• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

SouthEastern fleet replacement updates

Status
Not open for further replies.

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
And weren't there ceiling handrail/grabrail issues with the 707s which made them non compliant with the latest guidance?

It made them non-compliant with DfTs requirements for achieving crush loads of 0.25sqm/pax (instead adjudged to be 0.35 sqm/pax) - something that was required to meet projected future demands on the clapham junction corridor. Post Covid (and on what was historically a less busy network than SW) I think that it won't pose a massive issue
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Stephen42

Member
Joined
6 Aug 2020
Messages
804
Location
London
It made them non-compliant with DfTs requirements for achieving crush loads of 0.25sqm/pax (instead adjudged to be 0.35 sqm/pax) - something that was required to meet projected future demands on the clapham junction corridor. Post Covid (and on what was historically a less busy network than SW) I think that it won't pose a massive issue
The trains are meant to last until 2062 when demand will have gone up again. It's probably not a deal breaker, but would lower the business case value from requiring more trains/vehicles to cope with demand later in their life.
 

theageofthetra

Established Member
Joined
27 May 2012
Messages
3,565
Location
Beckenham
The trains are meant to last until 2062 when demand will have gone up again. It's probably not a deal breaker, but would lower the business case value from requiring more trains/vehicles to cope with demand later in their life.
Am important point regarding any new stock and cost saving will be that they have in cab monitors.

The cost of maintenance, cleaning and replacement of the hundreds of monitors would be removed if a complete metro stock replacement was to happen.

The DFT would surely also be attracted to reduced staffing costs as no dispatch staff would be required at say Dartford or other stations entirely served by metro stock and greatly reduced elsewhere.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
I can't see much reason why they cannot fix the grabrail/handrail issue, as I would imagine Siemens would be willing to redesign/fix that for such a large order, and the toilet issue has already been solved in the form of the 700 - Is there any reason same can't be done for the 707? Nothing to stop them putting in more comfortable seats with tables either, though I doubt it will happen with the DfT involved.
I'm sure I recall seeing reference that the 707s could be retrofitted with toilets and I imagine that's what might happen.
As @Domh245 notes, the handrail "issue" has only arisen because of some specific DfT requirements relating to crush-load capacity in the South Western franchise requirements. Effectively Siemens gambled on the Thameslink spec being pretty close to the "ideal standard" for high-capacity metro trains in Britain for many years to come and were caught out when the DfT moved the goalposts around a bit and started to require ceiling-fixed grabrails in the exact places that Siemens had chosen to put wiring harnesses and other bits of electrical kit. It's not a defect or anything like that, just a small limitation on flexibility when it comes to the saloon layout.

The toilet thing isn't an "issue" at all - the Desiro City design is perfectly capable of accepting toilets, as the 700s show. It's very simply the case that SWT decided that they didn't need them in the 707s, and SE have now decided that they can't be bothered paying to retrofit them. There is absolutely nothing stopping Siemens from tendering a Desiro City design that's absolutely bristling with them should that be what SE want.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,234
The trains are meant to last until 2062 when demand will have gone up again. It's probably not a deal breaker, but would lower the business case value from requiring more trains/vehicles to cope with demand later in their life.
And SE London/NW Kent has some of the highest population growth in the country.
 

SolomonSouth

Member
Joined
25 Feb 2021
Messages
398
Location
Gravesend
Like many are saying, I think all the 465/466 will be going in 2027 when the new trains come in, though we do land around 30 carriages short. Maybe they'll keep a few /9s (since they actually had interior refurbishment unlike the BRELS) but I think that extremely unlikely.
A partial replacement of the Networkers would be interesting. I wonder what they’d keep, how many, and for how long. I’m guessing the BREL 465s, but of course that would limit workings to 4, 8 and 12 cars unless they kept enough 466s. But then those are less reliable, require different spares and knowledge and are owned by a different company.
As of 2020, modern railways said that 465/9s and 466s are more reliable than 465 BRELS (see the screenshot). Though in 2022 it may be different.

The 707s will also potentially be going if they can find good value for the new fleet, as they said. The reason I think 376s are safe is that they are getting an upgrade whereas 707s and networkers are not - that makes them both a liability. Granted, I realize there isn't much case to replace the 707s right now, save for the lack of toilets, but South Western did without much case. We'll just need to see if Southeastern do the same. Hopefully not. But time will tell.
 

Attachments

  • Screenshot (31).png
    Screenshot (31).png
    1.4 MB · Views: 87

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,395
Location
Taunton or Kent
Like many are saying, I think all the 465/466 will be going in 2027 when the new trains come in, though we do land around 30 carriages short. Maybe they'll keep a few /9s (since they actually had interior refurbishment unlike the BRELS) but I think that extremely unlikely.
I think Southeastern will be hoping to get away with a smaller fleet overall, like Southern are after binning all their 455s and only bringing back 2x 377s from SE to compensate.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,125
Location
Liverpool
Huh? You can't compel the rolling stock companies to make a loss on their investments. Do we make the owners of office blocks lease their buildings out to the public sector on artificial terms?
They can try. Like they tried getting money from the energy companies, who then raised their prices in response....

I don't know what the ROSCOs would do themselves, but I can tell you, it won't be pretty.
 

4BEP

Member
Joined
21 Jan 2022
Messages
74
Location
Loose
Unless something has changed in the last few years, it’s definitely 1-3 only for 12 car networkers at Ch+. The country end of p6 isn’t wide enough to be deemed safe (it’s just board extensions from memory).
Ten years ago, when I was still working, there was a Tun Wells stopper from CHX p6 formed from 3x 465/9 immediately before my 17:39 12 car Kent Coast semi from the same platform. P6 was the only platform where you could enter or alight from all doors on 375s or 465s.

== Doublepost prevention - post automatically merged: ==

Talgo have an EMU platform for the UK :D CAF and Hitachi are yet to produce a 20m 3rd rail train (at least in the UK) either.

Given the 701s current status I'd be surprised if Alstom got the contract for effectively more of them, both Hitachi and Alstom are busy anyway with HS2 rolling stock while Goole isn't too busy at the moment now that TfL is less well financially.
Hitachi 395s spend most of their time running 3rd tail.
 
Last edited:

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Like many are saying, I think all the 465/466 will be going in 2027 when the new trains come in, though we do land around 30 carriages short. Maybe they'll keep a few /9s (since they actually had interior refurbishment unlike the BRELS) but I think that extremely unlikely.

As of 2020, modern railways said that 465/9s and 466s are more reliable than 465 BRELS (see the screenshot). Though in 2022 it may be different.

The 707s will also potentially be going if they can find good value for the new fleet, as they said. The reason I think 376s are safe is that they are getting an upgrade whereas 707s and networkers are not - that makes them both a liability. Granted, I realize there isn't much case to replace the 707s right now, save for the lack of toilets, but South Western did without much case. We'll just need to see if Southeastern do the same. Hopefully not. But time will tell.
Why would 707s be replaced? They’ve just entered service and Southeasteen are still hoping to get more. In addition they’ve just been refurbished.

The replacement well may be more 707s as they could be easier to incorporate in but alas nothing is confirmed and it’s all speculation. Both tenders close in 2 and a half weeks. I highly suspect the existing rolling stock tender will be unsuccessful purely based on the fact there are loads of vehicles that specifically match Southeastern request that Train operating companies are willing to give up.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
Why would 707s be replaced? They’ve just entered service and Southeasteen are still hoping to get more. In addition they’ve just been refurbished.
Unfortunately, as with everything else, releasing 707s at the end of a lease would save money.

Have they been refurbished or just had seat coverings changed?
 

Busman

Member
Joined
4 Mar 2017
Messages
136
Says who? You, who perhaps doesn’t mind them? You don’t have to hate them but I’ve had far too much a horrible journey with my trainers stuck to the p^ss soaked floor to not hate them, so let me hate :p

You must be desperately unlucky then, I use them every weekday and a fair amount at weekends and experienced that about twice in 20 odd years and that's to be expected if there is a fault. I've seen more 'toilet issues' on a 321s, 458s and 317s.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,743
Location
Worcester
You must be desperately unlucky then, I use them every weekday and a fair amount at weekends and experienced that about twice in 20 odd years and that's to be expected if there is a fault. I've seen more 'toilet issues' on a 321s, 458s and 317s.
I've been on all 147 and had that experience or something similarly unpleasant on almost all, I'd say at least two thirds, but fair enough :D
(An honour to be tagged in your first ever post here btw ;))
 
Last edited:

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Unfortunately, as with everything else, releasing 707s at the end of a lease would save money.

Have they been refurbished or just had seat coverings changed?
Actually I think I’ve got my knowledge a bit out of order. You are completely correct, it’s just the seat coverings.
 

4BEP

Member
Joined
21 Jan 2022
Messages
74
Location
Loose
As @Domh245 notes, the handrail "issue" has only arisen because of some specific DfT requirements relating to crush-load capacity in the South Western franchise requirements. Effectively Siemens gambled on the Thameslink spec being pretty close to the "ideal standard" for high-capacity metro trains in Britain for many years to come and were caught out when the DfT moved the goalposts around a bit and started to require ceiling-fixed grabrails in the exact places that Siemens had chosen to put wiring harnesses and other bits of electrical kit. It's not a defect or anything like that, just a small limitation on flexibility when it comes to the saloon layout.

The toilet thing isn't an "issue" at all - the Desiro City design is perfectly capable of accepting toilets, as the 700s show. It's very simply the case that SWT decided that they didn't need them in the 707s, and SE have now decided that they can't be bothered paying to retrofit them. There is absolutely nothing stopping Siemens from tendering a Desiro City design that's absolutely bristling with them should that be what SE want.
I used to work for a lsrge German company which among other things built trsins, key to all manufacturing activity be it trains or dishwashers was manufacturing agility, exemplified by the Velaro high speed train which at one time was being built to suit 3 different customers differing requirements. So a few minor adptons to sn existng product to suit SE or more correctly the OLR should not prove difficult.
 

4BEP

Member
Joined
21 Jan 2022
Messages
74
Location
Loose
We seem to be going off track with this thread, the Invitation for Expressions of Interest is clear that the intention is to procure the supply and maintenance of new rolling stock.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,363
Location
belfast
We seem to be going off track with this thread, the Invitation for Expressions of Interest is clear that the intention is to procure the supply and maintenance of new rolling stock.
There is two Invitations. One for new stock and one for second-hand stock. I'm guessing they're trying to keep their options open
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,939
Location
here to eternity
We seem to be going off track with this thread, the Invitation for Expressions of Interest is clear that the intention is to procure the supply and maintenance of new rolling stock.

I have split off some speculative posts about using existing stock for the South Eastern Fleet to this thread:


Discussion here should be confined to the actual tender for new stock.

thanks
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
Ten years ago, when I was still working, there was a Tun Wells stopper from CHX p6 formed from 3x 465/9 immediately before my 17:39 12 car Kent Coast semi from the same platform. P6 was the only platform where you could enter or alight from all doors on 375s or 465s.

I suspect the standards have changed, hence why it’s no longer allowed now.

The Networkers also have a primitive form of SDO where the entire train apart from the first or last coach can be unlocked, again no longer allowed to be used.
 

FR510

Member
Joined
20 Oct 2020
Messages
111
Location
Kent
Ten years ago, when I was still working, there was a Tun Wells stopper from CHX p6 formed from 3x 465/9 immediately before my 17:39 12 car Kent Coast semi from the same platform. P6 was the only platform where you could enter or alight from all doors on 375s or 465s.

== Doublepost prevention - post automatically merged: ==


Hitachi 395s spend most of their time running 3rd tail.
Not so sure about that. Platforms 4,5 & 6 have only been able to take 10 car Networker formations due to the lack of SDO. More recently Platforms 1,2 & 3 have been altered to allow 12 car Networker formations. 12 & 11 car 375s are permitted in Platforms 4,5 & 6 due to being equipped with SDO.
 

rdlover777

Member
Joined
4 Feb 2014
Messages
461
Location
Kent
In regards to who should build the new stock, i was thinking, why not some variant of the 745 in fixed formations of 4 and 6 cars. So formations could be made up of;
4 Cars
6 Cars
8 Cars 4 + 4
10 Cars 6 + 4
12 Cars 6 + 6

Now, while im no expert in the logistics of how realistic this actually is, with the formations lists i've made, that would surely be able to cover nearly every Metro and Mainline diagrams that SE currently operate as
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
In regards to who should build the new stock, i was thinking, why not some variant of the 745 in fixed formations of 4 and 6 cars.
A 745 isn't exactly Metro stock. The raised floor at the end of each carriage would cause quite a lot of issues even if level boarding is a desirable feature.
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,130
Location
Atherton, UK
The reason mainline is mentioned in this is because of the work 465/9s do to Tunbridge Wells, Ashford & Gillingham/Faversham/Dover. They wouldn't replace 375s.
 

rdlover777

Member
Joined
4 Feb 2014
Messages
461
Location
Kent
A 745 isn't exactly Metro stock. The raised floor at the end of each carriage would cause quite a lot of issues even if level boarding is a desirable feature.
oh, i know that the level floor is an issue for metro stock, i only picked the 745 for my example since its fully electric and coach lengths are within the range of the 20m set out in the tender
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,363
Location
belfast
oh, i know that the level floor is an issue for metro stock, i only picked the 745 for my example since its fully electric and coach lengths are within the range of the 20m set out in the tender
Why would the slightly higher floor near the ends, away from the doors, be an issue for Metro stock? It's effectively a standard feature in metro-style stock in multiple european countries and doesn't seem to cause any issues there.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
Why would the slightly higher floor near the ends, away from the doors, be an issue for Metro stock? It's effectively a standard feature in metro-style stock in multiple european countries and doesn't seem to cause any issues there.
You need to have standing passengers along the whole coach. I'd say that a class 700 style flat floor and wide gangways is a pretty important feature in maximising capacity and moving passengers away from the door vestibules.
 

4BEP

Member
Joined
21 Jan 2022
Messages
74
Location
Loose
The reason mainline is mentioned in this is because of the work 465/9s do to Tunbridge Wells, Ashford & Gillingham/Faversham/Dover. They wouldn't replace 375s.
Other than on Tun Wells and Gillingham services 465/9s are rare on Ashford and mainline services, likely become more rare when the heavily teduces setvices ststrt on 12 Dec.

== Doublepost prevention - post automatically merged: ==

No Requirement for Mainline replacement. 375s work fine and will continue to for the next 15 years.

== Doublepost prevention - post automatically merged: ==


No.

No one according to BidStats has answered the tender. Speculation does include more 707s but they have to be suited to both metro and mainline and work on High Speed 1 for some reason. Although nothing has been confirmed officially yet.

== Doublepost prevention - post automatically merged: ==


I'd also recommend reading the last 6 pages to avoid any questions which have already been answered :)
HS1 is excluded from the requirement.
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,130
Location
Atherton, UK
Other than on Tun Wells and Gillingham services 465/9s are rare on Ashford and mainline services, likely become more rare when the heavily teduces setvices ststrt on 12 Dec.
465s still work to Ashford via Maidstone East (weekdays) and to Dover via Faversham (Sundays) from December. As well as some of the 1G's on weekdays from Faversham to Cannon St.
 

4BEP

Member
Joined
21 Jan 2022
Messages
74
Location
Loose
465s still work to Ashford via Maidstone East (weekdays) and to Dover via Faversham (Sundays) from December. As well as some of the 1G's on weekdays from Faversham to Cannon St.
Just one diagram each weekday to Ashford and not even that is rostered this week. The Mid Kent and Chatham line services are being severely reduced from next month so the number of 465/9s required will be further reduced. That said my reading of the expressions of interest is that either metro or mainline stock could be replaced, goodness knows why but remember SE is now run by the DfT so anything is possible.

== Doublepost prevention - post automatically merged: ==

Just one diagram each weekday to Ashford and not even that is rostered this week. The Mid Kent and Chatham line services are being severely reduced from next month so the number of 465/9s required will be further reduced. That said my reading of the expressions of interest is that either metro or mainline stock could be replaced, goodness knows why but remember SE is now run by the DfT so anything is possible.
Sorry, just noticed the the 465/9 diagram is back in today, yesterday it was on a Maidstone / Blackfriars diagram. There is also a 7 car 375 pair on the Vic - Maidstone - Ramsgate today, like the Blackfriars service the Ramsgate service is being dropped next month leaving 1tph between AFK - MDE snd VIC and an hourly service from MDE to CHX.
 
Last edited:
Status
Not open for further replies.

Top