Did you mean to write "don't" there? Autocorrect strikes?
Thanks, I must pay more attention when using a tablet!! Fixed it now.
Did you mean to write "don't" there? Autocorrect strikes?
I'm judging sliding doors based on Class 319 vintage stock, where they always seemed draughty and would always clatter as an express passed at speed on the adjacent line.
If they're like the 395s, they'll have a locking function to stop any movement when in motion.
Which adds an irritating few seconds to dwell time!
The lock kicks in shortly after departure. It must be technically possible for it to release before arrival (ie: a gps & speed match triggers release ).
The new IEP/AT300 trains use the same locking mechanism as on the 395s whereby the door is pushed against the body to form a seal, but on the IEPs/AT300s as the train slows down (5mph and under I think?) this seal is released so that the doors can open quickly when the train has stopped. It was put in the train specification which I think you can find on the DfT website.Which adds an irritating few seconds to dwell time!
The lock kicks in shortly after departure. It must be technically possible for it to release before arrival (ie: a gps & speed match triggers release ).
I'm pretty sure that's how the 395s work... You can hear the diaphragm deflating just before coming to a station.
Fair enough. Always assumed it would work in a fashion similar to some of their Japanese trains. Still, I was under the impression it released before stopping.It's a small rubber wheel with a pivoting arm which applies pressure to the bottom of the door. Roger Ford wrote a whole article about it when the 395s were launched.
Fair enough. Always assumed it would work in a fashion similar to some of their Japanese trains. Still, I was under the impression it released before stopping.
The new IEP/AT300 trains use the same locking mechanism as on the 395s whereby the door is pushed against the body to form a seal, but on the IEPs/AT300s as the train slows down (5mph and under I think?) this seal is released so that the doors can open quickly when the train has stopped. It was put in the train specification which I think you can find on the DfT website.
However I don't think this would apply to the 700s as I think this locking mechanism is unique to Hitachi and would probably be difficult to apply to double doors.
For quite some time, Bombardier has been able to apply various functions to door control systems when the speed decreases to a certain level - usually around the 4-6mph mark. It's not like the idea of doors being prepared for release whilst the train is still moving is a new one. The locking mechanism may be different, but the concept of preparing for a speedier release is not something which is unique to one manufacturer.
I was going to say earlier that some part of the door locking system is released with a clunk on Desiros as they reduce to about walking pace, (and vice versa). So if Bombardier and Siemens are both doing it already I can't see it not also applying to 700s.
I thought that was the door control relay activating (a similar noise can be heard on the 455s) - nothing is mechanically unlocking, it is just the electrics.
They sure sound a lot like 450s when departing a station
Ah right. It's just that it sounds very mechanical, and happens as the train slows right down; and whether the doors are going to be opened or not, e.g. at signal stops.
AFAIK, it is speed activated, so that explains why it is heard every time the train decelerates.
But I may be wrong.
IIRC its below 3mph.
Surprised there haven't been many updates on service entry :-P
Looking forward to riding one
Hopefully some notice as I'll need to book a day off work![]()
Busy time right now with the whole cascade plan under way with 387, 442, 377, 377, 319, 321, 317, 313 and 700 fleets all involved just within GTR with all four business affected. Concentration is being given on getting it right. And that means expect no notice.
Busy time right now with the whole cascade plan under way with 387, 442, 377, 377, 319, 321, 317, 313 and 700 fleets all involved just within GTR with all four business affected. Concentration is being given on getting it right. And that means expect no notice.
Where are the 387/1's going to be stored prior to moving over to GWR or are they going to be repainted first, before they move over to GWR or stored?
Probably best to take time to get it right before a premature entry to service that could go tits up with consequent embarrassment for GTR. Lets hope this is something they can get right![]()
Where are the 387/1's going to be stored prior to moving over to GWR or are they going to be repainted first, before they move over to GWR or stored?
Probably best to take time to get it right before a premature entry to service that could go tits up with consequent embarrassment for GTR. Lets hope this is something they can get right![]()
The first few won't be stored, they are supposed to be in use next week on GW, but this has now been delayed until they are available.
But shouldn't this question be in the 387 thread, where the probable timescales have been mentioned?
Embarrassment is something that GTR do quite well. I'm sure they won't let us all down.
Presumably they are expected to come into service on May 15th when the new timetable comes in to effect?
Paths are already on RTT with ECS moves to and from the 700 depot
http://www.realtimetrains.co.uk/train/G76038/2016/05/15/advanced such as this
Don't assume as you'd be wrong. As for that move, it could be training run.
I imagine the paths have put in, in anticipation of the 700s being introduced. Otherwise, when the time comes, an STP would have to keep being applied for until the next timetable change. As has been said though, this doesn't mean 700 operation wll actually start on the 16th.You can trace passenger services on Monday the 16th though.
Up Depot 5W93 > Three Bridges 2W94 > Bedford 1W13 > Brighton 1W22 > Bedford, etc etc.
Before you reply with the last word, that isn't me suggesting they'll actually run.