As i said above there are fitters based at brighton, and they carry out running repairs.
FCC has in the last coupls of weeks employed their own cleaners based at brighton, and no longer sub-contract form southern.
At weekends when units are stuck on the southern region, most turns make a trip onto lovers walk for tanking and cet'ing, also some units spend the night at selhurst where they are cleaned and tanked.
Your quote of me isn't what I wrote. How strange. Yes the new diagrams seem more cooperation between FCC and Southern on the south end of the line. I did forget about the Fitters at brighton.
While most of the country suffers from snow and ice problems, FCC is hit by fire with a major lineside fire at Camberwell (and at one point this morning news that Elephant & Castle wasn't to open today). Meanwhile the march of the TLP continues forward after some major works over the holiday period...... ...
Fleet
Units in passenger service 377501/502/504/ 505/506/507/ 508/509/510/ 511/512/513/ 514/515/516/ 517/518/519/ 520/521/522
377501 has returned to service
377503 is on DC testing this week and expected at Cauldwell w/c 11/01 (next week)
377504 is to return to Bombardier for 'internal re-fit under warranty' once 503 is at Cauldwell.
377523 has had a wheel change by Southern at Selhurst and is expected at Cauldwell tomorrow (07/01)
Livery of the 377/5 is suspended due to 'poor weather conditions'.
The 377/5 are currently experiencing failures of the customer CIS system and Bombardier is looking into and retesting the system.
Infrastructure
St Pancras bi-direction signalling system came into use allowing 6tph to be turned in the low level platforms.
West Hampstead - comissioning of the north-to-north and south-to-south turnbacks have been put back till October due to lack of 'appropiate possession access'. Moving one signal to allow platform extension works is now put back to 09/05/10 after Network didn't consult EMT/FOC.
Stations
Blackfriars bridge slide went ok (tho it was a close run thing with the deadline being met, just).
Farringdon saw plain lining of the former junction to Moorgate to allow platform extension works to continue. With construction work 'predicted to be continuous throughtout 2010' FCC and LUL are having a meeting with NR next week to discuss issues including the final completion date for the finishing of the KO0 bridge which was due to be completed by March 2009.
2010 will see all 377/5 in service and livery complete and the TLP move into pure construction mode until next summer when 12 car testing begins in earnst in day times hours.