If your going to be doing the diagramming then yes they are probably going to have to buy more trains![]()
Or possibly "unique"?
Not necessarily the only trains. TfL have an option to retain 18 Class 315 units to run the peak Liverpool St (mainline) service.Crossrail will have a fleet of 65 9-car, 200m long, Class 345. These will be the only trains Crossrail has.
Not necessarily the only trains. TfL have an option to retain 18 Class 315 units to run the peak Liverpool St (mainline) service.
I'm surprised by that tbh as thought any service running through East to west would have loads of trains on the go at any one point .crossraill have recently recruited 400 drivers so what are they going to do ? Take turns in driving one of the 65 trains
Or somewhere between 800 and 1000 drivers to run 65 trains.
Have I missed anything here ?
With Leebob34 doing the unit plan, and you doing the driver plan, between you you've just destroyed the business case for Crossrail completely. Your operating costs have just gone through the roof
Not sure what the hours admin duties all these drivers are doing, but halve your lower guess (that is all it is I'm afraid) and you're getting closer.
Rest assured the driver numbers for Crossrail would be accurately calculated.
There is an option for them to purchase 18 more trains, just like LOROL with their 710s
Out of pure interest, does anyone know how many drivers Crossrail will have ?
I believe that will be earmarked for future western extensions, the 66 train fleet already allows for the residual Liverpool St peak services. 66 is already a significant increase on what was originally tendered for, I think that is mainly because at an early stage of development the Liverpool St peak trains stayed with the local TOC.
A two second Google of the MTR website will tell you it is almost 400.
They already have just under 100 that transferred from AGA at Ilford and Gidea Park depots, who currently work the Liverpool St - Shenfield service with 8 car class 315s (you don't run a 4 car on this route unless you want a riot). So they will be recruiting around a further 300.
With Leebob34 doing the unit plan, and you doing the driver plan, between you you've just destroyed the business case for Crossrail completely. Your operating costs have just gone through the roof
Not sure what the hours admin duties all these drivers are doing, but halve your lower guess (that is all it is I'm afraid) and you're getting closer.
As suggested above, the headline figure is 400 drivers, not 400 new drivers - 100 existing sounds about right
I think when the tender for stock was issued, the assumption was for 10/11-car units with 20m cars. Bombardier won the tender with 9-car 22m. The limit for extending them will be the length of platforms within the core, if those stations have been made with a bit of room for growth then lengthening trains will be an option.Can the trains easily be extended to 12 car & how quickly can that be done?
Can the trains easily be extended to 12 car & how quickly can that be done?
The limit for extending them will be the length of platforms within the core, if those stations have been made with a bit of room for growth then lengthening trains will be an option.
Pondering if the platform doors are geared up for 27 train doors, or 30/33 ?