• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink/ Class 700 Progress

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MML

Member
Joined
25 Oct 2015
Messages
592
Yes, I guess you are right. Better to have a streamlined front end (Class 700) with inset sliding doors, than open corridor front end (Class 379) with plug doors on the side.
And I'm judging sliding doors based on Class 319 vintage stock, where they always seemed draughty and would always clatter as an express passed at speed on the adjacent line.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
I'm judging sliding doors based on Class 319 vintage stock, where they always seemed draughty and would always clatter as an express passed at speed on the adjacent line.

If they're like the 395s, they'll have a locking function to stop any movement when in motion.
 

talldave

Established Member
Joined
24 Jan 2013
Messages
2,676
If they're like the 395s, they'll have a locking function to stop any movement when in motion.

Which adds an irritating few seconds to dwell time!

The lock kicks in shortly after departure. It must be technically possible for it to release before arrival (ie: a gps & speed match triggers release ).
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,588
Location
Croydon
Which adds an irritating few seconds to dwell time!

The lock kicks in shortly after departure. It must be technically possible for it to release before arrival (ie: a gps & speed match triggers release ).

Might require the train to already "know" which side of the train the doors will open on - would this be an issue ?.

Could perhaps be simpler. Perhaps it would be possible to arrange things so that the anti rattle part is unlocked at below, say, 5mph. Same would follow after departure where the anti-rattle part could come into action at above 10mph.

I am assuming that the door would still otherwise be securely shut ?. Also assuming these speeds are low enough that the train is unlikely to experience the door rattling from a passing train (certainly not on the side where the platform will be beginning to appear).
 
Last edited:

CP165

Member
Joined
21 Aug 2011
Messages
100
Location
Berkshire
Which adds an irritating few seconds to dwell time!

The lock kicks in shortly after departure. It must be technically possible for it to release before arrival (ie: a gps & speed match triggers release ).
The new IEP/AT300 trains use the same locking mechanism as on the 395s whereby the door is pushed against the body to form a seal, but on the IEPs/AT300s as the train slows down (5mph and under I think?) this seal is released so that the doors can open quickly when the train has stopped. It was put in the train specification which I think you can find on the DfT website.

However I don't think this would apply to the 700s as I think this locking mechanism is unique to Hitachi and would probably be difficult to apply to double doors.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
It's a small rubber wheel with a pivoting arm which applies pressure to the bottom of the door. Roger Ford wrote a whole article about it when the 395s were launched.
Fair enough. Always assumed it would work in a fashion similar to some of their Japanese trains. Still, I was under the impression it released before stopping.
 

talldave

Established Member
Joined
24 Jan 2013
Messages
2,676
Fair enough. Always assumed it would work in a fashion similar to some of their Japanese trains. Still, I was under the impression it released before stopping.

It's not. If you're waiting to get on, you can see the pressure on the door released after the train has stopped. I assume it's the first thing that happens on door release? Whatever the thinking behind it, it makes for a slow speed boarding of a high speed train!
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
The new IEP/AT300 trains use the same locking mechanism as on the 395s whereby the door is pushed against the body to form a seal, but on the IEPs/AT300s as the train slows down (5mph and under I think?) this seal is released so that the doors can open quickly when the train has stopped. It was put in the train specification which I think you can find on the DfT website.

However I don't think this would apply to the 700s as I think this locking mechanism is unique to Hitachi and would probably be difficult to apply to double doors.

For quite some time, Bombardier has been able to apply various functions to door control systems when the speed decreases to a certain level - usually around the 4-6mph mark. It's not like the idea of doors being prepared for release whilst the train is still moving is a new one. The locking mechanism may be different, but the concept of preparing for a speedier release is not something which is unique to one manufacturer.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
For quite some time, Bombardier has been able to apply various functions to door control systems when the speed decreases to a certain level - usually around the 4-6mph mark. It's not like the idea of doors being prepared for release whilst the train is still moving is a new one. The locking mechanism may be different, but the concept of preparing for a speedier release is not something which is unique to one manufacturer.

I was going to say earlier that some part of the door locking system is released with a clunk on Desiros as they reduce to about walking pace, (and vice versa). So if Bombardier and Siemens are both doing it already I can't see it not also applying to 700s.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I was going to say earlier that some part of the door locking system is released with a clunk on Desiros as they reduce to about walking pace, (and vice versa). So if Bombardier and Siemens are both doing it already I can't see it not also applying to 700s.

I thought that was the door control relay activating (a similar noise can be heard on the 455s) - nothing is mechanically unlocking, it is just the electrics.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
I thought that was the door control relay activating (a similar noise can be heard on the 455s) - nothing is mechanically unlocking, it is just the electrics.

Ah right. It's just that it sounds very mechanical, and happens as the train slows right down; and whether the doors are going to be opened or not, e.g. at signal stops.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
They sure sound a lot like 450s when departing a station

But only on DC. They seem to sound completely different on AC!

Ah right. It's just that it sounds very mechanical, and happens as the train slows right down; and whether the doors are going to be opened or not, e.g. at signal stops.

AFAIK, it is speed activated, so that explains why it is heard every time the train decelerates.

But I may be wrong.
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,031
Location
Newhaven
Surprised there haven't been many updates on service entry :-P
Looking forward to riding one
Hopefully some notice as I'll need to book a day off work ;)
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Surprised there haven't been many updates on service entry :-P
Looking forward to riding one
Hopefully some notice as I'll need to book a day off work ;)

Busy time right now with the whole cascade plan under way with 387, 442, 377, 377, 319, 321, 317, 313 and 700 fleets all involved just within GTR with all four business affected. Concentration is being given on getting it right. And that means expect no notice.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Busy time right now with the whole cascade plan under way with 387, 442, 377, 377, 319, 321, 317, 313 and 700 fleets all involved just within GTR with all four business affected. Concentration is being given on getting it right. And that means expect no notice.

Where are the 387/1's going to be stored prior to moving over to GWR or are they going to be repainted first, before they move over to GWR or stored?
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,577
Location
PTSO or platform depending on the weather
Busy time right now with the whole cascade plan under way with 387, 442, 377, 377, 319, 321, 317, 313 and 700 fleets all involved just within GTR with all four business affected. Concentration is being given on getting it right. And that means expect no notice.

Probably best to take time to get it right before a premature entry to service that could go tits up with consequent embarrassment for GTR. Lets hope this is something they can get right ;)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Where are the 387/1's going to be stored prior to moving over to GWR or are they going to be repainted first, before they move over to GWR or stored?

The first few won't be stored, they are supposed to be in use next week on GW, but this has now been delayed until they are available.

But shouldn't this question be in the 387 thread, where the probable timescales have been mentioned?
 

FOH

Member
Joined
17 Oct 2013
Messages
766
Probably best to take time to get it right before a premature entry to service that could go tits up with consequent embarrassment for GTR. Lets hope this is something they can get right ;)

Embarrassment is something that GTR do quite well. I'm sure they won't let us all down.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Where are the 387/1's going to be stored prior to moving over to GWR or are they going to be repainted first, before they move over to GWR or stored?

Your assuming plans stay the same.

Probably best to take time to get it right before a premature entry to service that could go tits up with consequent embarrassment for GTR. Lets hope this is something they can get right ;)

Well its not just GTR but Siemens also.

The first few won't be stored, they are supposed to be in use next week on GW, but this has now been delayed until they are available.

But shouldn't this question be in the 387 thread, where the probable timescales have been mentioned?

First 387s on GWR will now be the new build units in a few months. /offtopic

Embarrassment is something that GTR do quite well. I'm sure they won't let us all down.

Well Siemens also have stake in this too.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Don't assume as you'd be wrong. As for that move, it could be training run.

You can trace passenger services on Monday the 16th though.

Up Depot 5W93 > Three Bridges 2W94 > Bedford 1W13 > Brighton 1W22 > Bedford, etc etc.

Before you reply with the last word, that isn't me suggesting they'll actually run.
 

Blamethrower

Member
Joined
13 Oct 2014
Messages
384
Location
Bedfordshire
Working in testing that I do, I'm interested to know why new trains always have such a long and intensive testing programme.

I may be wrong (it has happened before) but introduction of 387's and 377/5's seemed to be a lot smoother and quicker than the 700's or indeed the 800's.

I understand why the 800's have a long test programme as it's largely new bi-mode technology, but why do the 700's have such an intensive test programme when the Desiro is already a proven design on UK rails?

What assumptions are made and accepted when introducing new trains to a class that already exists?
 

richa2002

Established Member
Joined
8 Jun 2005
Messages
2,298
You can trace passenger services on Monday the 16th though.

Up Depot 5W93 > Three Bridges 2W94 > Bedford 1W13 > Brighton 1W22 > Bedford, etc etc.

Before you reply with the last word, that isn't me suggesting they'll actually run.
I imagine the paths have put in, in anticipation of the 700s being introduced. Otherwise, when the time comes, an STP would have to keep being applied for until the next timetable change. As has been said though, this doesn't mean 700 operation wll actually start on the 16th.
 
Status
Not open for further replies.

Top