I don’t think there are many TOCs that haven’t had the odd safety incident over the past couple of decades, their main competitor included, yet nobody else seems to get quite the same amount of flak as WCR.Apart from the odd safety incident....
I don’t think there are many TOCs that haven’t had the odd safety incident over the past couple of decades, their main competitor included, yet nobody else seems to get quite the same amount of flak as WCR.Apart from the odd safety incident....
Nobody else has been banned from the network though, twice at that that's a record to shout about, operators don't get banned for nothingI don’t think there are many TOCs that haven’t had the odd safety incident over the past couple of decades, their main competitor included, yet nobody else seems to get quite the same amount of flak as WCR.
I don’t think there are many TOCs that haven’t had the odd safety incident over the past couple of decades, their main competitor included, yet nobody else seems to get quite the same amount of flak as WCR.
Separate to the CDL issue which is not linked to a specific safety incident involving them, is there evidence WCR have not sought to fix the things which have led to safety incidents in the past? Surely if they hadn’t they would not have got their licence back following losing it nearly 16 years ago, and I don’t doubt they have been under higher scrutiny since.That's because most TOCs seek to fix the things that led to the safety incident and are apologetic rather than arrogant about it.
WCR have had 2 prohibition notices issued against them, and had the operating license suspended, in the period of just over 10 years. I don't think that they're actively unsafe, but they are by no means a particularly scrupulous operator.West coast have operated for years, they have a license so they must be following procedures, they are regularly inspected by the ORR and given the fact the operating licence is still going, id say thats proof that they are safe.
Add a very prominent prosecution for Wootten Bassett and a failed court case attempting to avoid safety requirements.WCR have had 2 prohibition notices issued against them, and had the operating license suspended, in the period of just over 10 years.
Yea I suppose.And they say that comedy is dead these days.
Yea that I also agree with, butApart from the odd safety incident....
Once I see a full rake put together with working CDL fitted, then I'll celebrate.at least they've finally stopped shooting themselves in the foot with the CDL
I acknowledge that WCR does a lot for getting people interested in the railway. However, they also have had a historically awful safety record, which is very difficult to forgive.This bashing of West Coast by so called enthusiasts sickens me to be honest, that company has, despite its faults, given so much to preservation and enjoyment for the general public over the years (regular Scarborough Spa Express as well as the Jacobite).
If someone is that determined then CDL won't make a difference, they'll just pull the green handle.basically pretending that their incident in 2022 where a passenger managed to overpower said steward didn't happen
But at least with the accompanying brake application, rather than with a door just swinging open in the breeze at linespeed!If someone is that determined then CDL won't make a difference, they'll just pull the green handle.
As far as I'm aware, CDL on loco-hauled coaches doesn't usually effect a brake application if an egress handle is pulled?But at least with the accompanying brake application, rather than with a door just swinging open in the breeze at linespeed!
I would expect a newly installed system to do so, though? But that’s merely my own assumption, I’ve no idea what the standards might say about it!As far as I'm aware, CDL on loco-hauled coaches doesn't usually effect a brake application if an egress handle is pulled?
On the original CDL the external lights tell you the open/closed signal has been received at that doors control panel only, they don't confirm the bolts have retracted or deployed, you need to check the internal indicators at each door to confirm the bolts have deployed. As above there wasn't any connection between the Green emergency release handle and the brake pipe, even if there was the door would still have been open at speed until the train had stopped.The claim against the regulation was indeed that having stewards is as safe as CDL, which is some claim given, no doubt amongst other things:
And that is before considering whether the train actually has the number of stewards required by the exemption.
- Adding a steward per coach introduces another point of communication failure / misunderstanding / etc. to the operation
- CDL has external tell-tale lights. Dispatch cannot tell whether manual secondary locks have been applied
- Potential for interlock, as discussed above
Given recent events I suspect they are glad they didn't take bookings since their costs will now have increased significantly, at least they can up their prices if they do run this season.Wording on WCRC's website has changed ever so slightly,
View attachment 201310
But bookings are still not open.
I'm afraid that wording change was a while back.Wording on WCRC's website has changed ever so slightly,
View attachment 201310
But bookings are still not open.
You bring good points. They got a lot of slack for their "steam diesel" mismatching last year from tourists who just wanted a steam engine (to be fair it's stated that there are no guarantees)At the moment, they only have 2 air fitted steam locos, and only 1 is passed for the Mallaig road, 34028 will be resuming its main line duties soon, but i believe its only operating from Southall,
So if there are more than 2 steam hauled tours in the same week, one will have to be hauled by diesel, then there's washouts, maintenance etc,
Tangmere, is maintenance heavy, leaving just 45407 to operate the Jacobite's, 44871, is undergoing a full heavy overhaul, so won't be available several months, and 34028 is intended to handle the workings out of Southall,
I think the reason is because at the moment 45407 is needed to operate other charters, so there is no availible steam loco for the Jackobite .
Not a hope in hell, I think some diesel tours would be nice thoughYou bring good points. They got a lot of slack for their "steam diesel" mismatching last year from tourists who just wanted a steam engine (to be fair it's stated that there are no guarantees)
But if only 1 loco is available, bringing it back to the first post on this thread:
Will the afternoon train run
Or will they accept a 1 train operation?
Still, they need to think of something quick - as they are certainly not running from the 1st April, in 2 days time I wouldn't have thought
HST!Not a hope in hell, I think some diesel tours would be nice though
How I would love to see that. It wouldn't be considered by WCR though I don't think, probably would be by LSL though. WCR don't want to lose the "Harry Potter" aspect that makes it their flagship serviceHST!
But did so as soon as those vile mk2s pitched up.WCR don't want to lose the "Harry Potter" aspect that makes it their flagship service
At least it was steamBut did so as soon as those vile mk2s pitched up.
Sorry but West coast only have themselves to blame, other operators of MK1's on the mainline, fitted CDL and can still operate without any known issue, On the other hand West Coast thought the rules only applied to other, and always have, its not 1968,, time and conditions have moved on,But did so as soon as those vile mk2s pitched up.
NYMR - Who take Mark 1 stock out onto the main railway (at least from Grosmont to Whitby) have door locking of some sort (minimal but enough) and enforce no window hanging very strictly along the last part of the line - but you're telling me WCR can't do it. They need to sort themselves out.Sorry but West coast only have themselves to blame, other operators of MK1's on the mainline, fitted CDL and can still operate without any known issue, On the other hand West Coast thought the rules only applied to other, and always have, its not 1968,, time and conditions have moved on,
Someone with in West Cast, made the decision, they were not going to do as every other operator has done, The exceptions were made to allow the fitting of CDL, not to kick the can down the road, and not fit it, everyone else complied they chose not to, At the same time someone decided they were not going to fit air braking equipment on their own locos. at a time when the only compliant stock able to operate on NR was air brake
As far as I’m aware NYMR have exactly the same arrangement as WCR used to have on their Mk1s - a secondary manual door bolt. I understand the ORR are more lenient towards the Whitby operation due to the lower speed involved (25mph).NYMR - Who take Mark 1 stock out onto the main railway (at least from Grosmont to Whitby) have door locking of some sort (minimal but enough) and enforce no window hanging very strictly along the last part of the line - but you're telling me WCR can't do it. They need to sort themselves out.
NYMRs dispensation is also strictly limited to between Grosmont and Whitby which is single track without any passing loops. I believe the argument here is that this operation therefore cannot interact with any other trains on the mainline (other than when in Whitby platform 2).As far as I’m aware NYMR have exactly the same arrangement as WCR used to have on their Mk1s - a secondary manual door bolt. I understand the ORR are more lenient towards the Whitby operation due to the lower speed involved (25mph).