• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

WCR - Jacobite 2026

Cheshire Scot

Established Member
Joined
24 Jul 2020
Messages
1,676
Location
North East Cheshire
....and B1s surely?
They were removed from the access agreement some years ago.

I'd guess maybe West Coast decided they did not have/did not want access to B1s, or maybe was it a civil engineering/track based decision.
Interesting to note in BR steam days Black Fives were not permitted to run to Mallaig - and when they were the chosen motive power in the 1980s revival (under BR!) the choice was the subject of much messroom discussion.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D6130

Established Member
Joined
12 Jan 2021
Messages
9,032
Location
West Yorkshire/Tuscany
I'd guess maybe West Coast decided they did not have/did not want access to B1s, or maybe was it a civil engineering/track based decision.
Interesting to note in BR steam days Black Fives were not permitted to run to Mallaig - and when they were the chosen motive power in the 1980s revival (under BR!) the choice was the subject of much messroom discussion.
In that case the Standard class 5s and B1s must also have been banned, I would have thought.
 

cats_five

Member
Joined
19 Sep 2021
Messages
238
Location
Scotland
<snip>

The only consistent is that people will always find a reason to complain at the introduction of new motive power/rolling stock.

Anything new gives some people a reason to complain, in any area of life. Change frequently induces rose-tinted specs for the past in some people, for things they complained vehemently about at the time.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,225
Location
"Marston Vale mafia"
The only consistent is that people will always find a reason to complain at the introduction of new motive power/rolling stock.

New rolling stock is one thing. Tatty old Mk2s with largely non-functioning aircon when you want to smell the steam locomotive is entirely another. This isn't replacing the regular 156 with a 170 or whatever (which I'd certainly consider an upgrade given how nice ScotRail's 170s are, though I'm aware they don't fit at present), it's selling a very specific experience which I think it could be validly argued that an aircon (working or not) Mk2 does not deliver.
 

Railwaycat

Member
Joined
15 Jul 2023
Messages
277
Location
Derbyshire
I see the paths are on Realtime for the Jacobite from the 1st April, but no paths for the stock move to Fort William.
 
Last edited:

WTT Gremlin

Member
Joined
1 Apr 2025
Messages
139
Location
Northampton
I see the paths are on Realtime for the Jacobite from the 1st April, but no paths for the stock move to Fort William.
Start date is as simple as it is when the firm rights period starts. Ancillary moves could be planned down to A4C* timescales.

*A4C - bid on day 1 to run on day 3
 

Gwr12345

Member
Joined
28 Jun 2020
Messages
284
Location
Delayed
A seemingly new development has occurred - WCR have ruled out the use of Mk2s this year, and instead appears to be waiting for an exemption from the ORR to run Mk1s on the Jacobite. https://www.heraldscotland.com/news...n-operator-waiting-learn-fate-rail-regulator/
The operators of the Jacobite steam train are waiting to find out if they can run this year's service with hinged doors that can be opened while it is moving.
Only a short quote as it's paywalled.
As with most WCR decisions at this point, it's certainly interesting. Good job they've built up so much goodwill with the ORR over CDL /end sarcasm.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,302
Location
Glasgow
A seemingly new development has occurred - WCR have ruled out the use of Mk2s this year, and instead appears to be waiting for an exemption from the ORR to run Mk1s on the Jacobite. https://www.heraldscotland.com/news...n-operator-waiting-learn-fate-rail-regulator/

Only a short quote as it's paywalled.
As with most WCR decisions at this point, it's certainly interesting. Good job they've built up so much goodwill with the ORR over CDL /end sarcasm.
I will be very surprised if an exemption is granted.

Thus, based on this self-imposed situation, equally surprised if the Jacobite runs this year - unless they u-turn later and run it with Mk2s...
 

Isle of Mull

Member
Joined
16 Mar 2025
Messages
300
Location
Ireland
I will be very surprised if an exemption is granted.

Thus, based on this self-imposed situation, equally surprised if the Jacobite runs this year - unless they u-turn later and run it with Mk2s...
If it were not to run I could possibly see the reduction of staff
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,460
Location
Sheffield
Now if I were the ORR I might consider a short term exemption to the end of June if half the carriages to be used were compliant and the others would be by 1st July.

So far no hints seem to have been dropped that such work is under way, or is it quietly happening?
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,124
One Mark 1 (99318) appears to have been fitted with CDL at Carnforth.
 
Last edited:

Railwaycat

Member
Joined
15 Jul 2023
Messages
277
Location
Derbyshire
One Mark 1 (99318) appears to have been fitted with CDL at Carnforth.

That's interesting as that's the one converted to a buffet - but was that done so it can run in the CDL mk2 rake? Has it got air brakes/dual braked (my ignorance if they are all dual braked)?
If it is intended for the Jacobite rake then others must be in the shops.
Of course, if a firm commitment (with work started) has been made, then the ORR are going to get it in the neck from the tourist industry, no matter what anyone on here thinks.
 

Isle of Mull

Member
Joined
16 Mar 2025
Messages
300
Location
Ireland
That's interesting as that's the one converted to a buffet - but was that done so it can run in the CDL mk2 rake? Has it got air brakes/dual braked (my ignorance if they are all dual braked)?
If it is intended for the Jacobite rake then others must be in the shops.
Of course, if a firm commitment (with work started) has been made, then the ORR are going to get it in the neck from the tourist industry, no matter what anyone on here thinks.
I’d hope they’d have the cop on to do a mk1 set for RTC tours too, and some of the Pullman carriages too
 

H F Stephens

Member
Joined
26 May 2024
Messages
94
Location
England
That's interesting as that's the one converted to a buffet - but was that done so it can run in the CDL mk2 rake? Has it got air brakes/dual braked (my ignorance if they are all dual braked)?
If it is intended for the Jacobite rake then others must be in the shops.
Of course, if a firm commitment (with work started) has been made, then the ORR are going to get it in the neck from the tourist industry, no matter what anyone on here thinks.

The ORR is unlikely to face much (if any) opprobrium from the tourist/hospitality industry.

They know exactly who the bandits are, and would (largely) be happy to see them driven out of Dodge, if only there was a replacement ready to ride in straight away.

As it stands, some businesses are facing dire futures, but most are probably still siding with the sheriff.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,124
99318 has had its buffet section replaced by seating bays with windows. The vehicle is dual-braked.
 

Railwaycat

Member
Joined
15 Jul 2023
Messages
277
Location
Derbyshire
99318 has had its buffet section replaced by seating bays with windows. The vehicle is dual-braked.

That's even more interesting, a buffet could be done to go with the a/c mk 2's, but no point in an ordinary mk 1 open unless more are being done.
The ORR is unlikely to face much (if any) opprobrium from the tourist/hospitality industry.

They know exactly who the bandits are, and would (largely) be happy to see them driven out of Dodge, if only there was a replacement ready to ride in straight away.

As it stands, some businesses are facing dire futures, but most are probably still siding with the sheriff.

You know that for definite? That there could be a feeling that health and safety is being taken too far - a lot of people do take that opinion these days.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,808
Location
Newport
A further exemption for WCR would probably go down badly with those who have paid the price of compliance and who would see non-compliance as obtaining an unfair commercial advantage.
 

Railwaycat

Member
Joined
15 Jul 2023
Messages
277
Location
Derbyshire
A further exemption for WCR would probably go down badly with those who have paid the price of compliance and who would see non-compliance as obtaining an unfair commercial advantage.

They've agreed to comply, but want to be given time so that the Jacobite can run - there's no commercial advantage because no one else wants to run the Jacobite, they simply don't have the resources.

== Doublepost prevention - post automatically merged: ==

The only party responsible for the current situation is WCR.

That might not be the way the general public and others see it when they know they've agreed to comply.

This bashing of West Coast by so called enthusiasts sickens me to be honest, that company has, despite its faults, given so much to preservation and enjoyment for the general public over the years (regular Scarborough Spa Express as well as the Jacobite).
 
Last edited:

Killingworth

Established Member
Joined
30 May 2018
Messages
6,460
Location
Sheffield
Why, given the conduct of WCR to date?
Which is why it would be conditional for only 3 months. But it seems even that level of compliance can't be met for 2026.

Is there any indication of action to achieve full compliance for 2027? If not it's the end of WCR running the Jacobite. Is it a viable project for anyone else?
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,984
Location
UK
Rather like bei
They've agreed to comply, but want to be given time so that the Jacobite can run - there's no commercial advantage because no one else wants to run the Jacobite, they simply don't have the resources.
That isn’t what the commercial advantage is; if a business is permitted to continue trading without having to comply with requirements which others within the same sector have been forced to adhere to, that places the business at a financial and therefore commercial advantage. They don’t need to be all competing for the very same work, it’s merely the principle that one firm has costs of X&Y, and another has been allowed to incur only X and not worry about the further expense of Y.

WCRC have done well out of their exemptions, however it is now time to comply with legislation. If they genuinely cannot, or simply will not, then they would be unable to continue with the operation as it would be unlawful. Similar situations exist throughout all manner of other industries.
 
Last edited:

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,808
Location
Newport
there's no commercial advantage because no one else wants to run the Jacobite
Only true if an exemption were limited solely to the Jacobite.
no one else wants to run the Jacobite, they simply don't have the resources.
There’s a full length set of fully compliant main line mk1s in Scotland with SRPS. Didn’t LSL assist with making them compliant as part of a commercial arrangement? Locos? Riley could no doubt help out.
 

GB&K Joint

Member
Joined
9 Aug 2020
Messages
23
Location
UK
Only true if an exemption were limited solely to the Jacobite.

There’s a full length set of fully compliant main line mk1s in Scotland with SRPS. Didn’t LSL assist with making them compliant as part of a commercial arrangement? Locos? Riley could no doubt help out.
You are right LSL was heavily involved in assisting with completion of the compliance programme for the SRPS vehicles.

However, the SRPS mark 1 set is engaged on their own rail tour programme this summer and the Bo’ness branch service is supported by vehicles from the set at busy times such as galas so would not be available for a seven-days-a-week service at Fort William.
 

SwindonManor

Member
Joined
9 Jul 2024
Messages
138
Location
Devon
If I may quote WCR: They still say about the announcement in coming weeks, BUT they have changed the running dates from last year's timings at last - to;
Running from TBC
Under both morning and afternoon departures
I believe only the Lune Rivers Trust and Muncaster Express are confirmed for this year thus far overall for WCR.

== Doublepost prevention - post automatically merged: ==

So it makes me wonder how much trouble are WCR really in?

== Doublepost prevention - post automatically merged: ==

This bashing of West Coast by so called enthusiasts sickens me to be honest, that company has, despite its faults, given so much to preservation and enjoyment for the general public over the years (regular Scarborough Spa Express as well as the Jacobite).
I do partially agree. WCR is an alright company with cheap fares. At least they're finally sorting out CDL in some way.
 
Last edited:

31160

Established Member
Joined
18 Mar 2018
Messages
1,274
And they say that comedy is dead these days.
Fully agree they have made this mess all by themselves, they were fully aware that CDL was on the horizon and chose to go to court and spend money on lawyers instead of their stock, that was wise not!
 

CDM Transport

Member
Joined
26 Aug 2022
Messages
334
This bashing of West Coast by so called enthusiasts sickens me to be honest, that company has, despite its faults, given so much to preservation and enjoyment for the general public over the years (regular Scarborough Spa Express as well as the Jacobite).
Absolutely agree with this. WCR have continued to run excursions throughout 2025 albeit these issues and enthusiasts have been tearing them to shreds on the regular. They have been brilliant in the past as you say.
 

Top