miles of Third Rail would it take to electrify Oxted and Marshlink lines? 44 coaches of DMU could be freed up... is there any reasons these two haven't been electrified already?
I think we may have some class 165/166's displaced after the crossrail project so providing they can be cleared could some be sent to work local services around cornwall/devon?
There are about 25 miles between Hurst Green and Uckfield each way for a total of about 50 track miles if fully double tracked. There are 24tpd each weekday from either London Bridge and East Croydon to Uckfield.
I see a few people mentioning 172's to replace 14x, I take it these are geared for quick acceleration over top speed?
--- old post above --- --- new post below ---
Various lines in central Scotland are to be electrified:
The Edinburgh Waverley/Glasgow Queen Street/ Dunblane "triangle"
The Cumbernauld line
Whifflet
(etc)
By my reckoning this would free up about fifty Scotrail DMUs. Since 156s are needed to do "south western" routes and 170s being "modern" I assumed that this would be the end of the 158s north of the border (possibly with Northern/EMT sending a handful of 156s north in return for a load of 158s).
However, this thread has suggested the 185s doing north instead. Hmmn. Okay, lets say the MML gets wired up. That releases 27x 222s which would go to TPE North providing a 5/6 coach train. Assuming TPE South moves to EMT (with 158s ex FSR) and TPE "North West" moves to DMU (when the lines are wired), this frees up 51 x 185s. Giving FSR all the 185s would allow them to run just two DMU classes (156 on the rural routes like West Highland, Far North, Stranraer etc, 185s on routes like Aberdeen/Inverness - Central Belt). So, all 185s are with one operator (efficiencies etc), and this leaves almost 100 158/170s to be divvied up amongst the usual suspects...
Anyone still with me?
--- old post above --- --- new post below ---
ETA: How many miles of Third Rail would it take to electrify Oxted and Marshlink lines? 44 coaches of DMU could be freed up... is there any reasons these two haven't been electrified already?
Gatwick Airport-Reading could be handed over to South West Trains
with you mate and it makes sense. Maintaining the 185s wouldnt be too bad as we have, as if we need reminding 380s now and as the diesal variant facilities could be expanded in Glasgow and haymarket converted. The problem is the 156's. They will need replacing sometime, presumably with a new design? Thoughts people? Slightly off topic but what do we think EMU wise we'll get for Scottish central belt electrification? My guess is transport scotland ordered the 380s partly as a test to see if this design could be more widely used and although its early days, they aint exactly been the hoped for success! An electro star variant sounds good to me but one point, we wil stil need enough deesal units for both express work and runs like Fife Circle so some turbos would need to stay or new stock built. Maybe the 156 replacement could have 2 subclasses, 1 for long distance e.g far north, west highland and south west and a commuter version for fife/shots line/whatever else round glasgow has not yet been wired.
I assume he's thinking of when that route is fully electrified. Now the electrification strategy already states that if competed it would be done with third rail.
Economies of scale suggest it would sit better with SWT (or even SN) - but only if a third rail EMU was planned to be used - but it wouldn't be impossible for FGW to keep on running it - perhaps using 319s from their overall fleet, if they have enough.
Maintaining the 185s wouldnt be too bad as we have, as if we need reminding 380s now and as the diesal variant facilities could be expanded in Glasgow and haymarket converted. The problem is the 156's. They will need replacing sometime, presumably with a new design? Thoughts people? Slightly off topic but what do we think EMU wise we'll get for Scottish central belt electrification? My guess is transport scotland ordered the 380s partly as a test to see if this design could be more widely used and although its early days, they aint exactly been the hoped for success! An electro star variant sounds good to me but one point, we wil stil need enough deesal units for both express work and runs like Fife Circle so some turbos would need to stay or new stock built. Maybe the 156 replacement could have 2 subclasses, 1 for long distance e.g far north, west highland and south west and a commuter version for fife/shots line/whatever else round glasgow has not yet been wired.
Regardings EMUs in Scotland: The delivery of 130 Class 380 carriages is likely to be extended into 2012.
Sometime this year 20 Class 322 carriages will be returned to the lessor.
Am I right in thinking runs like the west highland, carlisle/dumfries/stranrar arn't cleared for other D M U stock, eg 158s?
South East area, get all gaps removed such as reading - basingstoke and various on the Redhill - Gatwick area.
By Redhill - Gatwick which is electrified I assume you mean Reigate to Wokingham on the Gatwick - Reading services. This whilst looking good to fill a gap is not cash efficient - the patronage of services rarely fills a 3 car DMU hourly.
If you mean Hurst Green to Uckfield this service too is not really viable but the new class 171 service is increasing patronage and could become viable, especially as the trains continue to London Bridge.
Maybe this is a Bi-mode opportunity - using 172's with corridor connections attaching to 377's at Oxted so that electric power could be used from Hurst Green to London Bridge?? Probably technically impossible and would need extra sidings but would be greener (TIC)
If you mean Hurst Green to Uckfield this service too is not really viable
I don't remember reading anything about an option to extend the 380 order in the original contract.
Ewan
Ewan, I was saying that I thought that delivery of the Class 380s would continue into 2012. Apparently, as of 3 January 2011, ScotRail has haulted accepting delivery of remainder of the order until Siements (the manufacturer of the Class 380) has the problems are sorted out. And conservatively, I don't expect ScotRail to take delivery of the last Class 380 unit until 2012, but it could be sooner - you never know.
Deliveries resumed last week. 16 units now remaining, assuming no further issues, they should all be here by the end of May.
http://www.scot-rail.co.uk/page/Class+380+Formations
Ewan
Bi-mode isn't a good option at all for that sort of service (if at all). Electric transmission is heavier, less efficient and more expensive than hydralic or mechanical transmission (the 172s having the latter, being the lightest, most efficient and cheapest for that type of unit). The savings made running on electric will be lost when running on diesel. At least third rail is better than overhead for bi-mode as the electrical equipment is lighter and less bulky (no worse than a DEMU anyway).
With the little information I know on Railways in Great Britain, I'm kinda shocked that all the remaining units will be delivered that fast. I guess a whole load of them have aready been built but not delieved yet.