But I'm just saying what I would wish for in the ideal world!!The Class 387/1s need to go to Great Northern though, the Class 319s don't.
Oh ok thanks for that!!
Sent from my SM-J500FN using Tapatalk
--- old post above --- --- new post below ---
I would have thought that the 700/0's are starting on the Sutton loop instead - the 30 year old 319s should go first AND THEN the 2 year old 387s
Sent from my SM-J500FN using Tapatalk
I'd also imagine the BDM-TBD/BTN will have to have a mixture to a certain extent to allow for units to Circulate via Three Bridges Depot.
Class 466 is indeed correct. Both depots will deal with 8 cars. There's a limited need for 8 cars to be on the Bedford to Three Bridges all station service which neatly gets the 8 cars into depot. In fact that's part of the plan from Monday!
So the sweeping statement from GTR telling us that every single one of our Thameslink services (Peterborough to Horsham & Bedford to Three bridges routes) will have 12 car trains is in fact another lie?
Albeit for operational reasons
So the sweeping statement from GTR telling us that every single one of our Thameslink services (Peterborough to Horsham & Bedford to Three bridges routes) will have 12 car trains is in fact another lie?
Albeit for operational reasons
Your assuming too much. You've made the assumption that the interim arrangements are permanent. The overnight Bedford to tThree Bridge that I've spoken about don't serve Redhil so both statements are correct it's just an understanding that not right.
Please tell me more about how unnecessary tables and sockets are on peak time Thameslink services?
View attachment 28755
[Image depicts three laptops on a class 387 table]
I took the statement that Three Bridges will be receiving 8-car units for servicing permanently, to mean that the operational diagrams would use the Bedford - Three Bridges (Gatwick 2018) to get the 8-car units to Three Bridges. So GTR (D Scorey and others) stating at Public meetings in 2014 & 2015 that Redhill Line is guaranteed to only get 12 coach trains on the route from 2018 would not be technically true.
In current 2018 plans all of Bedford to Gatwick including some of the overnights will call at Redhill, although eventually they will divert to terminate at Reigate (when platform 3 is built in 2021/2) which might make that more difficult.
I'm not that bothered because there are many trains on the route outside of shoulder peak, peak and very late evening services that 8-car will suffice. It's just the classic over promising again.
The hint is in the name, laptop. That's where it's supposed to be used hehe
Comments such as this are not helping the situation and reinforce a paradigm held by some about rail insiders' attitudes to the public. I urge you to try using a laptop on a 700 with the airline seat legroom provided. Then be sure to get back to us.
What size laptop do you have? I prefer portability so have two 11 inch laptops. They're easy to use on a lap, as originally intended, whether a train or at an event. Not usually on short haul flights though, but I rarely need to work when actually flying.
I've actually found that I'd sooner work from an airline seat using a tip down table or lap, than from a table where the person next to me is then watching what I'm doing! When I'm writing, doing a brain dump for later editing, it can be quite embarrassing to have someone reading the crap you're typing initially!
I've tried these (had one for my phone too) and it made the screen too dull.Get a screen filter - problem solved!
I've tried these (had one for my phone too) and it made the screen too dull.
I'll get me coat
Comments such as this are not helping the situation and reinforce a paradigm held by some about rail insiders' attitudes to the public. I urge you to try using a laptop on a 700 with the airline seat legroom provided. Then be sure to get back to us.
So no jokes allowed from staff but the rest of you can? Sad indictment of this forum.
Trouble is it's not a joking matter for anyone; we, the paying public, will have to endure the situation for many years to come.
Sorry but the Bedford to Three Bridges services are not being diverted away from Gatwick, the main target of the overnight services where airport travellers use them well. These services do not call at Redhill (but are often pathed that way) so it's correct those stations are getting 12 car trains. Also reveleant is Mr Sorcey was incharge of Southern services not Thameslink. I think your confusing the Gatwick to Bedford daytime services with the overnight Bedford all stations on MML (limiting it sensibly to 8 cars) to Three Bridges that links the two airports. The two are very difference and technically they over night services are part of the Brighton service group not the via Redhil one.
Reigate is not getting 700s under any current plan. In fact the recent consultation mentioned fixed formations as being unsuited. Any service serving Reigate will be a Southern going towards London, not Thameslink.
So it's not over promising but simple misunderstanding on your part as to what is being discussed.