Class 170101
On Moderation
- Joined
- 1 Mar 2014
- Messages
- 8,661
Can't believe that an hourly service to London is sufficient when Manchester and Birmingham both get 3tph. 2tph in the off peak should be enough reallyWhy so?
Can't believe that an hourly service to London is sufficient when Manchester and Birmingham both get 3tph. 2tph in the off peak should be enough reallyWhy so?
Can't believe that an hourly service to London is sufficient when Manchester and Birmingham both get 3tph. 2tph in the off peak should be enough really
From my experience, the Liverpool trains are nowhere near as busy as Manchester/Birmingham trains. This surely is a case of supply/demand?
In my view the busiest off-peak VT trains on the WCML (ie the route needing more services first) are the Glasgow fasts, as far as Preston.
The new Blackpool services do a bit to address that problem.
But VT is short of trains, so another route would have to lose out to provide 2tph to Liverpool or Preston, at least in the short term.
And then we have the perennial problem of 5-car Voyagers on some London-Birmingham-Scotland services.
Liverpool is at least pretty sure of its 11-car 390s.
Can't believe that an hourly service to London is sufficient when Manchester and Birmingham both get 3tph. 2tph in the off peak should be enough really
In my view the busiest off-peak VT trains on the WCML (ie the route needing more services first) are the Glasgow fasts, as far as Preston.
The new Blackpool services do a bit to address that problem.
But VT is short of trains, so another route would have to lose out to provide 2tph to Liverpool or Preston, at least in the short term.
And then we have the perennial problem of 5-car Voyagers on some London-Birmingham-Scotland services.
Liverpool is at least pretty sure of its 11-car 390s.
It would also enable the 221's to be removed from running solely under the wires.
They would need to be tilting, which would push the cost up, but they could be useful post HS2 where there could be less need for long trains.
I also fear the DFTs decision to choose 5 car 800s will prove equally short sighted in the next few years....This comes up every couple of months. It's really not the big issue it's made out to be, plus the only place them having tilt is used is under the wires.
Pretty much every instance where "shorter trains will be enough" has actually happened has turned out to be wrong - CrossCountry, East Midlands, Hull Trains, class 170, 171, 180, 220, 221. And on VTWC itself 390s have been lengthened twice and originally the 4 coach 221s were to be used for the off-the-wires services. All were proved to be short-sighted, so I'd be hesitant to suggest going down that route again.
I also fear the DFTs decision to choose 5 car 800s will prove equally short sighted in the next few years....
I don't believe theres any spare paths on the WCML to add more services.
Afraid I have to agree with that unless the are splitting and joining as 2*5 car trains for the busiest sections.
Without really knowing, I always assumed the 5 cars must have been intended to always be 2x5 into/out of Paddington and split, but not knowing the Great Western very well at all I don't know where the realistic places to split at and routes are. Is that the intention?
My only "regular" journey is Weston-super-Mare/Taunton/Bristol to/from London. I don't really see how splitting those could be very useful - for a Weston terminator you could possibly terminate 1x5 at Bristol (although as HSTs these are often very busy), or for through services you could split and send one unit via Weston and one via Taunton, though there doesn't seem to be much point in that and you'd end up a service running not long after the last from Taunton. I suppose there must be other locations where it's more practical.
I know the East Coast Main Line better, but still wonder just how they'll be sensibly used there too.
Isn't the xx33 path still available in most hours?
Can't believe that an hourly service to London is sufficient when Manchester and Birmingham both get 3tph. 2tph in the off peak should be enough really
The GWML is likely to be 10 coach units to Oxford, Cardiff, Exeter/Plymouth.
WCML would be broadly the same services as at present (as all the 9/11 coach units would stay), but with the option to run 12 coach trains with a split at Birmingham, Crewe or Manchester to serve stations beyond.
There could be an option to run short units early morning/late evening to provide extra services.
You're right. 11 car pendos are 253m and another car would make it about 276. That would be a problem on many platforms at Euston (but not all) and lots of other stations.Would 12 coach trains fit into Euston? 11 coach pendolinos seem to only just fit in some of them, and then the stations they'll call at might be a problem. Crewe certainly has exceptionally long platforms, but where else?
I don't think there'll be many opportunities to run short trains into Euston in the early morning - from wherever these services originated by the time they arrive on the south WCML and at Euston it'll be London rush hour, which is one reason the morning voyager arrivals have all joined and are full length trains. Not doing that would be a big waste of capacity
You're right. 11 car pendos are 253m and another car would make it about 276. That would be a problem on many platforms at Euston (but not all) and lots of other stations.
Not as easy as that sounds!
Oh, but it's fine, as that was the solution (12 coach trains to everywhere) rather than building HS2!
Two serious points, firstly it wouldn't be all services so it could be possible to (mostly) just timetable then to use the longer platforms, possibly paired with lengthening a few of the easy to do platforms. Secondly with automatic selective door opening there's probably few platforms elsewhere which would cause a problem if the first/last two doors weren't able to be used.
Oh, but it's fine, as that was the solution (12 coach trains to everywhere) rather than building HS2!
Two serious points, firstly it wouldn't be all services so it could be possible to (mostly) just timetable then to use the longer platforms, possibly paired with lengthening a few of the easy to do platforms. Secondly with automatic selective door opening there's probably few platforms elsewhere which would cause a problem if the first/last two doors weren't able to be used.
Arent West Midlands Trains extending a hourly Liverpool-Birmingham service to London from the end of the year? Theres your 2tph off peak.
I don't believe theres any spare paths on the WCML to add more services.
Arent West Midlands Trains extending a hourly Liverpool-Birmingham service to London from the end of the year? Theres your 2tph off peak.
But realistically nobody is going to board the WMT service at Liverpool all the way to London all stations via Birmingham and Northampton.