Spartacus
Established Member
- Joined
- 25 Aug 2009
- Messages
- 3,806
When is the next set coming to Manchester
Not sure, I'm hoping to see the current ones out on test before too long.
When is the next set coming to Manchester
Yes it's been six weeks since the first move and three weeks since the second move. That means that logically, a third move should've taken place today but I've checked Levenshulme all hours of the day today and nothing's showing from Portbury
If TPE are using S boards now (rather than variable ones for different formations, as installed previously at Dewsbury and Huddersfield), why the type-specific boards?Not sure if this has already been mentioned on here but I noticed today at Brighouse that class 68 stop marker boards have been installed. I can only assume as Brighouse is not a regular TPE calling point other than when diversions are in place that these have been installed for that scenario. Here’s a pic of them
https://www.flickr.com/photos/railphotosonline/43405508671/in/datetaken/
Possibly because a 397 (≈118m), an 802 (≈130m) and a 68+mark5s (≈132m) won't all the be the same length?If TPE are using S boards now (rather than variable ones for different formations, as installed previously at Dewsbury and Huddersfield), why the type-specific boards?
According to the latest internal "Fleet Update" ........
Some paths have appeared in Realtimetrains which I believe maybe test run paths but I would be surprised if they run next week. http://www.realtimetrains.co.uk/sea...18/07/16/0000-2359?stp=WVS&show=all&order=wtt
If TPE are using S boards now (rather than variable ones for different formations, as installed previously at Dewsbury and Huddersfield), why the type-specific boards?
Technical question - would these rakes / sets work in multiple?
Technical question - would these rakes / sets work in multiple?
I only ask because on a recent visit to Belgium, I noticed that during morning rush hour SNCB ran a locomotive sandwiched between two "set" rakes of double-decker stock back to back. Could be a handy option to have for specials or limited peak expresses if the Mk. 5s can do it too, but it would depend entirely on whether a 68/88 could provide the gubbins to both sets at once - and platform lengths, of course.
FWIW the SBB also have all kinds of combinations with RE460's and up to 14 carriages. A single locomotive might be at the end, or sandwiched in the middle, or there might even be two locomotives (usually one at each end, but sandwich + end can happen). There's no real fixed "set" in these trains (to be completely pedantic: a fixed set gets carriages and locos added on either end in arbitrary order), and I have no idea how the heating is decided.We have (kind of) those things running in multiple in the Netherlands (DDAR train sets with an NS 1700 loco or mDDM loco, both with auto coupler) and it's the same principle used for the RailJets in Austria:
The ETS is per train set, so when you switch on the ETS, both engines will provide the power for their own train set.
The move from Portbury is running. 33L at Castle Bromwich. I assume this is the 3rd set?