There's a simple solution.. start to do some route maintenance work to the bridge and then, whoops, blow it up by accident!
Judi Drench, The Cast of Spooks and the man from Sky1's Spy are all outside your house as we speak
There's a simple solution.. start to do some route maintenance work to the bridge and then, whoops, blow it up by accident!
There are no plans for a bay platform at Stevenage. None.
It's not just East Coast passengers that want to travel via the loop, but passengers from other FCC stations. Again, I insist that all up trains should run from the same side of the station.
Isn't the Hertford Loop being used now/soon to test new signalling? Upgrade that and create some passing loops and it's surely worth doing whatever happens along the ECML? Trains closer together, able to run faster etc..
In fact, is there any other station (or in between two stations) that could allow for passing loops to allow an additional overtake for what might eventually become a more regular all-station service (whether part of LO or not)?
I'd expect there's a fair few people along the Hertford Loop that might want to get to Stevenage for onward trips along the ECML and to Cambridge etc.
When I've needed to go from Hatfield to Hertford, I've gone via Stevenage. I've often considered it might be quicker (given the poor connection times at Stevenage) to go via London though.

ECML will get ETCS up to Doncaster from 2019 IIRC. This should . . . . allow greater capacity along this critical section through Hertfordshire.
Although a great supporter of more modern control systems, I am yet to be convinced that ETCS will allow following fast trains to pass magically through trains stopped in Welwyn North platforms, which is the key capacity limiting factor on the double track section.
Although a great supporter of more modern control systems, I am yet to be convinced that ETCS will allow following fast trains to pass magically through trains stopped in Welwyn North platforms, which is the key capacity limiting factor on the double track section.
Exactly, imagine if Hatfield only had a hourly service northbound in the off peak Monday to Friday and at weekends, you get to the station to find the hourly service has been cancelled so you're now looking at a 2 hour wait especially if you're just missed the last train.
Would that be attractive to you, no I wouldn't say it would be but increase the service to a half hourly service and it's not so bad.
I would say it would be a safe bet that if services were half hourly north of Hertford, then passenger growth would show this to be a good idea, it's only because demand is suppressed that the demand isn't obvious.
At weekends, it is very possible to extend the hourly Hertford terminator though to Stevenage without delaying any services - for example you have the xx:47 and there's nothing using platform 4 until xx:12 so you could get a train to terminate at xx:50 and depart at xx:00 which is just 10 mins and it still be on time by the time it's supposed to leave Hertford.
Granted this removes any service recovery by starting a service back from Hertford BUT it makes much better use of the driver and of the rolling stock to provide a improved service.
In fact, I've done a SimSig timetable which shows this is viable to do and can be done![]()
Is there any particular reason Welwyn North can't be rebuilt so that the platforms are on loops?
It could, but honestly, there's not enough space without dozing the existing station and taking away from the car park. That's the simple reason.
Probably not, but I think that'd make the problem far worse. Each stopping train would then eat into more capacity overall.
Taking a headway of three minutes, for example, a stopper would take up just over 1.5 paths if it took two minutes longer between Digswell and Woolmer Green. If it went inside, it'd take up at least two paths (one either side of Welwyn North), and probably a bit more if the entry and outlet from the loops were quite restrictive (especially with approach controlled signals going in). I'd still suggest, without knowing the exact timings and headways involved here, that there'd be an overall loss of paths!
As far as the increase in journey time is concerned, I reckon you'd do well to get one fast past with a five minute dwell in the loop. Probably three minutes (again depending on the headway you can get away with) between the stopper arriving to the first fast passing, then probably another two (on paper at least) until the stopper can depart. I'm sure you could tighten that up, especially with thoughts of more advanced control systems that are floating around (and, I'm sure, a long way off yet!), but at the cost of some breathing space if one train or the other manages to lose a half minute or two somewhere.
I could get 5 paths extra to Stevenage with only modest investment. What other ideas give extra paths?
My idea is to send 4 trains around the loop and join together some OA operators at King's Cross and split them further North.
I guess it might be possible to join/split trains at Stevenage/Hitchin. A 4 coach train from Peterborough joins an 8 coach from Cambridge. That's a path saved. Do that twice an hour for 2 paths an hour.
So we've got 7 new paths with no changes at all on the Welwyn infrastructure
Can anyone confirm what the top speed is over Welwyn? Is there much 100+ mph running in the area?
From Sectional Appendix:
http://www.networkrail.co.uk/browse...x/london north eastern sectional appenidx.pdf
See module LN2 page 19 . . . .
115 both fast lines from South of Potters Bar to Woolmer Green then 125 beyond, EXCEPT up fast line limited to 105 through both Welwyn North and South tunnels.
Please note this is not from the live updated system so may not include any late changes.

From Sectional Appendix:
http://www.networkrail.co.uk/browse...x/london north eastern sectional appenidx.pdf
See module LN2 page 19 . . . .
115 both fast lines from South of Potters Bar to Woolmer Green then 125 beyond, EXCEPT up fast line limited to 105 through both Welwyn North and South tunnels.
Please note this is not from the live updated system so may not include any late changes.
Would I be right in saying that one way to increase the number of paths per hour would be to lower the line speed? Has that been considered or is the consequent increase in journey times more than could be accepted by the various interested parties?
Sending four trains an hour via the Hertford loop? Which four? The East Coast services to Leeds/ Newcastle/ Edinburgh? The Cambridge "fasts"? Would all four paths an hour cope with the three stoppers on that route? Presumably at least one would clash with a 313 somewhere? Is it worth slowing them down that much?
I would send the two non-stop Cambridge and the semi fast Finsbury Pk>Stevenage services
If the signals remained where they are, a reduction in speed would only result in a LOSS of capacity, as each train would take longer to get through each fixed length block
If the signals remained where they are, a reduction in speed would only result in a LOSS of capacity, as each train would take longer to get through each fixed length block. The capacity could only be increased thereby whilst also reducing the signal spacing to suit that new lower speed, resulting in more signals overall. Positioning of the existing signals through the area was no doubt particularly difficult however, trying to maintain consistent spacing despite the tunnels limiting sighting, and together with the viaduct and station, restricting the places where it is safe to stop a train at a danger signal. A wholesale renewal of the system through that area with more, closer spaced signals would be a very complex and costly exercise given those layout constraints, and lowering the linespeed I believe would be sufficiently unpopular amongst operators (particularly the longer distance ones) to make it unviable.