Working in testing that I do, I'm interested to know why new trains always have such a long and intensive testing programme.

I may be wrong (it has happened before) but introduction of 387's and 377/5's seemed to be a lot smoother and quicker than the 700's or indeed the 800's.

I understand why the 800's have a long test programme as it's largely new bi-mode technology, but why do the 700's have such an intensive test programme when the Desiro is already a proven design on UK rails?

What assumptions are made and accepted when introducing new trains to a class that already exists?

These aren't Desiros. They are Desiro City - a very different train. The testing programme for the Class 345s from Bombardier (Aventra, essentially the next generation Electrostar) will be similarly extensive.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,129
Location
Atherton, UK
I imagine the paths have put in, in anticipation of the 700s being introduced. Otherwise, when the time comes, an STP would have to keep being applied for until the next timetable change. As has been said though, this doesn't mean 700 operation wll actually start on the 16th.

Having seen the stock books for May, these are the intended paths - but as with everything, they could change!
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Working in testing that I do, I'm interested to know why new trains always have such a long and intensive testing programme.
I may be wrong (it has happened before) but introduction of 387's and 377/5's seemed to be a lot smoother and quicker than the 700's or indeed the 800's.
I understand why the 800's have a long test programme as it's largely new bi-mode technology, but why do the 700's have such an intensive test programme when the Desiro is already a proven design on UK rails?
What assumptions are made and accepted when introducing new trains to a class that already exists?

Class 700 is essentially a new design, with some very specific contractual requirements for the Thameslink routes it is going to operate. Siemens also has to get full certification at EU level.
Class 800 similarly, for Hitachi.
Class 377/387 are variants of the existing Bombardier Electrostar design so they can utilise all the previous testing done for the whole range.
When the next tranches of the Desiro City design arrive (eg SWT, GN Moorgate) they won't have anything like the scale of testing applied to the 700.

I'm not familiar with the class 700 contract, but I expect most of the costs of delayed service introduction will fall on Siemens.
That's assuming all the other parties are doing their bit.
Nobody has yet said that class 800 testing is late/in trouble.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Class 700 is essentially a new design, with some very specific contractual requirements for the Thameslink routes it is going to operate. Siemens also has to get full certification at EU level.
Class 800 similarly, for Hitachi.
Class 377/387 are variants of the existing Bombardier Electrostar design so they can utilise all the previous testing done for the whole range.
When the next tranches of the Desiro City design arrive (eg SWT, GN Moorgate) they won't have anything like the scale of testing applied to the 700.

I'm not familiar with the class 700 contract, but I expect most of the costs of delayed service introduction will fall on Siemens.
That's assuming all the other parties are doing their bit.
Nobody has yet said that class 800 testing is late/in trouble.

I would not speak too soon about the class 800, given the last comment within the thread: http://www.railforums.co.uk/showthread.php?t=100841&page=164
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,031
Location
Newhaven
Bear in mind May is the last day of spring, and Thameslink have said they will start being introduced end of spring ;)
 

TimG

Member
Joined
26 Jul 2014
Messages
131
Spring finishes on June 20 (Summer Solstice).
So they've got the best part of 7 weeks yet.

Crickey. When does summer begin?

Dec Jan Feb = winter
March April may = Spring
June July August = summer
September October November = Autumn
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Crickey. When does summer begin?

Dec Jan Feb = winter
March April may = Spring
June July August = summer
September October November = Autumn

That's what meteorologists and maybe gardeners think (and for which the monthly/quarterly weather statistics are calculated).
Astronomers use the position of the Earth in its orbit, and spring is between the vernal equinox and summer solstice (northern hemisphere).
These dates vary a bit from year to year because of the insertion of Feb 29 in leap years (the Earth year is unhelpfully 365.2422 days, not 365 days).
The summer solstice this year is on June 20 at 2234 UTC/GMT.

Project managers also often use calendar months/quarters for milestones, so I wouldn't be surprised if June 30 wasn't in a contract somewhere (ie end Q2).
Either way, if there are no trains in service by July 1, I think we can complain! ;)
 
Last edited:

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
Press Launch is now 24th May - cue new strike date to be announced by RMT for more egg on GTR face!
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Overwhelmed with units yet none in service. At this rate how many will they have before in passenger service? :D
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
Apologies if I have missed this point, but has anything been mooted yet about the operation of the 12 car 700/1s as DOO (assuming they are intended as such)? If the unions' position is that no more 12 car DOO is to be allowed, even where 12 car DOO trains already run, then is there a problem looming with the 700/1s?
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,081
Apologies if I have missed this point, but has anything been mooted yet about the operation of the 12 car 700/1s as DOO (assuming they are intended as such)? If the unions' position is that no more 12 car DOO is to be allowed, even where 12 car DOO trains already run, then is there a problem looming with the 700/1s?

Not for Thameslink drivers, but if/when Southern drivers drive 12 cars there will be an issue.

Both have different contracts/agreements.

I assume the Littlehampton/East Grinstead/Horsham 12 car 700s will be DOO. These are non-DOO "routes" so im not sure if Thameslink drivers will have to get an agreement regarding this.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
Not for Thameslink drivers, but if/when Southern drivers drive 12 cars there will be an issue.

Both have different contracts/agreements.

I assume the Littlehampton/East Grinstead/Horsham 12 car 700s will be DOO. These are non-DOO "routes" so im not sure if Thameslink drivers will have to get an agreement regarding this.

I can see an almost amusing juxtaposition of staff sickness and the 'FLU' signs that have appeared at platform ends!
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Apologies if I have missed this point, but has anything been mooted yet about the operation of the 12 car 700/1s as DOO (assuming they are intended as such)? If the unions' position is that no more 12 car DOO is to be allowed, even where 12 car DOO trains already run, then is there a problem looming with the 700/1s?

Already announced that where the 700s run they will be DOO.

Overwhelmed with units yet none in service. At this rate how many will they have before in passenger service? :D

You'll soon know.
 

JaJaWa

Established Member
Joined
14 Feb 2013
Messages
1,730
Location
Presumably the service entry date will be when they've managed to pull the old logos off and find something to affix their new ones.
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,031
Location
Newhaven
Status
Not open for further replies.

Top