This sums up the hatred of some posters here. It's not clear whether they want to see a better train service or see a particular TOC punished. The two are neither mutually exclusive or dependent.
GTR have failed with everything they have promised hence why I want them out.
My dislike for them has come with the performance of the franchise. The years of driver shortages, declining standards and lies and lack of admission they have done anything wrong. Surely you don’t believe this is all down to network rail. Surely you don’t think the lie they told today was acceptable? They haven’t delivered what they promised today (as usual and as expected). GTR won’t get punishment because of the bribe they paid DFT until September. Good business sense that I hope sees some heads roll in the government.
But for me the final straw is when they started lying to passengers. I can’t see how we will get a better service under GTR. Perhaps you will enlighten me. But mine and other passengers views of the GTR management are by experience. I want a better train service. With GTR not making profits out of their current poor performance. They are currently getting rewarded for failure.
Have they ever given a sincere apology? I don’t remember one. They normally apologise and deflect the blame onto someone else. Ie not an apology. The contempt they show passengers is unacceptable. Passengers are an inconvenience to them. If they were genuinely sorry and admitted their failings again i May have a different view of them.
I know you have stated you don’t commute any more. But when you need to leave home 1 hour earlier than you used to to get to work at the same time or when you previously had 8 trains per hour into London and sometimes you only get 1 you will be unhappy. Let’s say this stabilises the service. This is still a long way below the May 2018 timetable and in fact below the May 2017 timetable. GTR won’t say if / when they will be able to deliver they May 2018 timetable. That is before we even think about rail plan 2020. Will it ever happen? So let’s say the reduced timetable works next week. When the company running the franchise doesn’t know when we will get back to 2017 levels of service doesn’t really inspire confidence they are capable of delivering any kind of improvement. If next week is classed as a success we have really let our standards slip. Delivery of the full timetable should be the definition of success. Are GTR capable?