Class 37s.No.
Not without a lot of route learning/ conducting - and drag with what?
Class 37s.No.
Not without a lot of route learning/ conducting - and drag with what?
Could they not drag them over the Settle to Carlisle?
Virgin a decade or more ago.So who threw away the diversionary route knowledge?
which proves my point that private sector motivations shouldn't be allowed to dominate public sector/infrastructure planning and investment in resilience.Virgin a decade or more ago.
At a certain threshold yes, but the 2hr at best of the Bolton - Clitheroe - Settle route is just not feasible sadly for most.I think a good number of people would prefer the train.
Based on experience of previous engineering work, each Pendolino from the south will have barely enough passengers to fill half a bus going north from Crewe, Warrington or Preston at this time of year.
and that's a good thing?Based on experience of previous engineering work, each Pendolino from the south will have barely enough passengers to fill half a bus going north from Crewe, Warrington or Preston at this time of year.
"Putting passengers first" rings true...I expect there could well have been an element of Top Trumps assumed as well "our job is more important than yours", it has happened in the past.
Presumably NR56 is being replaced with NR60Mk2 though?Renewals. Its not an enhancement job.
No idea, im no track engineer."Putting passengers first" rings true...
Presumably NR56 is being replaced with NR60Mk2 though?
It's an opinion.which proves my point that private sector motivations shouldn't be allowed to dominate public sector/infrastructure planning and investment in resilience.
says for 3 full weekends and a Sunday no trains at all through Preston...
and looking at NR journey planner, every single Avanti train journey is split between 2 buses Wigan to Preston and Preston to Lancaster. Hasn't it occurred to them that through passengers don't need to go into Preston to change (losing yet more time and taking more buses for the same work) in the process?
There will be benefits from the work being done, but probably nothing worth a headline other than "more reliable journeys".
Preston, like Carlisle, did not see any local improvements during the big WCRM project, and the skids are under the promised "HS2 upgrade" to the layout.
There is a flat double junction well out of the station with a 35mph turnout. It would be very useful if that could be enhanced.What works are being done at Preston?
Simple renewals or will we see any benefits overall?
No one is going to touch the layout at Preston until it is decided what layout is needed for ETCS.There is a flat double junction well out of the station with a 35mph turnout. It would be very useful if that could be enhanced.
Plenty of potential Thunderbirds at Carnforth, complete with crews who know the routeThose days are long gone I’m afraid. Avanti & Virgin before them chose not to continue with S&C route competency for drivers so not even Voyagers have that option now.
The issue isn't moving the trains over the line, the issue is more the terrible stock utilisation you get going by the S&C. You end up at Carlisle awkward in the middle of two paths forward to Glasgow so either have to retime everything on one end of the WCML or sit around at Carlisle for ages waiting to drop in to the next path. And then you have to diagram everything.Plenty of potential Thunderbirds at Carnforth, complete with crews who know the route
So run Preston-Carlisle shuttles using WCRC coachesThe issue isn't moving the trains over the line, the issue is more the terrible stock utilisation you get going by the S&C. You end up at Carlisle awkward in the middle of two paths forward to Glasgow so either have to retime everything on one end of the WCML or sit around at Carlisle for ages waiting to drop in to the next path. And then you have to diagram everything.
Plenty of potential Thunderbirds at Carnforth, complete with crews who know the route
So that would require people to change trains twice? Changing to a coach and going up the M6 would still be quicker.So run Preston-Carlisle shuttles using WCRC coaches
I'd do it.So run Preston-Carlisle shuttles using WCRC coaches
I think a lot of passengers would prefer that even with the layovers required at Carlise and Preston.The issue isn't moving the trains over the line, the issue is more the terrible stock utilisation you get going by the S&C. You end up at Carlisle awkward in the middle of two paths forward to Glasgow so either have to retime everything on one end of the WCML or sit around at Carlisle for ages waiting to drop in to the next path. And then you have to diagram everything.
Would they prefer a +25% surcharge on the ticket to make up for the additional costs?I think a lot of passengers would prefer that even with the layovers required at Carlise and Preston.
No because many probably appreciate that’d just be a whim of the current cost & operating structure in similar style to many of Dr Beeching’s antics of their day, rather than a fundamental problem with rail diversionary routes likely utilised in a similar manner for over a century already.Would they prefer a +25% surcharge on the ticket to make up for the additional costs?
If you're going to use that as an argument, have you considered that the logical conclusion is to completely shut the rail network and replace it with cheap buses?Would they prefer a +25% surcharge on the ticket to make up for the additional costs?
Come on, be realistic...Would they prefer a +25% surcharge on the ticket to make up for the additional costs?
well if they keep making it so difficult to use at weekends then that is what people will naturally do for themselvesIf you're going to use that as an argument, have you considered that the logical conclusion is to completely shut the rail network and replace it with cheap buses?
I'm sure the thought has occurred at the Treasury.If you're going to use that as an argument, have you considered that the logical conclusion is to completely shut the rail network and replace it with cheap buses?
Will be very last minute to make a decision based on ticket bookings... given the Saturday tickets are often released only days in advanceThe Wigan-Preston and Lancaster-Preston buses in the timetable are listed as operated by Northern/TPE, replacing their services, and continue through Preston to Blackpool, Buckshaw or Manchester. Hence is the issue just that Avanti buses haven't been added to the timetable yet, given how last-minute their planning is these days?
You’d be surprised at the lack of training offered even mid level managers at many TOCs.What level of manager do you think is planning the replacement bus services to never have seen a train?