Working in testing that I do, I'm interested to know why new trains always have such a long and intensive testing programme.
I may be wrong (it has happened before) but introduction of 387's and 377/5's seemed to be a lot smoother and quicker than the 700's or indeed the 800's.
I understand why the 800's have a long test programme as it's largely new bi-mode technology, but why do the 700's have such an intensive test programme when the Desiro is already a proven design on UK rails?
What assumptions are made and accepted when introducing new trains to a class that already exists?
These aren't Desiros. They are Desiro City - a very different train. The testing programme for the Class 345s from Bombardier (Aventra, essentially the next generation Electrostar) will be similarly extensive.