or after 7pm so it would not doubt have required First to operate evenings and Sundays like the 64 which possibly First in this instance were not willing to do.Connexions were willing to take it on commercially, but it would have meant they'd have to withdraw their X1 services. Obviously it more than likely wouldn't have run on a Sunday
Not really enough time to work that off a X70, or short 7, without adding a vehicle. Its around 14 min duty with fast X70s having a 45 minute in the hour running time (and Transdev give the 7 more time)The Deighton Bar extension could stay on a couple of am peak southbound and pm peak northbound, otherwise cover it with something else on a reduced frequency (the 8? or off the X70?).
Travel West Yorkshire forumWhere is that, please?
== Doublepost prevention - post automatically merged: ==
A bus may have broke down in Collingham but all 4 X98/X99 vehicles have been tracking all day.Chaos in Collingham today with one of the X98 buses breaking down between two busy junctions causing long tailbacks in both directions.
Last edited: