Surely not holding back to fit tables.

Getting back onto the introduction of the 700's, seems to have gone quiet on deliveries the last fortnight. Surely not holding back to fit tables.
Are we not due for an additional unit or two into the weekday workings.
The brake runner wagons involved have not had a particularly fast return to the Fatherland. At least one of the containers was found to be a little out of guage before the empties were sent back. The set is now in the Down yard at Three Bridges awaiting movement of the offending container (s?) by road.
I have no idea if there is a spare set of wagons available. If there is a spare set my reason is not valid. . .
deliveries will restart next week, with a delivery on 26/10.
Different set of barrier/brake force wagons has been sourced.
Bit more serious than that.
However next Monday will see three more diagrams (1x 8 car ad 2x 12 cars) being introduced.
--- old post above --- --- new post below ---
700027?
There is, however, a world of difference between post-Christmas occasional travellers laden with luggage and regular commuters. It's surprising how many passengers Finsbury Park can absorb (just look at it after any Arsenal home match) and works are currently underway to increase passenger capacity.I can tell you from experience, Finsbury Park struggled to cope with the number of passengers disembarking from East Coast services (either last Christmas or the year before, I can't remember) when engineering works between it and Kings Cross overran..
While I appreciate it can absorb a lot of passengers, I'm still sceptical. The placement of the barriers and the stairs are a real physical restriction.There is, however, a world of difference between post-Christmas occasional travellers laden with luggage and regular commuters. It's surprising how many passengers Finsbury Park can absorb (just look at it after any Arsenal home match) and works are currently underway to increase passenger capacity.
What will these diagrams be replacing? Electrostars I assume
In times of severe disruption, you can bet that the barriers will be open. And there are now four spiral staircases available to link the NR platforms with the tube platforms, instead of the previous two.While I appreciate it can absorb a lot of passengers, I'm still sceptical. The placement of the barriers and the stairs are a real physical restriction.
I never suggested it would be 'sweetness and light'. However, it's not about how 'patient' the passengers may be, but about how easy it is to move them between the NR and tube platforms in times of disruption - and it's far easier to do that with regular commuters then occasional travellers laden with luggage and Christmas presents!I'd say, from experience, commuters are far more impatient than "occasional travelers". I reckon a few 700s arriving and departing close to each other will cause issues, with those wishing to board barging through those alighting.
In times of severe disruption, you can bet that the barriers will be open. And there are now four spiral staircases available to link the NR platforms with the tube platforms, instead of the previous two.
I never suggested it would be 'sweetness and light'. However, it's not about how 'patient' the passengers may be, but about how easy it is to move them between the NR and tube platforms in times of disruption - and it's far easier to do that with regular commuters then occasional travellers laden with luggage and Christmas presents!
Have you seen the barrier arrangements on the NR platforms at Finsbury Park? There are gates which can be opened, meaning passengers can bypass the barriers altogether.Well, even if the barriers are open it'll still be more restrictive than the previous arrangement without barriers.
Because finding the tube platforms at Finsbury Park is so difficult... :roll:And if you think commuters are easy to direct around a station... Well...
Have you seen the barrier arrangements on the NR platforms at Finsbury Park? There are gates which can be opened, meaning passengers can bypass the barriers altogether.
You can see the gates open (as well as the ticket barriers themselves) in this picture.
I find it weird people think Finsbury Park cannot cope with two trains an hour terminating there. Comparing it to everything terminating is really crap attempt to force a untrue point.
Yes. 6x 387 and 2x 377.
Are they the last 6x TL 387s?
Not by a long shot. After this there will still be 14x 387 left. It's the half way point for the 387/1 cascade and the start of the 377 cascade.
Travelling home in last night's rush hour on a train that was full and standing, the passenger information system was informing us that there were plenty of seats available in every carriage! If it can't get that right then it isn't worth having - apart from the amusement value![]()

As the data is generated from load (weight) sensing on each car, maybe you were on a train of very light people.![]()
Apart from remaining software issues with the PIS, it looks like most of the initial problems have either been solved, or maybe weren't actually issues with the delivered stock and just consequences of driver training, poor systems engineering and the ever present 'let's blame the new trains' by uninformed commentators.
And your evidence for such claims?
If you're going to call other people's posts uninformed, then you'd do well to back up your own with proof.
It doesn't really matter either way. Without any statistics, either side is just speculating.I didn't mention 'posts', - there are complaints outside the RailUK world.
I didn't mention 'posts', - there are complaints outside the RailUK world.
Most of the issues mentioned here, PIS aside, seem to have been related to door opening issues.
Drivers being 'at fault' doesn't mean they did anything wrong, as that's the point of training. Knowing where to stop, knowing how to override problems, signs being in the right place etc etc.
That's the point of the slow introduction isn't it? To find real world issues that can't be found anywhere else.
I don't think anyone needs to take offence, and I read things to mean that generally speaking the trains are proving reliable - so aren't just breaking down with unknown faults and having to be dragged back home for repairs and modifications.
So far have any trains been sent back to Germany for work to be done, as seems to have happened a few times with stock built/assembled nearer Derby?
It doesn't really matter either way. Without any statistics, either side is just speculating.
It may well be that there never were many issues or it could be that the "commentators" are no longer talking about them. We can't really say without evidence.
That's the point of the slow introduction isn't it? To find real world issues that can't be found anywhere else.
I don't think anyone needs to take offence, and I read things to mean that generally speaking the trains are proving reliable - so aren't just breaking down with unknown faults and having to be dragged back home for repairs and modifications.
So far have any trains been sent back to Germany for work to be done, as seems to have happened a few times with stock built/assembled nearer Derby?
With over 60 units manufactured, 31 delivered (32nd on the way) and only 10? weekday diagrams currently this suggests lots of issues getting rectified behind the scenes]
I suppose it could suggest that to you - it could suggest to others that there is one issue - it could suggest to others that driver training is taking longer than planned for - it could suggest something else - it could suggest nothing
Brian