An inquiry... That will help me get to and from work over the next few days and weeks.Any inquiry would do well to start by reading this thread and the very many considered, well-explained and illuminating posts on the reality of this monumental screw-up, not to mention all the positive suggestions on how to improve things.
You are absolutely correct. Which is why Greenwich has 12 trains an hour each way on the DLR.Greenwich is by far more important an area than Sidcup or New Eltham and cannot simply have 4tph or this basic service
I see that Stephen Glaister, heading the enquiry, has merely been described by the BBC as "A university Professor of Transport". As they undoubtedly just lifted this from the DfT press release, that too will have made no mention that he is, in addition, the Chair of ORR, a central part (and sometimes shown to be one of the weaker ones) of the government's rail bureaucracy. He is just going to take the various submissions from the bodies like GTR, the DfT, and Grayling himself, who we have been hearing from in recent days, at face value.Any inquiry would do well to start by reading this thread and the very many considered, well-explained and illuminating posts on the reality of this monumental screw-up, not to mention all the positive suggestions on how to improve things.
How long does it take a driver to learn a route? What are the steps? Can multiple drivers be trained at once in the same cab?
Anything from a week or two to months depending on length and complexity. Drivers will typically be issued a briefing on the route and then be expected to travel over it a set number of times and/or observe video footage of various movements on it. Particular care must then be taken to apply the route characteristics to their existing knowledge of how the appropriate rolling stock for the route will handle, not to mention unusual route features and any special regulations. There will need to be an assessment process of some sort as well.
The number of people in a cab depends if the driver in charge of the train is qualified recently or more experienced, but a typical maximum for an experienced driver is 3 extra staff (who must hold appropriate passes), bearing in mind one of those 3 may be a pilot who is route-conducting them over the route anyway.
Because Abbey Wood no longer needs the fasts, since it has both Thameslink and Crossrailand that’s a massive step up.
Talks like a GTR employee as far as I can tell!I can't be bothered to reply to him anymore.I have asked him a couple of questions that he has just ignored.I would suggest everyone just ignores him
Talks like a GTR employee as far as I can tell!
I'm watching the statement and questions. Grayling's performance is lamentable but entirely predictable. Everyone but him and the DfT are responsible for the mess. The only person who can oversee the fix is him so no point in him resigning. He has also tried to say that Network Rail's non performance gives support to his ideas for merging rail operation and maintenance. He has threatened to "punish" GTR (and Govia) at some point in the future. Also measures being looked at to get some peak South Eastern and East Midlands Trains services to call at selected stations to fill in the gaps caused by GTR's non performance. A compensation scheme (not defined) for both GTR and Northern passengers is also proposed.
Labour MPs have clearly decided to take a "he must resign, he is responsible" line of attack. Grayling naturally disagrees.
It is more telling that Tory MPs are clearly having to hold back from calling him "rude names" so as not to appear disloyal. Crispin Blunt, though, get very close to a dangerous blow by saying "He and the DfT have to accept they are part of the industry alongside everyone else". Clearly rail issues in Redhill (much documented here and elsewhere) are a significant issue for Mr Blunt.
The number of people in a cab depends if the driver in charge of the train is qualified recently or more experienced, and sometimes whether or not they have recently had any safety incidents, but a typical maximum for an experienced driver is 3 extra staff (who must hold appropriate passes), bearing in mind one of those 3 may be a pilot who is route-conducting them over the route anyway.
I see that Stephen Glaister, heading the enquiry, has merely been described by the BBC as "A university Professor of Transport". As they undoubtedly just lifted this from the DfT press release, that too will have made no mention that he is, in addition, the Chair of ORR, a central part (and sometimes shown to be one of the weaker ones) of the government's rail bureaucracy. He is just going to take the various submissions from the bodies like GTR, the DfT, and Grayling himself, who we have been hearing from in recent days, at face value.
In fact, as the ORR are responsible for the economic regulation of the railway, I would have liked to have seen their role in all this put under scrutiny as part of the enquiry into how all this was allowed to happen. Which is obviously now not going to take place.
You are Charles Horton and I claim my £10.
Any news on when you’re going to grow some stones and resign?
London Bridge to Coulsdon South, Merstham, Redhill, Earlswood, Salfords and Horley tonight - 16 consecutive trains cancelled from 16:51 to 20:30 (although technically the 17:30 went through 20 late having previously shown as cancelled for some time by which time everyone had given up on it) - almost impossible to get home for commuters - Southern service from East Croydon to Redhill - most trains overwhelmed by passenger load.
personally there is no reason why this train can’t stop at Erith, Belvedere and Woolwich Dockyard,
Don't they also have to learn a series of diversionary routes too?
What GTR changed recently to accommodate route learning is F!"£$"£$!"£$"ing disgraceful.
More crucially though, the DfT also said that Govia had agreed to pay, up front, a flat fee of £10m. This would cover performance payments for any Thameslink disruption up until September 2018.
Confused, the Committee asked the Department to explain how agreeing fines in advance of services that had not yet been delivered was in the best interests of taxpayers or passengers. In reply, the DfT asserted that they felt the performance regime within the contract would actually not benefit passengers because of the amount of management time the DfT might have to spend ‘‘arguing over a huge number of detailed claims”. The DfT stressed to the committee that they believed they had made a reasonable assessment of the costs, based on what they believed would be the ‘worst case scenario of disruption’, so the amount was fair.
Anything from a week or two to months depending on length and complexity. Drivers will typically be issued a briefing on the route and then be expected to travel over it a set number of times and/or observe video footage of various movements on it. Particular care must then be taken to apply the route characteristics to their existing knowledge of how the appropriate rolling stock for the route will handle, not to mention unusual route features and any special regulations. There will need to be an assessment process of some sort as well.
The number of people in a cab depends if the driver in charge of the train is qualified recently or more experienced, and sometimes whether or not they have recently had any safety incidents, but a typical maximum for an experienced driver is 3 extra staff (who must hold appropriate passes), bearing in mind one of those 3 may be a pilot who is route-conducting them over the route anyway.
It will be interesting to read an independent report into such a monumental failure to deliver the GTR timetable change which has been in the planning for so long.
I do wonder whether the modern business disease of project management has infected the rail industry. Today, we are led to believe nothing can be done without a huge project management organisation between senior management and subject matter experts.
Indeed we are constantly reminded that we cannot do without such people, their roadmaps or Gantt charts.
We do know that either Senior management at DfT, Network Rail and GTR were fully aware of the impending failure or they were being advised that everything was being correctly managed and deliverables were indeed being delivered, albeit with some challenges along the way.
It appears grass roots staff, technical staff and various subject matter experts recognised the failings and were not convinced that things were running as smoothly as the internal and external PR propaganda was extolling.
Drivers, driving instructors and driver managers knew they were behind on training and route knowledge accumulation.
Schedulers and timetabling staff recognised the timetable they were being asked to deliver did not match reality on the ground.
With a fragmented railway system, with lots of different companies each dependent on each other, there has been a growth in project management to oversee the interfaces and interaction of competing interests. Unfortunately, these people are in most cases 'generalists' delivering one project after another, sometimes with little understanding of the technicalities or practicalities involved.
Network Rail is full of these people, a burgeoning organisation almost wound up in its own policies and bureaucracy - with few wise railway experts left within the ranks of employees - and those that do remain are most likely stifled by the new business speak of those jostling to further their career in delivering the next 'exciting' project.
Project managers would lead us to believe their role is pivotal in successful delivery of projects. But their generalist nature with generic project management skills working across different industries, means this is often far from the truth.
The reality is the senior management team become blind to the realities, since they are being briefed by project managers rather than senior technical experts from within the industry. The senior management then attempt to convince frontline staff that all is well, often using an internal propaganda machine to sell the message to bewildered staff. And external media are sold the same positive message by an external PR team.
The myth which has been sold by those non-technical project managers aims to show they are successfully delivering projects for which they are responsible. Senior management believe this, since they are now removed from reality and their subject matter experts. And neither the front line staff nor customers believe half of what they are told from the company propaganda machine since it rarely bears any resemblance to everyday reality and their daily experiences.
Unfortunately the independent investigation into the shambles will probably recommend a growth in project management and expensive consultants, since the usual excuse for failure of a project is lack of resources - rather than apportioning blame on those who incorrectly stated in their mind numbing Powerpoint presentations to the Executive Committee that they were delivering a project successfully.
It will be interesting to read an independent report into such a monumental failure to deliver the GTR timetable change which has been in the planning for so long.
I do wonder whether the modern business disease of project management has infected the rail industry. Today, we are led to believe nothing can be done without a huge project management organisation between senior management and subject matter experts.
Indeed we are constantly reminded that we cannot do without such people, their roadmaps or Gantt charts.
We do know that either Senior management at DfT, Network Rail and GTR were fully aware of the impending failure or they were being advised that everything was being correctly managed and deliverables were indeed being delivered, albeit with some
etc....
.
This just gets better and better by the minuteI think that there may well be another timetable shake up in December, I think there is a general consensus that people are rightfully p***ed off, this isn't just a regional thing or even a GTR thing (as much as I dislike them and cannot wait to see them make their final call in Medway) but its ridiculous that most of the country are basically playing Russian Roulette with their trains.