Bletchleyite
Veteran Member
They've asked for a proven platform
That makes a lot of sense. Can we think of a platform that's not proven for 20m third rail vehicles at the moment?

It won't be that one, I suspect.
They've asked for a proven platform

Talgo have an EMU platform for the UKThat makes a lot of sense. Can we think of a platform that's not proven for 20m third rail vehicles at the moment?
It won't be that one, I suspect.
Given the 701s current status I'd be surprised if Alstom got the contract for effectively more of them
If Southeastern succeeds in their aim of finding new trains that are cheaper than the current networkers, I could see DfT approving it. Otherwise, not so much
With rising interest rates it seems very unlikely low leasing costs can be obtained for new stock?
For 30year old trains would the owners let them be leased for a song? No one else will have them.
As a very frequent user, the Networkers ARE worse than the 376s, 700s and just about anything else I use on the entire rail network in terms of ingrained dirt and general unkempt appearance. Everything about them embodies a lack of care for so many years.
The 376 have ripped seating but the general ambience/appearance is tired but not terrible like the Networkers.
It's not just last night's pee on the 465s, it's years of an operator never bothering to really clean them deeply. That in turn just encourages bad behaviour. As does a lack of on train staff and at stations. The whole network has long needed investment. Hell, some basic upkeep would be nice.
Can we think of a platform that's not proven for 20m third rail vehicles at the moment?![]()
Huh? You can't compel the rolling stock companies to make a loss on their investments. Do we make the owners of office blocks lease their buildings out to the public sector on artificial terms?Perhaps the rolling stock leasing market needs reform, with ROSCOs compelled to negotiate on more favourable terms having enjoyed far higher profit margins than TOCs since privatisation (tax payer subsidised).
Huh? You can't compel the rolling stock companies to make a loss on their investments. Do we make the owners of office blocks lease their buildings out to the public sector on artificial terms?
It would depend on the scope of the refresh. A deep clean and new seats would improve passenger experience but not add much additional revenue. Higher capacity interiors could reduce the business case for replacement, though there was a rumour not that simple due to a weight restriction. It still wouldn't solve issues like lack of replacement parts or cost implications from higher failure rates in service.A Networker refresh would also likely reduce the business case for a new fleet.
The market could be reformed - they’ve had high returns for virtually zero risk for a long time.
A new fleet business case could also claim fewer drivers from more 12-car services with SDO alongside the higher capacity, better availability and lower maintenance cost benefits.
For SE Metro Victoria is nearly all 8-car as many stations are only 8-car platforms. Charing X 12-car networkers can only use platforms 1-3 (12-car mainline electrostars can use all with SDO) and can't call at Woolwich Dockyard which scuppers 12-car running for many Cannon Street services.It's curious, mentioning this, that the new south WCML timetable almost entirely removes 12 car running (there appears to be one weekday 12 car diagram only, plus a couple Saturday late evening) in favour of a stack of peak extras - far more than before!
It's a strange world sometimes. Might be so every train fits every platform at Euston, but I don't know if SE have that sort of constraint at Victoria and Charing X?
12 car running on SE Metro services has also been scuppered by limited fleet size, at least pre-covid. During the peak the service frequency combined with available fleet meant only a handful of formations were 12 car, and increasing the overall fleet size was also limited by stabling capacity. Had no Networkers gone to storage when 707s came over (i.e. because stabling capacity was sufficient and demand making it necessary), then it's possible more Networker diagrams could have been 12 car.For SE Metro Victoria is nearly all 8-car as many stations are only 8-car platforms. Charing X 12-car networkers can only use platforms 1-3 (12-car mainline electrostars can use all with SDO) and can't call at Woolwich Dockyard which scuppers 12-car running for many Cannon Street services.
There seems to have been a general shift on SE to fewer longer services including a few timetable tweaks to work around the current constraints.
Might as well lease out a few 08s to Marshall the stock around to cut even more costsWhich makes me wonder if the battery option is to allow a few extra stabling sidings to be built without the cost and safety issues surrounding 3rd rail installation. Being able to have far more sidings where fitters, cleaners etc can work in safety with the power off will be a huge benefit in 3rd rail land.
The 395s have 20m coaches.Hitachi are yet to produce a 20m 3rd rail train (at least in the UK) either.
Twelve car Networkers also use platform 6 as it can accomodate twelve 20m cars.For SE Metro Victoria is nearly all 8-car as many stations are only 8-car platforms. Charing X 12-car networkers can only use platforms 1-3 (12-car mainline electrostars can use all with SDO) and can't call at Woolwich Dockyard which scuppers 12-car running for many Cannon Street services.
There seems to have been a general shift on SE to fewer longer services including a few timetable tweaks to work around the current constraints.
#nomoneyMaybe a few 465s could be reduced to 3 car units, so that 11 car trains (4+3+3) could run into all the Charing Cross platforms!
Both FLU and RLUs have toilets mostly vandalised. FLUs seem to be in worse condition than the RLUsThats mostly the RLUs... it's rough in South East London![]()
Also 10 coaches can easily be achieved with a 4-4-2 with a 466

Can you write out the abbreviation if you don’t mind. I actually have no idea what that means.Both FLU and RLUs have toilets mostly vandalised. FLUs seem to be in worse condition than the RLUs
Can you write out the abbreviation if you don’t mind. I actually have no idea what that means.
Yeah442s get everywhere!
One of their managers appears to be Tweeting about this - he is saying it isn't aiming at a full fleet replacement, just the Networkers.
ThanksI suspect it is Full Length Units and Reduced Length Units, i.e. 12s and 8s.

Desiro City is the obvious choice, then, as it un-micro-fleets the 707s.442s get everywhere!
One of their managers appears to be Tweeting about this - he is saying it isn't aiming at a full fleet replacement, just the Networkers.
Twelve car Networkers also use platform 6 as it can accomodate twelve 20m cars.
11 is one better than 10. A bit Spinal Tap really#nomoney
They are getting replaced anyway, no point getting rid of a carriage and spending money on them
Also 10 coaches can easily be achieved with a 4-4-2 with a 466
This is a big order of trains, which shouldn't be driven by what units SE have already. And weren't there ceiling handrail/grabrail issues with the 707s which made them non compliant with the latest guidance? Plus they don't have toilets.Desiro City is the obvious choice, then, as it un-micro-fleets the 707s.
Siemens moved a lot of the electrical gubbins that conventionally lives in end-of-vehicle cabinets into the roof of the Desiro City in order to provide extra floorspace and wider gangways for the 700 tender, and yes that does complicate the positioning of grabrails, but I've not seen anything suggesting that the exact layout couldn't be revised in a new production run. As to the lack of toilets, that's simplyThis is a big order of trains, which shouldn't be driven by what units SE have already. And weren't there ceiling handrail/grabrail issues with the 707s which made them non compliant with the latest guidance? Plus they don't have toilets.
Yeah the 700s have toilets, the 717s have an obvious spot for where the toilet would be, not sure if the 707s do.As to the lack of toilets, that's simply SWR's original choice - not a limitation of the design.
4+3+3 is 10 coaches which is what you posted. Unless you meant 4-4-3?11 is one better than 10. A bit Spinal Tap really
My attitude to the Networkers is that they've been left to degenerate, but that isn't the fault of the units themselves. After all there's no thread demanding the immediate replacement of the 165s or 1990s Underground stock. If they had been properly overhauled 2 years ago, there wouldn't be the need to replace them now. The BREL units have been retractioned, while the Metro-Cammell units have similar equipment to the Underground 1996 stock, which will be in service for another 20 years.
This is a big order of trains, which shouldn't be driven by what units SE have already. And weren't there ceiling handrail/grabrail issues with the 707s which made them non compliant with the latest guidance? Plus they don't have toilets.
I would have thought that it would be useful ordering more 707s or similar Desiro Cities, simply because they already have staff trained to work with them, and they likely have experience on what they would change on the units if they were to order them again (as was SWTs original plan - order a small batch of 707s before commencing a huge order, to find improvements etc.)This is a big order of trains, which shouldn't be driven by what units SE have already. And weren't there ceiling handrail/grabrail issues with the 707s which made them non compliant with the latest guidance? Plus they don't have toilets.