Member
Joined
26 Jun 2021
Messages
376
Location
Ruislip
You could run probably out of gauge DD stock between Waterloo & Basingstoke but that would be very limiting with a high cost of upgrading diversionary routes. You would have to do maintenance at Wimbledon. Not really worth it and certainlt since covid.
 

Rescars

Established Member
Joined
25 May 2021
Messages
2,581
Location
Surrey
Paul Maynard MP (then junior transport minister for rail) answered a written commons question about this subject (increasing capacity in general and and using DD trains in particular) on 22 November 2016:

This first document is the most relevant to this thread, as it is a reasonably thorough feasibility study. Its main conclusion is:


The second does not consider DD trains, it just reports that previous studies rejected the ideas as impractical. The third link no longer works, but it must be the 2015 Wessex Route Study. I have a draft copy of that, and this is the final version (substantially rewritten).

The Wessex route option proposed was for double deck trains too big for the existing gauge to run Basingstoke-Waterloo only, with infrastructure work to allow them to fit. An interesting idea, of which NR concluded:

I find it odd that they are so positive.
In view of the various practicalities highlighted by others, the Wessex route seems an unexpected option. Perhaps the GW main line might have offered more attractive possibilities, capitalising on the loading gauge generosity inherited from the broad gauge (if much of this still exists). The GC London Extension might have offered an even more favourable route had it still been available. Oh the benefits of hindsight!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,745
Location
Nottingham
In view of the various practicalities highlighted by others, the Wessex route seems an unexpected option. Perhaps the GW main line might have offered more attractive possibilities, capitalising on the loading gauge generosity inherited from the broad gauge (if much of this still exists). The GC London Extension might have offered an even more favourable route had it still been available. Oh the benefits of hindsight!
The GC being "continental" gauge is essentially an enthusiast myth. While the loading gauge on ex-GWR routes is often a bit larger, this isn't true of platforms which are one of the two main factors for double deck stock. The other factor is overall height, and I don't believe broad gauge trains were significantly higher.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
Fundamentally the idea wasn't pursued because nothing was as effective for getting people on and off trains quickly as giving every ten of them their own door.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,042
Location
Up the creek
Fundamentally the idea wasn't pursued because nothing was as effective for getting people on and off trains quickly as giving every ten of them their own door.

Ten! Luxury. You could get seventeen or eighteen in a 4-SUB or 4-EPB compartment, probably more on occasions.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,423
Location
S Yorks, usually
12 seated in the older EPB/SUB closed compartments, 6 a side on the long benches!

Wasn’t the upshot of the 4-DD trial the lengthening of platforms to 10 cars on the Dartford/N Kent lines? See for example http://extra.southernelectric.org.uk/features/historical-features/seginfohistory3.html
The 4DD concept was aimed at continuing to operate trains of just eight coaches length and although the two prototype units remained in traffic until 1971 no production series followed. Instead, on the South Eastern Division platform lengths were extended for ten car operation by EPB stock.

and https://www.kentrail.org.uk/Bulleid_4DD.htm
…in December 1950 it was decreed that the 4DD Class would not go beyond two units. Instead, the expensive platform lengthening exercise was pursued after all, combined with a procurement of new electric multiple units. Platform lengthening occurred along Bexleyheath, Sidcup, and Woolwich lines in 1954, 1955, and 1957 respectively. New EMU stock in the form of 2-EPB and 4-EPB units was delivered to Central, South Western, and South Eastern Divisions from 1951 onwards, the fleet forming part of the ten-car train scheme on the latter.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,594
Location
PTSO or platform depending on the weather
I believe it was a factor as to why BR opted for the ten car train scheme.
Which one must admit was a success at the time!

I shudder to think how things might have turned out if the 4DD concept was rolled out for "double-deck" EPBs and their derivatives. Longer trains and extending platforms made more sense.

Nowadays, we just need more trains to run more frequently :D
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
Which one must admit was a success at the time!

I shudder to think how things might have turned out if the 4DD concept was rolled out for "double-deck" EPBs and their derivatives. Longer trains and extending platforms made more sense.

It was indeed.

At least the cushions would still have been well sprung !
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,322
I believe it was a factor as to why BR opted for the ten car train scheme.
The overloading through London Bridge was indeed why different schemes were attempted. A particular issue was morning peak overloading at London Bridge on the last stretch to Cannon Street, from those changing there. It was particularly pronounced at the west end, to be first off at Cannon Street. The line was at maximum capacity and extended dwell times in loading were key. Not nearly such an issue at Cannon Street in the evening peak return, which could be controlled by entry gates to each platform.

The DD units were in truth not really double deck at all, they just had some seats in each compartment up a few steps. Having open saloons instead of full compartments was a better, and less claustrophobic, solution; there wasn't much seating actually 6-across anyway on the bench seats.

The 10-car scheme with new EPB units was part of the SE division upgrade and overall Kent electrification, including 750V third rail supply across the division, which the older SUB and other pre-war units built for 650V could not handle.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
The overloading through London Bridge was indeed why different schemes were attempted. A particular issue was morning peak overloading at London Bridge on the last stretch to Cannon Street, from those changing there. It was particularly pronounced at the west end, to be first off at Cannon Street. The line was at maximum capacity and extended dwell times in loading were key. Not nearly such an issue at Cannon Street in the evening peak return, which could be controlled by entry gates to each platform.

The DD units were in truth not really double deck at all, they just had some seats in each compartment up a few steps. Having open saloons instead of full compartments was a better, and less claustrophobic, solution; there wasn't much seating actually 6-across anyway on the bench seats.

The 10-car scheme with new EPB units was part of the SE division upgrade and overall Kent electrification, including 750V third rail supply across the division, which the older SUB and other pre-war units built for 650V could not handle.

Interesting detail. The ten car train scheme has to go down as one of BR's resounding success storeys.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,377
Location
belfast
AIUI All HS2 platforms will be built for UK-Sized trains so although they have the additional vertical clearances the trains won't be any wider in the lower part of the profile. Standard UIC Gauge trains thus won't fit even captive to HS2.
so HS2 is UIC GC, except for the platforms? Hopefully the platforms don't foul the UIC GC profile?

I already thought it was odd that HS2 followed none of the mainland europe standard platform heights (550 and 760 mm), nor the UK standard platform height (915mm), but this is another reason it is increasingly odd.
HS1 and HS2 could take double-deck designs as used on SNCF's LGVs, for stock that is captive to HS routes in the UK.
But for various reasons the procurers have gone with lighter single-deck designs.
In HS2's case it is because the trains need to run through on to classic NR infrastructure.
The only trains on the UK HS network that didn't, at the time of procurement, need to run on the regular UK network are the 374s, and they are high-capacity trains with 900 seats anyway, so I guess eurostar didn't see the need to go double-decker at that point
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,639
Location
Northampton
so HS2 is UIC GC, except for the platforms? Hopefully the platforms don't foul the UIC GC profile?
My understanding is that the platforms will foul the UIC profile due to the maximum permitted stepping distance to standard NR profile trains. Not sure if HS2 is UIC-GB+ or GC.
I already thought it was odd that HS2 followed none of the mainland europe standard platform heights (550 and 760 mm), nor the UK standard platform height (915mm), but this is another reason it is increasingly odd.
AIUI the platform height (1,100mm or 1,200mm) has been specified for step-free boarding.
The only trains on the UK HS network that didn't, at the time of procurement, need to run on the regular UK network are the 374s, and they are high-capacity trains with 900 seats anyway, so I guess eurostar didn't see the need to go double-decker at that point
Double-decker may have also impacted on Eurostar's evacuation plan sign-off for the Channel Tunnel.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,377
Location
belfast
My understanding is that the platforms will foul the UIC profile due to the maximum permitted stepping distance to standard NR profile trains. Not sure if HS2 is UIC-GB+ or GC.
Here's me hoping the platforms will be build in a way that at least allows that to be changed later on for an affordable price.

Wikipedia says it is UIC GC, without citation, so no clue if that is right
AIUI the platform height (1,100mm or 1,200mm) has been specified for step-free boarding.
which should have been done at 915mm (or 760/550, but 915 makes more sense as that is where the standard UK platforms sit), with a gap-filler to meet the platform that is further away from the rails
Double-decker may have also impacted on Eurostar's evacuation plan sign-off for the Channel Tunnel.
That makes a lot of sense
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
In view of the various practicalities highlighted by others, the Wessex route seems an unexpected option. Perhaps the GW main line might have offered more attractive possibilities, capitalising on the loading gauge generosity inherited from the broad gauge (if much of this still exists). The GC London Extension might have offered an even more favourable route had it still been available. Oh the benefits of hindsight!

While the original GW loading gauge was pretty large ( 15' vertically is about 13" more than anyone else & more like 18" on average ), the vertical clearance didn't seem to survive - and I think unmodified GW steam engines are out of gauge vertically even on GW lines these days. The GW standard gauge envelope ( which would cover lines built by absorbed standard gauge companies ) was smaller than the Midland one, although that won't cover routes with their own clearances.

gwrbg.jpg

( from https://www.devboats.co.uk/gwdrawings/loadinggauges.php ) - that is apparently a B&ER loading gauge because the GWR didn't publish one. Sometime I need to overlay that on a UIC gauge template.

GB and GC gauges have nothing to do with Great Britain or Great Central :)
 
Last edited:

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,322
While the original GW loading gauge was pretty large ( 15' vertically is about 13" more than anyone else & more like 18" on average ), the vertical clearance didn't seem to survive - and I think unmodified GW steam engines are out of gauge vertically even on GW lines these days. The GW standard gauge envelope ( which would cover lines built by absorbed standard gauge companies ) was smaller than the Midland one, although that won't cover routes with their own clearances.
For former GWR steam locomotives which ran onto other former company lines in BR days, sometimes unauthorised, the principal issue was the cylinders of the larger 2-cylinder types, which might graze (hopefully no more) platform edges. Width rather than height was the issue.
 

Rescars

Established Member
Joined
25 May 2021
Messages
2,581
Location
Surrey
For former GWR steam locomotives which ran onto other former company lines in BR days, sometimes unauthorised, the principal issue was the cylinders of the larger 2-cylinder types, which might graze (hopefully no more) platform edges. Width rather than height was the issue.
Those cylinders could be problematic on home turf too. Do the cutaways in the platform edges at Worcester Shrub Hill, made to provide clearance for locos using the mid-platform scissors crossovers, still exist?
 

Turtle

Member
Joined
18 Mar 2013
Messages
469
Fascinating piece of archive film. Imagine that crush-loaded, doesn’t bear thinking about. The poor standees downstairs would be amongst the knees of those on the stairs…
I travelled home on this train for a few months shortly before it was withdrawn from the Cannon Street-Dartford route. Always sat on the lower deck and don't recollect it getting too busy as it ran at the beginning of the rush hour. An interesting experience though.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,985
Location
Airedale
I travelled home on this train for a few months shortly before it was withdrawn from the Cannon Street-Dartford route. Always sat on the lower deck and don't recollect it getting too busy as it ran at the beginning of the rush hour. An interesting experience though.
ISTR the timetabling carefully avoided the height of the peak :)
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
For former GWR steam locomotives which ran onto other former company lines in BR days, sometimes unauthorised, the principal issue was the cylinders of the larger 2-cylinder types, which might graze (hopefully no more) platform edges. Width rather than height was the issue.

The much deeper ballasting from the 70s prep for HSTs ate a lot of the vertical clearance, but I'm pretty sure King George V used to run around unmodified - the two Kings currently running around ( or have recently ) have been cut down a few inches though. Not sure about the Castles.

Modern seating plans using the GWR broad gauge loading gauge might be fun to mess with - I'm not sure you'd need two decks, for one thing!
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,322
King George V did once strike the overbridge outside Paddington after some reballasting, and the safety valve cover was sheared off. Another member here was party to the repairs at Old Oak Common and has described it.

Width over cylinders was not so much of an issue with the 4-cylinder locos, as their diameter of the outside cylinders was less than the 2-cylinder locos.
 

Wagonshop

Member
Joined
22 Mar 2017
Messages
32
As a young man I used to travel to work on one and try find a seat upstairs from Lee.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
King George V did once strike the overbridge outside Paddington after some reballasting, and the safety valve cover was sheared off. Another member here was party to the repairs at Old Oak Common and has described it.

That was 6024 King Edward I wasn’t it? It highlighted to the industry that Railtrack had little/no understanding or visibility of the clearances that it’s contractors were leaving the railway in, after tamping jobs.

I recall it also happened more recently to 6201 Princess Elizabeth somewhere near Manchester although that was due to a tamping error rather than lack of monitoring.
 

Ianigsy

Established Member
Joined
12 May 2015
Messages
1,349
I recall it also happened more recently to 6201 Princess Elizabeth somewhere near Manchester although that was due to a tamping error rather than lack of monitoring.
One of the over bridges around Salford Crescent, I think. 5972 Olton Hall had a bit of a ding with the concave platform edge at Carlisle at around the same time.

Anecdotally, I seem to recall reading that one of the pitfalls of the 4-DDs was that taller commuters preferred to stand on the steps rather than using the upper compartment, which also stopped anybody else from using them. Bulleid’s determination not to accept received wisdom at face value led to some interesting projects (he literally reinvented the wheel!) but he had the misfortune to be around at a time when pet projects and experimentation were a luxury.
 
Status
Not open for further replies.

Top