Sleeper services, in their current
format, are a very labour-intensive
operation. This is especially true of the
‘Caledonian Sleeper’, where rakes are
split and joined to serve different destinations
from one service.
At Carstairs, the Lowland Sleeper from
London Euston to the Central Belt splits, with
portions running to Edinburgh and Glasgow.
At Edinburgh, the 18-coach 2115 Highland
Sleeper departure from Euston is split into
three portions, with trains then running to
Aberdeen, Inverness and Fort William. The
reverse happens on the return journey, with
the three portions formed into one train which
then heads south.
Yet these services provide a vital link for
long-distance travellers. Plus, by avoiding
daytime travel, business users can boost their
productivity. The Sleeper saves a day each way
- it is possible to work a full day in an office
anywhere within range of the M25, catch the
Sleeper, and arrive (refreshed from a night’s
sleep) for an early meeting hundreds of miles
away.
Leisure travellers also make good use of the
Sleeper - it is quite common to see couples or
even parents with young children using the
Sleeper as their means of travel for a holiday or
a weekend break.
However, the labour-intensive methods of
working have confined Sleeper operations
to two core routes in the UK for the past two
decades.
So is it possible to increase flexibility and
reduce costs without compromising service
levels - and possibly even allow a modest
expansion?
I believe this can be done by means of
a carefully designed purpose-built fleet
of Electro-Diesel Sleeper Multiple.....
( Continues for several pages with pictures .)