Only at the rate drivers can be trained.Surely we should be expecting some kind of improvement, albeit gradual.
Only at the rate drivers can be trained.Surely we should be expecting some kind of improvement, albeit gradual.
All Thameslink or were Southern getting cancelled as well?

However, Tory voters in the Home Counties will require far more than mere travel turmoil, job losses and family life destruction to change their ingrained voting habits, so nothing will change there.Tory MPs loyalty will only last so long. Their constituents are some of the victims of this shambles, and MPs, especially in more marginal seats, will be extremely concerned that they will lose votes due to this, especially if the election is soon and they've not been seen taking some sort of action!
However, Tory voters in the Home Counties will require far more than mere travel turmoil, job losses and family life destruction to change their ingrained voting habits, so nothing will change there.
I'm on the 0954 service from Peterborough to Horsham (9J23) this morning:-
You don't have to convince them all. Some seats are very safe yes, but plenty in the home counties start turning red with a 5% swing from voters in the middle. Not good for a party with a razor thin majority.
However, Tory voters in the Home Counties will require far more than mere travel turmoil, job losses and family life destruction to change their ingrained voting habits, so nothing will change there.
Arlesey and Sandy might be faring a bit better right now if they didn't have a Conservative MP with a majority of 20,000+.
Currently on the thameslink service that's now expected to terminate at dartford instead of luton. So now I'll have to wait for another bloody train for abbey wood. Seriously when will this nightmare end!?![]()
Delay Repay claims must be soaring through the roof.
With the reduction in trains from those in the Railplan2020 timetable (and not including ad hoc on the day cancellations or delays) there must be a huge number of people who intended to catch these removed trains and now have to catch a later one.
What makes it worse is that there are additional Southern trains that run in the peaks but in the morning they only run between Wimbeldon and Sutton and that direction seems to have Thameslink trains anyway.wow things are really bad on Thameslink this morning - a 2 hour gap between services from Sutton to Wimbledon during the morning rush hour peak.
if this was a one off I could understand, but from what i have been reading this disruption could last until at least August ??
They aren't an option at all unless you live in North Islington or Hackney/Stoke Newington.Corbyn and Abbott are hardly an option though!
It will be interesting to read an independent report into such a monumental failure to deliver the GTR timetable change which has been in the planning for so long...….
The Secretary of State for Transport isn't there to manage the railway system, which is the job of the TOCs,
The job of the TOCs is to manage their own franchised operations. Not 'the railway system'.
I'm on the 0954 service from Peterborough to Horsham (9J23) this morning:-
On time departure from Peterborough
at 1046
Running to time all the way to just before Hitchin, where it sat for 5 minutes to allow the (1T19) service (the 0910 from King's Lynn to King's Cross) to go in front of it!!!*
The 9J23 is currently (as I type this) just South of Knebworth running 5 minutes late, whilst the 1T19 service is on Welwyn Viaduct (running 10 mins late)
* It did EXACTLY the same yesterday!!!
1049
The 9J23 has just been given the go ahead to go into the 2 track section between Welwyn & Knebworth in front of 1A70 (the 0756 from Bradford to King's Cross) - which WAS running on time, but is now also 5 mins late (after it stopped at the protecting signal for the 2 track section - it's last stop being Doncaster!!!)
1113
The 9J23 has just left Finsbury Park (ironically whilst crossing over the viaduct there it went over the 1A70 !!!)
It's now in St Pancras International running 3 mins late.
1126
Arrived at Blackfriars (3 mins late) - departed 4 mins late
1134
Depart London Bridge - 3 mins late
1146
Arrived East Croydon - 2 mins late
Where I've got off.....![]()
Yes, 'the railway system' is regulated by and funded through the Department for Transport, which in turn is directed and represented in parliament by the SoS for Transport, currently one Christopher Stephen Grayling, MP for Epsom and Ewell. Any failing of the railway system is ultimately down to him alone however he may squirm and try to pass the blame onto others.The job of the TOCs is to manage their own franchised operations. Not 'the railway system'.
GTR is not a franchise holder in the conventional sense as it merely manages the services on behalf of the DfT, handing all receipts over then receiving a fixed £8.9BN fee. So not much of an inscentive to do more than the minimum.
The internet is full of communities who believe the Government is about to fall, because the stuff they obsess about is being neglected/under-funded/banned etc. Whereas, the people who decide elections are those who take only a passing interest in topical matters.