South Wales 'Metro' updates

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
If converting to Light Rail was such a wonderful idea with proven benefits then why did they not do it? Why have the stuck with new Heavy Rail rolling stock? Clearly the gospel of Notatrainspott has yet to penetrate the West Midlands. The "surplus to requirement trackbed" the Midland Metro is on is now needed as the Heavy rail corridor from Wolverhampton to Birmingham has reached saturation point and part of the reason were now building HS2.

It's really not. HS2 is being built to relieve the south WCML and for the economic benefits it will bring. The Birmingham to Wolverhampton corridor has little or nothing to do with it, and could in any case be used more efficiently by stopping running short DMUs and EMUs up and down it and instead running proper-length trains[1] at a lower frequency.

[1] Example: run the WMR Shrewsbury-New St stopper such that the ATW fast will catch it up at Wolves, and couple them up for the run to New St.

Likewise on Merseyside theirs loads of Light Rail systems with underground sections across the world. Rip up that pesky non standard 3rd rail and put the "cheap" wires up and run cheap Light Rail vehicles instead of 3rd rail vehicles is surely a better solution? Why did the city fathers on Merseyside not lap this up?

This has been explained upthread multiple times by multiple people and you seem to be disregarding those explanations without actually challenging the content of them. Perhaps you might do so if you feel they are wrong?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
The "surplus to requirement trackbed" the Midland Metro is on is now needed as the Heavy rail corridor from Wolverhampton to Birmingham has reached saturation point and part of the reason were now building HS2.

I very much doubt that had the Midland Metro alignment been preserved as Heavy Rail that this would dash the justification for HS2.

Clearly the gospel of Notatrainspott has yet to penetrate the West Midlands.

Well, which has better local public transport? Manchester? Or Birmingham?

Birmingham has the Cross City line - which was extended to Bromsgrove - first extension for a very long time. And the Snow Hill lines which are a collection of DMU lines going west to east and which serve areas outside of the urban/suburban core in Warwickshire.

Whereas Manchester has a thriving and expanding light rail tram, and a collection of suburban lines.


It's fine to be against light rail conversion if you think it's unsuitable for the Valley Lines, but this thread is just exposing a wider prejudice against Light Rail in any circumstances and for any city.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
It's really not. HS2 is being built to relieve the south WCML and for the economic benefits it will bring. The Birmingham to Wolverhampton corridor has little or nothing to do with it, and could in any case be used more efficiently by stopping running short DMUs and EMUs up and down it and instead running proper-length trains[1] at a lower frequency.

[1] Example: run the WMR Shrewsbury-New St stopper such that the ATW fast will catch it up at Wolves, and couple them up for the run to New St.



This has been explained upthread multiple times by multiple people and you seem to be disregarding those explanations without actually challenging the content of them. Perhaps you might do so if you feel they are wrong?

It hasn't really been explained.

The conditions which you claim were unique to Liverpool (existence of 3rd rail HR lines) also applied to the Bury line. If anything, if power systems mattered, conversion to LR in Liverpool would have been more, not less, likely, as the lines potentially subject to it involved a much greater extent of non-standard (in local terms) equipment. Manchester Metrolinked a line already converted to 25 kv AC, but not another non-standard line (Glossop / Hadfield).

The other argument, that it was a question of timing, may be more relevant, but doesn't mean that LR actually became a better solution, only that attitudes to public spending changed. Yet again, it is worth pointing out that Manchester planned, and embarked on, construction of an HR SUBURBAN network.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
It's really not. HS2 is being built to relieve the south WCML and for the economic benefits it will bring. The Birmingham to Wolverhampton corridor has little or nothing to do with it, and could in any case be used more efficiently by stopping running short DMUs and EMUs up and down it and instead running proper-length trains[1] at a lower frequency.

So why does HS2 involve running services from Birmingham to Liverpool, Manchester and Scotland from Curzon St and not from New St via the Stour valley?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
The conditions which you claim were unique to Liverpool (existence of 3rd rail HR lines) also applied to the Bury line.

It didn't. There was one key difference from the Bury line - it was electrified on a non-standard system, 1200V side contact, not used anywhere else in the UK. Furthermore the infrastructure was life expired. Therefore, had it remained as a heavy rail system it'd have had to be removed and either run using DMUs or re-electrified, probably at 25kV.

Altrincham is a slightly different matter as it could have just been updated by the use of Class 323s, but then the presence of the OHLE meant converting it wasn't very costly either, so it was a good match.

Merseyrail by comparison used the standard 750VDC top contact exposed third rail system used throughout the South East. The infrastructure wasn't life-expired, but even if it was a progressive updating would have been possible (and indeed happened) using equipment made in bulk for the South East, and with new trains also made in bulk for the South East - the robust and reliable PEP EMUs which have served the system very well, over 40 years old by the time they are withdrawn. (They near enough share a birthday with me :) ).

Also relevant is when it was built. In the 1970s the car was king of the road, the bus the king of road public transport, and the internal combustion engine the future of that. Trams simply were not in vogue.

Had it been built when Metrolink was, there's a good chance the Link (Northern Line) would have been a tram. I outlined the route it would likely take in my post above. As an erstwhile local, as I also said above, I would have been equally happy with that as I am with Merseyrail as is. The Loop would have been more difficult to deliver as a tram because of the deep-level Mersey tunnels, and as such I suspect would have remained as heavy rail in any case, perhaps still terminating at Central low level.

If anything, if power systems mattered, conversion to LR in Liverpool would have been more, not less, likely, as the lines potentially subject to it involved a much greater extent of non-standard (in local terms) equipment. Manchester Metrolinked a line already converted to 25 kv AC, but not another non-standard line (Glossop / Hadfield).

It's not non-standard equipment. It's a fairly large network (much larger than the original Metrolink) and it's equipment that was totally standard within BR - that's all that mattered. As for Glossop and Hadfield, that has been 25kV for a long time; like Altrincham it was re-electrified (once Woodhead closed). It could be converted to Metrolink if there was a view to doing that; I don't really have a strong view as to whether it should or not, though I do have a strong view that we need to pack in using DMUs.

The other argument, that it was a question of timing, may be more relevant, but doesn't mean that LR actually became a better solution, only that attitudes to public spending changed. Yet again, it is worth pointing out that Manchester planned, and embarked on, construction of an HR SUBURBAN network.

And this is a big part of my case. I think both types of system have strengths and weaknesses, and for Cardiff, like for Merseyrail, I think the jury is somewhat out on which is best overall.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
So why does HS2 involve running services from Birmingham to Liverpool, Manchester and Scotland from Curzon St and not from New St via the Stour valley?

Because you might as well if you're going to build a high speed line from London to Manchester via Birmingham make the best use of it you can, not least because once it's built from Manchester high-capacity and high-comfort (wider) UIC gauge double deck stock can be used. Call it a side benefit - but it was not a reason to build HS2 in and of itself. As I've stated, the (far worse) capacity crunch on the south WCML (which is full of generally quite long trains, particularly the swathe of 11x24m Pendolinos many times an hour) was that key reason.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
This has been explained upthread multiple times by multiple people and you seem to be disregarding those explanations without actually challenging the content of them. Perhaps you might do so if you feel they are wrong?

https://www.smartcitiesdive.com/ex/...rail-tunnels-really-cost-prohibitive/1089228/
Trains running through the streets of downtown were considered not particularly practical as early as 1895 when the Howard Street tunnel was built instead. Similarly today's transit planners sometimes conclude that surface trains would encounter too much interference from pedestrians, bicyclists, trucks and cars, especially in the city center or the narrow streets of historic districts such as Baltimore's Fell's Point. Such interference would make transit agonizingly slow and their progress unpredictable.

Because this conclusion isn't new or specific to just one city, there are plenty of examples of underground light rail in the U.S., including legacy streetcar/light rail systems running in tunnels like in Philadelphia or Boston. New, modern low floor trains in tunnels under downtown in San Francisco, Seattle, and Pittsburgh, or under a university campus in San Diego.

Mersyrail already has tunnels i'm not talking boring new tunnels Tell me specifically whats the barrier to converting to Light Rail?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"

Not sure of the relevance to Cardiff or Merseyrail.

Mersyrail already has tunnels i'm not talking boring new tunnels Tell me specifically whats the barrier to converting to Light Rail?

You mean switching the existing service to use LRVs rather than heavy rail trains?

They sort-of are. The FLIRT is a lightweight EMU and it will be DOO. They could also destaff the stations other than the underground ones and replace with TVMs if they wanted, though I doubt they will. That would bring the costs right down.

But is there any point re-electrifying to DC overhead? No, not really, there's nothing really wrong with what's there.

Is there any point in bringing it onto the street at huge cost? No, not really, the tunnels are already there.

Is there any point switching to running on sight? Probably not, it would reduce capacity particularly on the tunnel sections.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
It didn't. There was one key difference from the Bury line - it was electrified on a non-standard system, 1200V side contact, not used anywhere else in the UK. Furthermore the infrastructure was life expired. Therefore, had it remained as a heavy rail system it'd have had to be removed and either run using DMUs or re-electrified, probably at 25kV.

Altrincham is a slightly different matter as it could have just been updated by the use of Class 323s, but then the presence of the OHLE meant converting it wasn't very costly either, so it was a good match.

Merseyrail by comparison used the standard 750VDC top contact exposed third rail system used throughout the South East. The infrastructure wasn't life-expired, but even if it was a progressive updating would have been possible (and indeed happened) using equipment made in bulk for the South East, and with new trains also made in bulk for the South East - the robust and reliable PEP EMUs which have served the system very well, over 40 years old by the time they are withdrawn. (They near enough share a birthday with me :) ).

Also relevant is when it was built. In the 1970s the car was king of the road, the bus the king of road public transport, and the internal combustion engine the future of that. Trams simply were not in vogue.

Had it been built when Metrolink was, there's a good chance the Link (Northern Line) would have been a tram. I outlined the route it would likely take in my post above. As an erstwhile local, as I also said above, I would have been equally happy with that as I am with Merseyrail as is. The Loop would have been more difficult to deliver as a tram because of the deep-level Mersey tunnels, and as such I suspect would have remained as heavy rail in any case, perhaps still terminating at Central low level.



It's not non-standard equipment. It's a fairly large network (much larger than the original Metrolink) and it's equipment that was totally standard within BR - that's all that mattered. As for Glossop and Hadfield, that has been 25kV for a long time; like Altrincham it was re-electrified (once Woodhead closed). It could be converted to Metrolink if there was a view to doing that; I don't really have a strong view as to whether it should or not, though I do have a strong view that we need to pack in using DMUs.



And this is a big part of my case. I think both types of system have strengths and weaknesses, and for Cardiff, like for Merseyrail, I think the jury is somewhat out on which is best overall.


The current extent of 3rd rail powered track around Merseyside must be close to double what it was in 1977.

I don't think any jury consisting of anyone who has regularly
travelled on Merseyrail, and anyone who has any experience of Metrolink, would take long deliberating on whether the former should have been built as light rail.

If light rail is so inherently wonderful, given that interurbans running off street were invented decades ago, why did it take until.the 1980s, and the no doubt entirely coincidental event of BR virtually running out of money, for its inherent superiority to be recognised?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
I very much doubt that had the Midland Metro alignment been preserved as Heavy Rail that this would dash the justification for HS2.



Well, which has better local public transport? Manchester? Or Birmingham?

Birmingham has the Cross City line - which was extended to Bromsgrove - first extension for a very long time. And the Snow Hill lines which are a collection of DMU lines going west to east and which serve areas outside of the urban/suburban core in Warwickshire.

Whereas Manchester has a thriving and expanding light rail tram, and a collection of suburban lines.


It's fine to be against light rail conversion if you think it's unsuitable for the Valley Lines, but this thread is just exposing a wider prejudice against Light Rail in any circumstances and for any city.

So Heavy Rail is OK for areas outside of the urban/suburban core in Warwickshire/West Midlands yet it is fine when proposed for South Wales? Merthyr Tydfil is farther from downtown Cardiff than Stratford Upon Avon is from the Bull Ring and more populous. Lets remember a lot of peoples opposition to TfW's plans (note not to Light Rail per se) are based on factors like this. We need to remember myself and others are talking about TfW's plans not Light v Heavy Rail.

Manchester has a thriving and expanding light rail tram, and a collection of suburban lines- which is what should be happening around Cardiff. Converting what we have already is daft, Light Rail should be filing in the gaps in provision in a 10 mile radius around the centre of Cardiff.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Not sure of the relevance to Cardiff or Merseyrail.

The article clearly states US experience as being against street running in most circumstances and shows how they have gone underground as a way of solving the serving the urban centre v getting clogged up on the street dilemma. In Cardiff the pre existing Heavy Rail alignment and location of stations convenient for the compact city centre means that Heavy Rail already serves the city very well therefore going on the street or even underground in Cardiff is a complete waste of time as they would be "solving" a non existent problem.
Merseyril effectively copied the US practice.

Because you might as well if you're going to build a high speed line from London to Manchester via Birmingham make the best use of it you can, not least because once it's built from Manchester high-capacity and high-comfort (wider) UIC gauge double deck stock can be used. Call it a side benefit - but it was not a reason to build HS2 in and of itself. As I've stated, the (far worse) capacity crunch on the south WCML (which is full of generally quite long trains, particularly the swathe of 11x24m Pendolinos many times an hour) was that key reason.

The HS2 team have made a fairly big play of avoiding the congested Stour Valley as a positive in presentations to Stakeholders and have verbally admitted that the Midland Metro has acted as a block on rail capacity to the North West and West of Birmingham.

You mean switching the existing service to use LRVs rather than heavy rail trains?

They sort-of are. The FLIRT is a lightweight EMU and it will be DOO. They could also destaff the stations other than the underground ones and replace with TVMs if they wanted, though I doubt they will. That would bring the costs right down.

But is there any point re-electrifying to DC overhead? No, not really, there's nothing really wrong with what's there.

Is there any point in bringing it onto the street at huge cost? No, not really, the tunnels are already there.

Is there any point switching to running on sight? Probably not, it would reduce capacity particularly on the tunnel sections.

If it isnt broke don't fix it? That's been mine and many other posters contention regarding Valley Lines and the so called "Core Valley Lines" proposal.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Not sure of the relevance to Cardiff or Merseyrail.



You mean switching the existing service to use LRVs rather than heavy rail trains?

They sort-of are. The FLIRT is a lightweight EMU and it will be DOO. They could also destaff the stations other than the underground ones and replace with TVMs if they wanted, though I doubt they will. That would bring the costs right down.

But is there any point re-electrifying to DC overhead? No, not really, there's nothing really wrong with what's there.

Is there any point in bringing it onto the street at huge cost? No, not really, the tunnels are already there.

Is there any point switching to running on sight? Probably not, it would reduce capacity particularly on the tunnel sections.


Now we're getting somewhere.

Re Merseyrail as it will be in a a few years, you're happy with the trains, with the signalling, with DOO and the tunnels. Only thing you're apparently unhappy about is the cost of staffing stations. In other words, you've no problem with a heavy rail suburban system, running exclusively off-street, as long as they keep the costs down, and your own comments identify that the costly aspects of Merseyrail relate to staffing issues, rather than it being a heavy rail system.

So why can't South Wales have something similar?
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
So Heavy Rail is OK for areas outside of the urban/suburban core in Warwickshire/West Midlands yet it is fine when proposed for South Wales? Merthyr Tydfil is farther from downtown Cardiff than Stratford Upon Avon is from the Bull Ring and more populous.

I didn't make any comment about heavy rail / light rail suitability for this particular route, so not sure where this comment originates?

But actually, Merthyr Tydfil is not further from Cardiff Central than Stratford-upon-Avon is from Birmingham Snow Hill.

Stratford-on-Avon is 24 miles from Birmingham Snow Hill
Merthyr Tydfil is 23 miles from Cardiff Central.

The 'local' Birmingham Snow Hill lines serve destinations as far as Worcester Shrub Hill. That's 35 miles away.

None of the mooted LR conversion lines are 35 miles from Cardiff Central.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
I didn't make any comment about heavy rail / light rail suitability for this particular route, so not sure where this comment originates?

But actually, Merthyr Tydfil is not further from Cardiff Central than Stratford-upon-Avon is from Birmingham Snow Hill.

Stratford-on-Avon is 24 miles from Birmingham Snow Hill
Merthyr Tydfil is 23 miles from Cardiff Central.

The 'local' Birmingham Snow Hill lines serve destinations as far as Worcester Shrub Hill. That's 35 miles away.

None of the mooted LR conversion lines are 35 miles from Cardiff Central.

In fairness your the only person whose attempted to answer the question of why the Snow Hill lines have not been converted to light rail. It serves community's some way from the urban core? So do Valley Lines.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
NotATrainspott,
The more you answer the more it confirms that you have not looked at a map of Cardiff, or read the comments of many people on here about it's physical and raliway geography and the problems that brings with any light rail proposal.
And you certainly have no idea about the crowd problems and the number of days that affects the City Centre.

Street running is rarely just added on top of the city centre as-is. Normally it is introduced as part of a wider set of traffic alterations - making some streets one-way, closing off others to private road users, etc. If street running happens in Cardiff city centre, it'll happen there too.

There's a point where frugality tips over into austerity fetishism, if not downright masochism.

No.

Transport systems are a means to an end, not an end in themselves. I know that's a shocking concept to raise on a site dedicated to obsessive interest in rail-based transportation as an end in itself. When politicians and taxpayers decide to fund a system, they're looking for what it can do, not just what it is. People don't want to linger about and admire urban transportation systems. They want to use them to get about the city region for their everyday lives.

Metrolink stations being simple means that there's as little as possible in the way of people as they go about their business. Every extra 'feature' of a heavier metro system involves extra physical or mental barriers which make it harder to access and use the transport system. Having platforms mere metres away from the shops, homes and facilities which people need transportation to and from is far, far easier for people than having them some distance away and underground, via busy ticket halls and flights of stairs or escalators.

Saving money on the stations makes it more financially viable to improve service frequency. Improving service frequency means you don't need to worry so much about the facilities at the station. On a Metrolink line with a 10tph service you're only going to be waiting three minutes on average to catch a tram. With timings like that there's simply no need for waiting rooms or essentially anything more than a bus stop.

You know what else comes with simplicity? Fewer things going wrong. The more stuff you need to encounter to use a transportation system, the higher the chance that something will go wrong. Metro systems depend on lifts and escalators to get people between the streets and platforms. When they inevitably require maintenance or break down, it creates great inconvenience for people. Those enclosed waiting rooms are only pleasant as long as they're kept lit, dry and warm - the very features which attract vagrancy and vermin. If you rely on features like these, then them going wrong creates a serious problem. Meanwhile, the existence of these things results in higher ongoing costs that aren't directly necessary for people to get moved around a city.

Just as an example, think about someone in a wheelchair. On HR, being in a wheelchair means relying on lifts in many places, either to leave an underground or overground station or to cross between platforms. Almost certainly at some point lifts are going to fail, leaving the wheelchair-bound passenger stranded or inconvenienced. When a wheelchair-bound person is making decisions about where to live, they'll have to consider the reliability of the transport system. On an 'austere' LR system, wheelchair accessibility is provided by default by things which are essentially unable to break down. There are only three stations on the entire Metrolink network which depend on lifts (Pomona, Cornbrook and Besses o' th' Barn). As a wheelchair user you have essentially nothing to fear about using the network, no matter what happens.

You do realise that it is possible to have the concrete bunkers of which you sound so fond on an HR system? Perhaps the waiting facilities at Mersyeside stations - which I'd suggest are the least railway users in a civilised country should be entitled to expect - might be one of the reasons why so many more travel by heavy rail, compared to in TfGMland.

More people will use HR in Merseyside because the metro network is on HR. The remaining HR lines in TfGMland are less metro-like and less popular than in Liverpool. Weirdly enough, one of the ways this could most easily be improved is with further LR conversion.


Why do you keep raising pre-metro systems? As they're light rail based, they should be right up your low cost thoroughfare. Britain doesn't have any pre-metro systems, but then few countries that I am aware of outside Britain have replaced heavy rail lines with LR only routes.

A pre-metro is a system using LR technology built with the explicit intention that it would later be converted to a fully segregated metro line. They were built by cities which believed their street-running tram networks would not work with car traffic in the city centre. Huge amounts of money was spent on moving city centre street running sections into tunnels. What makes it a pre-metro is that the funding wasn't available or the passenger numbers didn't yet necessitate full segregation all the way along the lines. The tunnels in the centre were done but the lines out into the suburbs still required street running. What we have found with time is that the premise of these systems - that street running in city centres is antiquated - is false. People don't like sharing city centres with cars, but they don't mind sharing them with electric trams. City centres should belong to pedestrians and public transport, with cars kept hidden away, not the other way around.

[/QUOTE]I am deeply sceptical of anyone who suggests that buses are a better mode of transport than any other, rather than just a cheaper one. Are you now arguing that it was a good thing that almost every British town and city dismantled their street tramways networks? Seems like the main basis for every one of your arguments is cheapness, although I am perhaps being a bit unfair when we consider how much the Rotherham tram-trains fiasco is costing.[/QUOTE]

Also, isn't it a teensy bit inconsistent to be arguing that the cost of maintaining underground stations is a disadvantage of HR, before admitting down the page that Manchester will need a cross-city tunnel soon? How do you expect passengers to get to and from that? Via the sewers, which by the sounds of things is the sort of miserable, but cheap, solution you'd enjoy?

Manchester would need a new tunnel only when passenger numbers are high enough that the costs of such a system are truly warranted. Each transport mode has an optimum point along that demand/capacity spectrum. Street running light rail is very good at a certain band, but at the upper reaches the advantages of a heavier and more expensive system outweigh the disadvantages. Street running in London Zone 1 hasn't made sense for a very long time. Looking ahead, the multi-billion pound expense of extending the Bakerloo line down Old Kent Road is justified because there are so many people travelling along that road on buses, and so much future development potential still to come, that nothing less than a proper heavy metro will handle demand. It's simply impossible to run 120m long trains at 30tph using street running on a busy urban thoroughfare. LR isn't suitable there, but that doesn't mean it's not suitable in places with lower demand which are still too busy for buses to handle.

Look at transport systems around the world. Every city depends on its bus services more than anything else. Trams and metros and heavy rail have to build on top of buses. The countries and cities with the most public-transport friendly governments (e.g. in Switzerland) don't stop running buses just because there are more intensive ways of providing transport instead. Buses suit rural and low-density suburbs. Trolleybuses then carry the mantle for low-medium density suburbs, followed closely after by trams, light metros and then heavy metros. Each technology is complementary, not in competition with one another.

You certainly are struggling with the rail geography of Birmingham. The electrified cross city line uses New St and shares its tracks south of New St with Long Distance Cross Country services however north of it to Lichfield and Walsall/Rugely they don't share with anything else.
The Snow Hill lines refer to the ex Great Western lines from Kidderminster /Stourbridge Junction to Leamington Spa/Stratford Upon Avon. Chiltern Railways run to Birmingham from Marylebone via Leamington Spa and Solihull. You could segregate those services from Leamington Spa into central Birmingham quite well as they run in on a ex 4 track formation and tie the converted local HR lines with the current Midland Metro.

If converting to Light Rail was such a wonderful idea with proven benefits then why did they not do it? Why have the stuck with new Heavy Rail rolling stock? Clearly the gospel of Notatrainspott has yet to penetrate the West Midlands. The "surplus to requirement trackbed" the Midland Metro is on is now needed as the Heavy rail corridor from Wolverhampton to Birmingham has reached saturation point and part of the reason were now building HS2. Light Rail got chosen to reopen the local service to Wolverhampton from Snow Hill because at the time in the mid 80's the Ministry of Roads was still hectoring BR to put forward lines for closure and bustitution so a Light Rail system not involving BR was seen as way of side stepping central Government hostility.

Again, you ignore what I write. If you're not able to essentially take over a line in its entirety, LR technology simply can't deliver as many benefits as it can on more dedicated lines.

If you used the West Midlands Metro trackbed to serve further-out areas of the West Midlands, it would come at the cost of serving the inner areas worse. Clearly there was enough value in serving the inner areas that they built the system in the first place. These tracks are used to serve a different point along my demand/capacity spectrum than the HR services heading out to Leamington Spa. The only way to serve both is to have two independent systems, which is essentially what we've got today. What HS2 is doing is shifting some of the longer-distance passengers onto new tracks, allowing the existing HR infrastructure to become more dedicated to urban and regional transportation.

Likewise on Merseyside theirs loads of Light Rail systems with underground sections across the world. Rip up that pesky non standard 3rd rail and put the "cheap" wires up and run cheap Light Rail vehicles instead of 3rd rail vehicles is surely a better solution? Why did the city fathers on Merseyside not lap this up?
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
Yes, I agree with you Gareth - except with one additional observation. If you take say Shrub Hill from Birmingham or Stratford from Birmingham, there are long stretches of open Warwickshire / Worcestershire countryside.

Geographically, a run along the valley lines to Rhymney, Merthyr or Treherbert follows long tentacles of settlements - in most places pretty much continuous - along the valley floors. There are no sections longer than about three miles without a station and there's a station on average every 1.3 miles.

I don't think geographically etc. they are quite the same.


While I'm okay about Light Rail - I can see some benefits - more important than the eventual units running, for me, is getting electrification. Lots of stops, short distances between stops, frequent service - begging for electrification - whether for LR or HR.

I'll accept whatever system they choose if electrification is part of the solution.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
The article clearly states US experience as being against street running in most circumstances and shows how they have gone underground as a way of solving the serving the urban centre v getting clogged up on the street dilemma. In Cardiff the pre existing Heavy Rail alignment and location of stations convenient for the compact city centre means that Heavy Rail already serves the city very well therefore going on the street or even underground in Cardiff is a complete waste of time as they would be "solving" a non existent problem.
Merseyril effectively copied the US practice.

And in 1977 (or around when the decisions were being made, so probably about 1970) the UK was heading the way of the US in its "car is king" approach. We got things like the Birmingham Queensways and similar but smaller scale infrastructure in Liverpool. We were building things like Milton Keynes. The US is still like that - hence the opposition to street running.

In 2018, we don't think like that any more. The US does. Hence the difference in view.

The HS2 team have made a fairly big play of avoiding the congested Stour Valley as a positive in presentations to Stakeholders and have verbally admitted that the Midland Metro has acted as a block on rail capacity to the North West and West of Birmingham.

That doesn't mean it's not only really a side benefit. HS2 has a lot of critics, so they need to shout about all its benefits to keep it going.

If it isnt broke don't fix it? That's been mine and many other posters contention regarding Valley Lines and the so called "Core Valley Lines" proposal.

But it is broke, it's not electrified. Though I agree I would be happy with a 25kV OHLE based S-Bahn system, and one way to deliver that cheaply would be to run it using Class 319s or 323s initially and purchase new stock later.

I'm not anti-heavy-rail (though I *am* anti-diesel), I just don't think trams are a bad option.

That isn't just because of a dislike of DMUs; a 319 hardly provides hugely more comfort than a 158, indeed the 158 is quite a bit nicer. It's because burning dead dinosaurs is getting seriously deprecated, particularly the particulate-belching diesel form of them. In the face of electric bus technology maturing nicely (there's already a route in MK run using them, not to mention the Red Arrows in London) there is likely to be serious pressure on the railway to electrify or close routes...and none of us want that, do we? Therefore, we need to get the wires up, be they 25kV or 750VDC, and we need to do it now. And yes, I oppose the Snow Hill DMU order; those lines need wiring, with only the Herefords on diesel and even then they should be bi-mode. The 172s really should have been the last DMU order the UK ever made.
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
In fairness your the only person whose attempted to answer the question of why the Snow Hill lines have not been converted to light rail. It serves community's some way from the urban core? So do Valley Lines.

Don't forget the Herefords. Yes, they run to New St, but they also serve common sections of line with the 172s. And I think the Ormskirk/Kirkby solution (double buffer stops) is rather deprecated these days.

Yes, Stratford is quite standalone, but none of the rest of the Snow Hill lines are. Turning them into trams would be more like trying to turn Cardiff Central to Swansea into a tram line, or Manchester to Stockport, or something.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
Yes, I agree with you Gareth - except with one additional observation. If you take say Shrub Hill from Birmingham or Stratford from Birmingham, there are long stretches of open Warwickshire / Worcestershire countryside.

Geographically, a run along the valley lines to Rhymney, Merthyr or Treherbert follows long tentacles of settlements - in most places pretty much continuous - along the valley floors. There are no sections longer than about three miles without a station and there's a station on average every 1.3 miles.

I don't think geographically etc. they are quite the same.

Exactly this!!
And which is why more than one member here should look and understand a map of the region and the city.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Yes, I agree with you Gareth - except with one additional observation. If you take say Shrub Hill from Birmingham or Stratford from Birmingham, there are long stretches of open Warwickshire / Worcestershire countryside.

Geographically, a run along the valley lines to Rhymney, Merthyr or Treherbert follows long tentacles of settlements - in most places pretty much continuous - along the valley floors. There are no sections longer than about three miles without a station and there's a station on average every 1.3 miles.

I don't think geographically etc. they are quite the same.


While I'm okay about Light Rail - I can see some benefits - more important than the eventual units running, for me, is getting electrification. Lots of stops, short distances between stops, frequent service - begging for electrification - whether for LR or HR.

I'll accept whatever system they choose if electrification is part of the solution.

Creating a Light Rail network based on Snow Hill is quite easy. Hereford and Worcester can access New St via Bromsgrove. You can have Heavy Rail running alongside Light Rail from Dorridge into Birmingham utilizing the 4 track formation. Stratford can have Light Rail one way to Birmingham and Heavy Rail the other. A heavy rail shuttle between Worcester and Kidderminster would be needed.
We constantly hear from Metrolink fans that the disbenefits to the Mid Cheshire line being diverted at Altrincham are far outweighed by the benefits elsewhere of Light Rail round Greater Manchester. Surely (if true) that should apply to the West Midlands also? The massive benefits of Light Rail to Kidderminster/Stourbridge/Solihull etc surely outweigh the incontinence elsewhere?

The reality of course is that no one sees that the benefits of Light Rail as being that great they can justify some relatively minor rejigging of heavy rail services from Worcester......
 
Last edited:

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
No.

Transport systems are a means to an end, not an end in themselves. I know that's a shocking concept to raise on a site dedicated to obsessive interest in rail-based transportation as an end in itself. When politicians and taxpayers decide to fund a system, they're looking for what it can do, not just what it is. People don't want to linger about and admire urban transportation systems. They want to use them to get about the city region for their everyday lives.

Metrolink stations being simple means that there's as little as possible in the way of people as they go about their business. Every extra 'feature' of a heavier metro system involves extra physical or mental barriers which make it harder to access and use the transport system. Having platforms mere metres away from the shops, homes and facilities which people need transportation to and from is far, far easier for people than having them some distance away and underground, via busy ticket halls and flights of stairs or escalators.

Saving money on the stations makes it more financially viable to improve service frequency. Improving service frequency means you don't need to worry so much about the facilities at the station. On a Metrolink line with a 10tph service you're only going to be waiting three minutes on average to catch a tram. With timings like that there's simply no need for waiting rooms or essentially anything more than a bus stop.

You know what else comes with simplicity? Fewer things going wrong. The more stuff you need to encounter to use a transportation system, the higher the chance that something will go wrong. Metro systems depend on lifts and escalators to get people between the streets and platforms. When they inevitably require maintenance or break down, it creates great inconvenience for people. Those enclosed waiting rooms are only pleasant as long as they're kept lit, dry and warm - the very features which attract vagrancy and vermin. If you rely on features like these, then them going wrong creates a serious problem. Meanwhile, the existence of these things results in higher ongoing costs that aren't directly necessary for people to get moved around a city.

Just as an example, think about someone in a wheelchair. On HR, being in a wheelchair means relying on lifts in many places, either to leave an underground or overground station or to cross between platforms. Almost certainly at some point lifts are going to fail, leaving the wheelchair-bound passenger stranded or inconvenienced. When a wheelchair-bound person is making decisions about where to live, they'll have to consider the reliability of the transport system. On an 'austere' LR system, wheelchair accessibility is provided by default by things which are essentially unable to break down. There are only three stations on the entire Metrolink network which depend on lifts (Pomona, Cornbrook and Besses o' th' Barn). As a wheelchair user you have essentially nothing to fear about using the network, no matter what happens.



More people will use HR in Merseyside because the metro network is on HR. The remaining HR lines in TfGMland are less metro-like and less popular than in Liverpool. Weirdly enough, one of the ways this could most easily be improved is with further LR conversion.




A pre-metro is a system using LR technology built with the explicit intention that it would later be converted to a fully segregated metro line. They were built by cities which believed their street-running tram networks would not work with car traffic in the city centre. Huge amounts of money was spent on moving city centre street running sections into tunnels. What makes it a pre-metro is that the funding wasn't available or the passenger numbers didn't yet necessitate full segregation all the way along the lines. The tunnels in the centre were done but the lines out into the suburbs still required street running. What we have found with time is that the premise of these systems - that street running in city centres is antiquated - is false. People don't like sharing city centres with cars, but they don't mind sharing them with electric trams. City centres should belong to pedestrians and public transport, with cars kept hidden away, not the other way around.





Manchester would need a new tunnel only when passenger numbers are high enough that the costs of such a system are truly warranted. Each transport mode has an optimum point along that demand/capacity spectrum. Street running light rail is very good at a certain band, but at the upper reaches the advantages of a heavier and more expensive system outweigh the disadvantages. Street running in London Zone 1 hasn't made sense for a very long time. Looking ahead, the multi-billion pound expense of extending the Bakerloo line down Old Kent Road is justified because there are so many people travelling along that road on buses, and so much future development potential still to come, that nothing less than a proper heavy metro will handle demand. It's simply impossible to run 120m long trains at 30tph using street running on a busy urban thoroughfare. LR isn't suitable there, but that doesn't mean it's not suitable in places with lower demand which are still too busy for buses to handle.

Look at transport systems around the world. Every city depends on its bus services more than anything else. Trams and metros and heavy rail have to build on top of buses. The countries and cities with the most public-transport friendly governments (e.g. in Switzerland) don't stop running buses just because there are more intensive ways of providing transport instead. Buses suit rural and low-density suburbs. Trolleybuses then carry the mantle for low-medium density suburbs, followed closely after by trams, light metros and then heavy metros. Each technology is complementary, not in competition with one another.


The more you write, the planner it becomes that your overriding obsession is with spending as little as possible on public transport. Fair enough: there is no reason why things should cost more than they need to. But there comes a point where the baby gets thrown out with the bathwater, by having a system which is so low spec that nobody actually wants to use it, unless they really have to. And the major problem with light rail in this respect, as demonstrated in Manchester every morning, is miserably low capacity, which can only be alleviated by restoring the features that an HR suburban system would have had, in particular the city centre tunnel (despite the fact that you are still using the lack of city centre street running as a stick to beat HR systems with). Pretty much all the other costs-saving measures you advocate could be achieved on an HR system.

More deeply, though, I think we approach this from different starting points. You seem to feel that an urban area of 2.8 million people, like Manchester, or however many live in south-east Wales, will not generate enough journeys to justify investment in the sort of suburban rail systems which are taken for granted in similar-sized congregations in Germany. (You talk about a hierarchy of transport, but those cities use U-bahns and tramways to supplement S-bahn systems, not as the main means of transport for the whole urban area). I take the view that we should be looking at what other advanced countries are providing in terms of public transport, and consider them as benchmarks for our cities. We're really not as special in this country as we like to delude ourselves into thinking we are.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
And in 1977 (or around when the decisions were being made, so probably about 1970) the UK was heading the way of the US in its "car is king" approach. We got things like the Birmingham Queensways and similar but smaller scale infrastructure in Liverpool. We were building things like Milton Keynes. The US is still like that - hence the opposition to street running.

In 2018, we don't think like that any more. The US does. Hence the difference in view.



That doesn't mean it's not only really a side benefit. HS2 has a lot of critics, so they need to shout about all its benefits to keep it going.



But it is broke, it's not electrified. Though I agree I would be happy with a 25kV OHLE based S-Bahn system, and one way to deliver that cheaply would be to run it using Class 319s or 323s initially and purchase new stock later.

I'm not anti-heavy-rail (though I *am* anti-diesel), I just don't think trams are a bad option.

That isn't just because of a dislike of DMUs; a 319 hardly provides hugely more comfort than a 158, indeed the 158 is quite a bit nicer. It's because burning dead dinosaurs is getting seriously deprecated, particularly the particulate-belching diesel form of them. In the face of electric bus technology maturing nicely (there's already a route in MK run using them, not to mention the Red Arrows in London) there is likely to be serious pressure on the railway to electrify or close routes...and none of us want that, do we? Therefore, we need to get the wires up, be they 25kV or 750VDC, and we need to do it now. And yes, I oppose the Snow Hill DMU order; those lines need wiring, with only the Herefords on diesel and even then they should be bi-mode. The 172s really should have been the last DMU order the UK ever made.

Valley Lines is far less "broke" than you believe. The track and signalling are all modern for a start. There are already turn up and go frequencies from Penarth and Barry in the south that run via highly convenient city center stops away from road traffic out as far as Abercynon and Bargoed. Its the rolling stock that's not up to scratch - anything with a Pacer is. There should also be Smart ticketing and penalty fares across the area - however this is all because of poor Government transport policy not because of any endemic problem with Heavy Rail. The Welsh Government could and should have implemented a rolling programme of improvements over many years instead they have opted to leave it and leave it and leave it and now want to do something that's shiny and new (for a part of it anyway).
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
The more you write, the planner it becomes that your overriding obsession is with spending as little as possible on public transport. Fair enough: there is no reason why things should cost more than they need to. But there comes a point where the baby gets thrown out with the bathwater, by having a system which is so low spec that nobody actually wants to use it, unless they really have to. And the major problem with light rail in this respect, as demonstrated in Manchester every morning, is miserably low capacity, which can only be alleviated by restoring the features that an HR suburban system would have had, in particular the city centre tunnel (despite the fact that you are still using the lack of city centre street running as a stick to beat HR systems with). Pretty much all the other costs-saving measures you advocate could be achieved on an HR system.

More deeply, though, I think we approach this from different starting points. You seem to feel that an urban area of 2.8 million people, like Manchester, or however many live in south-east Wales, will not generate enough journeys to justify investment in the sort of suburban rail systems which are taken for granted in similar-sized congregations in Germany. (You talk about a hierarchy of transport, but those cities use U-bahns and tramways to supplement S-bahn systems, not as the main means of transport for the whole urban area). I take the view that we should be looking at what other advanced countries are providing in terms of public transport, and consider them as benchmarks for our cities. We're really not as special in this country as we like to delude ourselves into thinking we are.

South East Wales has 1.5 million people. What should be a plan for a Metro sytem for the entire region has been hijacked for political reasons into a Light Rail Conversion of existing Heavy Rail lines that serve c250K -c300K of them. Transport for Wales overriding rational for what its proposing has very little to do with Notatrainspott fundamentalist views.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
South East Wales has 1.5 million people. What should be a plan for a Metro sytem for the entire region has been hijacked for political reasons into a Light Rail Conversion of existing Heavy Rail lines that serve c250K -c300K of them. Transport for Wales overriding rational for what its proposing has very little to do with Notatrainspott fundamentalist views.
Notatrainspott's views came over to me as analytical, not as 'views'. However, given that the HR approaches to Cardiff Queen St do not provide an inner city service, this has to be provided by buses, then later, perhaps trolley buses, then later perhaps trams, then later perhaps metro (I suspect never though), as time and developments take place, as he explained.

What approaches appear best suited to Swansea and Newport, though?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Notatrainspott's views came over to me as analytical, not as 'views'. However, given that the HR approaches to Cardiff Queen St do not provide an inner city service, this has to be provided by buses, then later, perhaps trolley buses, then later perhaps trams, then later perhaps metro (I suspect never though), as time and developments take place, as he explained.

What approaches appear best suited to Swansea and Newport, though?

Newport - is quite simple it sits on the Mainline to Paddington and long distance services run through it en route to Cardiff, Bristol, Manchester and Birmingham also. Theirs scope for expanded Heavy Rail outer suburban services to Cardiff from places link Abergavenny, Chepstow that pass through Newport en route to Cardiff along with reopened stations. These have all been kicked into the long grass by TfW's Core Valleys Lines plans. Another scheme that should of already happened is connecting Ebbw Valley services direct into Newport, given that the Ebbw Valley services run to Cardiff via the Mainline they have to be Heavy Rail also. Though Light Rail to Caerphilly has also been mooted the old Brecon & Merthyr Railway route into the Rhymney Valley shares tracks with the Ebbw Valley services and the natural route into Newport is via the Mainline.

The problem areas are really the Sirhowy Valley and Pontypool who have had their old trackbeds taken over by road schemes. Fighting any sort of rail whether it be heavy or light into these very deprived areas is going to be challenging due to the roads which the valley dwellers were promised would bring economic development that hasn't happened.

Swansea - the High St station sits on the mainline and serves as the gateway to West Wales. However there are large areas that had their rail services taken away in and around Swansea including some fairly large villages/small towns on the periphery of Swansea. A Light Rail system would work for these areas.

Pontarddulais- Gorseinon- Killay-Duvnat- Swansea University- Swansea Maritime Quarter- Fabian Way- Jersey Marine- Neath Riverside- Glynneath.
With branches to Mumbles, Morriston via Swnsea Enterprise Park terminating at a Park & Ride station on the Swansea District Line. The problem area is the Swansea Valley out to Pontardawe and Ystradgynlais as the magic road that didnt bring economic development was built on the trackbeds.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,142
I did mention a proposed new Arena was on the cards for Cardiff way back is this forum. Well, now we have confirmation today that it will be built in the Bay. I think that this could be partly to justify the expense of having a metro tram/ tram-train running into this area. Whilst a steady flow of passengers always goes by bus or train to/from the Bay, an Arena is likely to generate sudden massive flows of people which surely a new tram/tram-train system will find it hard to cope with? Had the new Arena been built a short walk form the Central Station, transport systems would have found it much easier to cope with dispersing people in various directions. I predict that a lot of the users of an Arena in the Bay will walk the 1 mile to/from the Central Station or more likely try and go by car.

https://www.walesonline.co.uk/business/location-new-indoor-arena-cardiff-14264726
"A viable, high quality public transport service needs regular paying passengers. The ability to attract 15000 visitors to the city on a regular basis who arrive either at the city limits and use park and ride facilities or by train in the city centre and need to get to the Bay will provide the passenger numbers which will help make the dream of a metro system a reality and expedite the completion of the Eastern Bay Link Road. It will also generate the visitors needed to sustain other visitor attractions in the city".
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
I did mention a proposed new Arena was on the cards for Cardiff way back is this forum. Well, now we have confirmation today that it will be built in the Bay. I think that this could be partly to justify the expense of having a metro tram/ tram-train running into this area. Whilst a steady flow of passengers always goes by bus or train to/from the Bay, an Arena is likely to generate sudden massive flows of people which surely a new tram/tram-train system will find it hard to cope with? Had the new Arena been built a short walk form the Central Station, transport systems would have found it much easier to cope with dispersing people in various directions. I predict that a lot of the users of an Arena in the Bay will walk the 1 mile to/from the Central Station or more likely try and go by car.

https://www.walesonline.co.uk/business/location-new-indoor-arena-cardiff-14264726
Oh please no, not in Cardiff. Give it to Newport or Swansea. There is such a thing as over development.
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
I did mention a proposed new Arena was on the cards for Cardiff way back is this forum. Well, now we have confirmation today that it will be built in the Bay. I think that this could be partly to justify the expense of having a metro tram/ tram-train running into this area. Whilst a steady flow of passengers always goes by bus or train to/from the Bay, an Arena is likely to generate sudden massive flows of people which surely a new tram/tram-train system will find it hard to cope with?

Go to Manchester and see how Metrolink copes quite well with major events at multiple venues (answer: much better than heavy rail does). Queueing systems may be needed at times, but it will all work rather better than a Class 153 every 20 minutes or whatever it is.
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
South East Wales has 1.5 million people. What should be a plan for a Metro sytem for the entire region has been hijacked for political reasons into a Light Rail Conversion of existing Heavy Rail lines that serve c250K -c300K of them. Transport for Wales overriding rational for what its proposing has very little to do with Notatrainspott fundamentalist views.

Not quite sure about these numbers, they look a little low to me... The towns of Pontypridd, Caerphilly, Merthyr Tydfil and Aberdare alone clock up 170,000 people, to say nothing of the various settlements between them, plus the northern Cardiff suburbs (Heath, Lisvane, Llanishen, Thornhill, Radyr, Whitchurch, Rhiwbina etc. etc.) which are served by the lines north of Queen Street.

My guess would be more like 0.5m people live within 1 mile of a Valley Lines station (north of Queen Street).
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
Go to Manchester and see how Metrolink copes quite well with major events at multiple venues (answer: much better than heavy rail does). Queueing systems may be needed at times, but it will all work rather better than a Class 153 every 20 minutes or whatever it is.

Having been to Twickenham and London premiership clubs several times, in my experience the crowds are dispersed far faster by Underground than by National Rail.
 