Quite. This morning at 8.30, I boarded a 6 car Merseyrail EMU at a Northern Line station on the fringes of Liverpool's contiguous built-up area. This was roughly 3/4 full. Trains now run 6 per hour at that time of day.

There's no magic to running an efficient and popular HR suburban service - it's just a question of putting on enough trains, with enough capacity.

It's also hugely costly. Merseyrail attracts the highest per passenger mile operating subsidy on the mainland. Metrolink receives no operating subsidy whatsoever; subsidy is paid only for capital projects. With pressures on funding, if the latter can provide a service that is broadly equivalent it has to win (both systems have advantages and disadvantages; living in MK without any proper local rail system I'd happily take either, as I suspect would most people around the UK in an area without proper local rail).

Most of the complaints around Metrolink these days seem to be centred on the trams being a bit rubbish in terms of length and interior layout. I agree - they are. But there are other designs to choose from on the market.

Long term there are also other options, such as a Den Haag-style Tramtunnel, which would provide most of the benefits of HR while retaining many of those of LR such as lower cost. But there are big benefits to street running, not least there being next to no walk to reach the platforms from the shopping/business street, which for most users will make up for slightly slower city centre running. There's also a massive billboard running down the line every couple of minutes shouting "use me", not hidden away underground.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I conclude from what is written here that an HR system works well, when there is a convenient situation of the termini. Queen St and Central appear to satisfy that criterion. In my home city (Bristol) that is not so, at least for shopping and sports viewing. Nor are the main approach suburbs served (especially since the MR route has been made into a cycleway). Sheffield stations, even if Vic was reopened, are a bit on the fringes too. Leeds is similar. For these locations, tram /tram train might seem sensible. The alternative is to move the venues that are the reasons for visits together and near the railway terminus, over time.
For Cardiff, the HR network seems broadly sufficiently catering for what is required. I haven't read what folk think should be done in Newport and Swansea.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
It's also hugely costly. Merseyrail attracts the highest per passenger mile operating subsidy on the mainland. Metrolink receives no operating subsidy whatsoever; subsidy is paid only for capital projects. With pressures on funding, if the latter can provide a service that is broadly equivalent it has to win (both systems have advantages and disadvantages; living in MK without any proper local rail system I'd happily take either, as I suspect would most people around the UK in an area without proper local rail).

Most of the complaints around Metrolink these days seem to be centred on the trams being a bit rubbish in terms of length and interior layout. I agree - they are. But there are other designs to choose from on the market.

Long term there are also other options, such as a Den Haag-style Tramtunnel, which would provide most of the benefits of HR while retaining many of those of LR such as lower cost. But there are big benefits to street running, not least there being next to no walk to reach the platforms from the shopping/business street, which for most users will make up for slightly slower city centre running. There's also a massive billboard running down the line every couple of minutes shouting "use me", not hidden away underground.


Few of the disadvantages you cite are inherent to HR. Merseyrail could be run a lot more cheaply if staff numbers were cut with DOO, and by reducing the number of staff doing nothing most of the time at central stations (they could be replaced by re-assigning admin staff to stations and giving them evacuation training). It doesn't take long to get underground, and any time taken in doing so is set off against the reduction in time getting across the city centre several times more quickly than an on-street option would require.

The advantages of LR which you describe are somewhat offset by putting it into a tunnel, quite apart from the cost of construction. And that doesn't get around the almost unavoidable reduction in capacity, unless you string so many trams together that they're incapable of running on oh-so-flexible LR lines.

Once again, all this really boils down to is 'let's turn everything into light rail coz it's cheap', even though it is possible to reduce the cost differential substantially with heavy rail. There is a danger here of knowing the price of everything, and the value of nothing.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
Actually, funny you mention DOO. One aspect of a LR conversion is that there is almost no scope for industrial action regarding DOO - what a conversion legally is is a closure, and so you have redundancies (or redeployment within ATW) of HR drivers and guards and other staff, and then you employ tram drivers afresh. That may be one significant reason for selecting LR on its own, if you assume DOO has to feature in order to keep costs down.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Actually, funny you mention DOO. One aspect of a LR conversion is that there is almost no scope for industrial action regarding DOO - what a conversion legally is is a closure, and so you have redundancies (or redeployment within ATW) of HR drivers and guards and other staff, and then you employ tram drivers afresh. That may be one significant reason for selecting LR on its own, if you assume DOO has to feature in order to keep costs down.
So if it really is such a simples numbers game of the nirvana of saved costs why have the city fathers stuck with Heavy Rail in Liverpool and the West Midlands and ordered significant numbers of new HR rollling stock?if your right they would have been beating the door of DFT or financing themselves?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
So if it really is such a simples numbers game of the nirvana of saved costs why have the city fathers stuck with Heavy Rail in Liverpool and the West Midlands and ordered significant numbers of new HR rollling stock?if your right they would have been beating the door of DFT or financing themselves?

Re Liverpool it's because the infrastructure, including, crucially, the electrification, is already there. If Merseyrail had been built 5 years later it would almost certainly have been a light rail underground like the Newcastle Metro. 10-15 years later and you could bet on the Northern Line being a tram. (The Wirral Line is a little more complex as it involves the Mersey tunnel - it's by no means certain there'd have been somewhere sensible to bring it above ground for a tram).

Re Birmingham, would you genuinely be happy if they just ordered a fleet of 3-car CAF or Stadler DMUs then did nowt else including no changes to frequencies etc? That's a cheap option, not necessarily the best option.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Re Liverpool it's because the infrastructure, including, crucially, the electrification, is already there. If Merseyrail had been built 5 years later it would almost certainly have been a light rail underground like the Newcastle Metro. 10-15 years later and you could bet on the Northern Line being a tram. (The Wirral Line is a little more complex as it involves the Mersey tunnel - it's by no means certain there'd have been somewhere sensible to bring it above ground for a tram).

Re Birmingham, would you genuinely be happy if they just ordered a fleet of 3-car CAF or Stadler DMUs then did nowt else including no changes to frequencies etc? That's a cheap option, not necessarily the best option.
the cross city line In Birmingham was wired in the early 90's somewhat pulling the rug from your timeline theory on Merseyside. The Snow Hill lines were also joined up in the mid 90's again after Tyne and Wear and Metrolink......

As to frequencies again were not talking about hourly or half hourly on the Birmingham Cross City lines there much better than that and are already at turn up and go levels across the core.


So if Light Rails primary advantage is cheapness but Modern DMu is cheaper then please explain why more has to be spent for The light rail?
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
More meaningless waffle from Ken Skates in the Assembly this afternoon when challenged by Leanne Wood over the secrecy of the award of the franchise and TfW's refusal to publicly release the ITT documents

http://record.assembly.wales/Plenary/4905#C59183

Leanne Wood: It's baffling as to why you are conducting the franchise tendering process under such a thick veil of secrecy. Unlike the UK Government's Department for Transport and Transport Scotland, you are refusing to publish the invitation-to-tender documents that have been issued to bidders. If you did publish those documents, people in Wales—the people who are herded onto those train services every day—would have the opportunity to analyse the criteria and offer ideas as to ways in which they could be improved. The mistakes of the last rail franchise for Wales can be laid at the door of an arm's-length Westminster body.

As a frequent traveller on the Valleys lines coming down from the Rhondda, it's no surprise to me to see customer satisfaction with rail services in Wales has dropped. The conditions are often appalling. If things don't improve this time, there'll be no hiding place for you and for your Labour Cabinet colleagues. Why not publish the franchise documents, get the people involved, open yourself up to greater scrutiny to deliver a better rail franchise that works for everyone? What are you afraid of?

Ken Skates: We're afraid of nothing. The Member should recognise, though, first of all, that this a world first in terms of the process that we're following. It's not being done anywhere else in the world, it is truly innovative and it's designed to ensure that we challenge experts in the field to bring forward the best possible solutions for Welsh travellers. There is no doubt whatsoever that we have to see a step change in terms of service delivery, in terms of punctuality and in terms of satisfaction, and each of the bidders have been challenged to bring forward within an envelope all of the best solutions based on new and emerging technology, and based on the drive for greater satisfaction amongst passengers.

Now, I can accept criticism for not publishing the full tender documents at this stage, but the reason we can't publish detailed information within the period of invitation to submit final tenders is because we could jeopardise the entire competitive procurement process, which, as I say, is a world first. That's why the Scottish have taken a different approach and that's why the UK Government have taken a different approach. Releasing commercially sensitive information relating to the bidders' business plans could lead, potentially, to a prejudicing of the commercial interests of those companies. However, once the service provider has been appointed, we will make further documentation, including the full tender document, public, and I will be more than happy to face full scrutiny for the future franchise that will be operating on the Wales and borders network. I can say this: Welsh Government is not the cause of the problems on the Welsh network at the moment, but Welsh Government will be the cure.
 
Last edited:

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
^^^That is indeed a most untrustworthy statement. That he feels he can get away with it is probably emblematic of the SWales political situation, described earlier in this thread.
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
Now, I can accept criticism for not publishing the full tender documents at this stage, but the reason we can't publish detailed information within the period of invitation to submit final tenders is because we could jeopardise the entire competitive procurement process, which, as I say, is a world first. That's why the Scottish have taken a different approach and that's why the UK Government have taken a different approach. Releasing commercially sensitive information relating to the bidders' business plans could lead, potentially, to a prejudicing of the commercial interests of those companies.

With my finance hat on, this genuinely doesn't make any sense at all, for the following reasons:

1. Only the companies' individual bids are commercially sensitive. The invitation to tender documents issued to all participants are not commercially sensitive.

2. If Skates' argument is that this is a truly novel innovation and that even publishing what companies X,Y,Z are preparing to bid for would be commercially sensitive for these companies, then that ignores the requirement of companies to make public any information which is significant or material to their trading and future prospects in their financial statements / quarterly accounts and investor calls. In other words - if simply taking part in this bid was commercially sensitive - that is negative or positive to their prospects- the participants would already be obliged to make certain disclosures.

See for example from Stagecoach's 2017 Annual Report: "Engaged in discussions with Department for Transport on contractual matters at Virgin Trains East Coast, including implications of Network Rail’s reprioritised infrastructure programme–£84.1m exceptional charge to provide for anticipated losses under current contract, over the next two years" etc. etc.

They have to set out future issues and disclose financial impacts when matters have commercial impacts.




This really isn't acceptable - wherever you stand on the Metro project.
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
It's not just the Metro. It's the rail service for the whole of Wales and the Borders. Nothing has been made public throughout the whole process.
It's another 15 year contract!
There are so many shades of SRA 2003 all over again it's frightening.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
I suspect the ITT documents are commercially sensitive because the WG are achieving a 'world first' by asking the three bidders to tender for significantly different things.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
Agree. The lack of transparency is truly shocking.

I have very little sympathy because its the result of a large section of the population having a blind alliagence to the Labour Party. The Lib Dems (even prior to their collaspe during the coalition) and PC have never seriously threatened Labours position. The Tories have never been strong in Wales, the 2009 European Parliamentary elections where the only time they ever beat Labour in a Wales wide election. Further to that, PC rejected a leadership candidate who said he would consider an arrangement with the Tories if one of them where the biggest party and chose a leader who promised to never do a deal with them. PC and Lib Dems will never go into government with UKIP. Therefore the only governing options are Labour, Lab-Lib, Lab-PC, Lab-Lib-PC, PC-Lib or Con-UKIP. Its extremely unlikely that the last 2 options will ever have a majority so Labour will always govern and can do almost whatever they want without consequence.
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
I suspect the ITT documents are commercially sensitive because the WG are achieving a 'world first' by asking the three bidders to tender for significantly different things.
Was there even a single ITT document? I suspect not. Therefore, the ITT document that will be released when the final winner is announced will be the ITT that was issued to the winner. I doubt we'll ever get to see the ITT that was issued to Arriva and Costain and what they were proposing.
Or there may not have been an ITT at all.

I have very little sympathy because its the result of a large section of the population having a blind alliagence to the Labour Party. The Lib Dems (even prior to their collaspe during the coalition) and PC have never seriously threatened Labours position. The Tories have never been strong in Wales, the 2009 European Parliamentary elections where the only time they ever beat Labour in a Wales wide election. Further to that, PC rejected a leadership candidate who said he would consider an arrangement with the Tories if one of them where the biggest party and chose a leader who promised to never do a deal with them. PC and Lib Dems will never go into government with UKIP. Therefore the only governing options are Labour, Lab-Lib, Lab-PC, Lab-Lib-PC, PC-Lib or Con-UKIP. Its extremely unlikely that the last 2 options will ever have a majority so Labour will always govern and can do almost whatever they want without consequence.

I agree. Andrew RT Davies should have stepped down after the 2016 Assembly election but stayed on regardless of the Welsh Tories dismal result where they lost seats.
Do not underestimate the Thatcher legacy in Wales either. Carwyn Jones actively played on it during the 2016 Assembly election campaign, saying that he would not let the Tories drag Wales back to the 1980s, he would not forget and abandon communities as the Tories did in the 1980s etc. And it works.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
Is it possible that the tender in the form it has been issued (perhaps along the lines of “what can you do for us?”) is not legal under EU law, so they are trying to hide this?

Quite apart from the light vs heavy rail debate, I agree this aspect is quite concerning.
 
Last edited:

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Is the issuance of different ITTs legal?

Update: - sorry Bletchleyite -our posts crossed.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Actually, funny you mention DOO. One aspect of a LR conversion is that there is almost no scope for industrial action regarding DOO - what a conversion legally is is a closure, and so you have redundancies (or redeployment within ATW) of HR drivers and guards and other staff, and then you employ tram drivers afresh. That may be one significant reason for selecting LR on its own, if you assume DOO has to feature in order to keep costs down.


I think I'd rather put up with some strikes in the short term, if it meant there was still a proper-capacity transport system left at the end of it
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Re Liverpool it's because the infrastructure, including, crucially, the electrification, is already there. If Merseyrail had been built 5 years later it would almost certainly have been a light rail underground like the Newcastle Metro. 10-15 years later and you could bet on the Northern Line being a tram. (The Wirral Line is a little more complex as it involves the Mersey tunnel - it's by no means certain there'd have been somewhere sensible to bring it above ground for a tram)..

All that proves is that approaches to public spending on infrastructure changed over time. It bears repeating that the only reason Manchester does not have a heavy rail metro is because central government pulled the funding plug after construction began.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
You really want stinking rattly DMUs (and the operating subsidy that goes with them)?
I can see your point if I were getting D trains instead of 150's but let's face it that is probably only happening on Marston Vale. The CAF Civitys ordered by West Midlands Trains are operating outer suburban services and seem to have been welcomed in Shrewsbury, Telford, Hereford, Worcesterr, Kidderminster and Stratford. No one in East Anglia is kicking off about the bi mode flirts and up north the only dissent is that the Sunderland to Carlisle Northern Connect service will be Class 158 operated and not by Civitys elsewhere.

The recent report on Britains congested roads and how it costs makes interesting reading. Apply the same thinking to rail passengers who don't end up making a road journey because they go by train. What would the cost in increased congestion be if they didn't? Therefore does spending money on getting people on rail work out cheaper to society as a whole than letting them clog the roads up some more?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
More meaningless waffle from Ken Skates in the Assembly this afternoon when challenged by Leanne Wood over the secrecy of the award of the franchise and TfW's refusal to publicly release the ITT documents

http://record.assembly.wales/Plenary/4905#C59183

Leanne Wood: It's baffling as to why you are conducting the franchise tendering process under such a thick veil of secrecy. Unlike the UK Government's Department for Transport and Transport Scotland, you are refusing to publish the invitation-to-tender documents that have been issued to bidders. If you did publish those documents, people in Wales—the people who are herded onto those train services every day—would have the opportunity to analyse the criteria and offer ideas as to ways in which they could be improved. The mistakes of the last rail franchise for Wales can be laid at the door of an arm's-length Westminster body.

As a frequent traveller on the Valleys lines coming down from the Rhondda, it's no surprise to me to see customer satisfaction with rail services in Wales has dropped. The conditions are often appalling. If things don't improve this time, there'll be no hiding place for you and for your Labour Cabinet colleagues. Why not publish the franchise documents, get the people involved, open yourself up to greater scrutiny to deliver a better rail franchise that works for everyone? What are you afraid of?

Ken Skates: We're afraid of nothing. The Member should recognise, though, first of all, that this a world first in terms of the process that we're following. It's not being done anywhere else in the world, it is truly innovative and it's designed to ensure that we challenge experts in the field to bring forward the best possible solutions for Welsh travellers. There is no doubt whatsoever that we have to see a step change in terms of service delivery, in terms of punctuality and in terms of satisfaction, and each of the bidders have been challenged to bring forward within an envelope all of the best solutions based on new and emerging technology, and based on the drive for greater satisfaction amongst passengers.

Now, I can accept criticism for not publishing the full tender documents at this stage, but the reason we can't publish detailed information within the period of invitation to submit final tenders is because we could jeopardise the entire competitive procurement process, which, as I say, is a world first. That's why the Scottish have taken a different approach and that's why the UK Government have taken a different approach. Releasing commercially sensitive information relating to the bidders' business plans could lead, potentially, to a prejudicing of the commercial interests of those companies. However, once the service provider has been appointed, we will make further documentation, including the full tender document, public, and I will be more than happy to face full scrutiny for the future franchise that will be operating on the Wales and borders network. I can say this: Welsh Government is not the cause of the problems on the Welsh network at the moment, but Welsh Government will be the cure.

Stretching credulity beyond limits given Welsh Labours lacklustre record in Government on economic development, the NHS and Education. Skates now expects us to believe they have developed a magic world beating process on developing public transport that the rest of the world hasn't though of....
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Have you actually looked at a map of Cardiff?
Where on earth are you going to put trams in Cardiff City Centre?
And again, what has another city got to do with Cardiff? Why are you comparing chalk with cheese?

I see you missed the point again. There was a point made about new western suburb developments, and it was said that LR would be useless because it would be stuck in traffic. My point is that modern tram systems tend to be mostly segregated from traffic out in suburbs. Especially in new developments it's easy to provide a twin track route either on the verge, central reservation or totally separated from the road. Shared running is used only where there's more value from serving streets directly rather than running faster. Oldham saw the separated tracks through Mumps redirected onto the street through the town centre, because the advantage of serving more people massively outweighed the journey time increase for cross-Oldham travel.

You could quite easily have LR trains run on the existing segregated HR alignment through Cardiff city centre and then turn off onto the streets to serve suburbs. That's the sort of flexibility that LR is absolutely great at. The same system can do everything from full street running to fully segregated lines and any combination of the two. That's simply not possible with HR. If you had both a pure tram and a heavy rail network, you wouldn't be able to join the two together with through running.

Here are photos of Cardiff city centre:> 1 = St.Mary Street with normal pedestrian volume. 2 = Westgate Street & 3 St.Mary Street - on match days.

Yes, a busy urban core. If street running happens in the centre of Cardiff, it will be designed to handle match days. Would the whole edifice come crashing down if trams were given a few metres' width of one street? It's far easier to handle predictable tram traffic than it is to handle bus, let alone taxi and car, traffic.

However in Cardiff the HR frequency is already 4 tph from Penarth, 4 tph from Barry(CASR has signaled this for 6 tph), 4 tph from Caerphilly (CASR has signaled this for 6 tph), 6 tph from Pontypridd (CASR has signaled this for 8 tph). So Light Rail wont solve the problem of low frequency as it doesn't really exist..

Quite. This morning at 8.30, I boarded a 6 car Merseyrail EMU at a Northern Line station on the fringes of Liverpool's contiguous built-up area. This was roughly 3/4 full. Trains now run 6 per hour at that time of day.

There's no magic to running an efficient and popular HR suburban service - it's just a question of putting on enough trains, with enough capacity.

Infrastructure capability is only one factor. Extra HR capacity will cost more money than it brings in ticket revenue. If there are more beneficial ways for the government to spend the necessary subsidy money, then HR enhancements won't happen. We all know there are many, many infrastructure schemes which have enabled extra capacity or new services without those services actually happening.

Few of the disadvantages you cite are inherent to HR. Merseyrail could be run a lot more cheaply if staff numbers were cut with DOO, and by reducing the number of staff doing nothing most of the time at central stations (they could be replaced by re-assigning admin staff to stations and giving them evacuation training). It doesn't take long to get underground, and any time taken in doing so is set off against the reduction in time getting across the city centre several times more quickly than an on-street option would require.

Yes, Merseyrail would be cheaper to run if DOO. However, the minimum cost will always be higher than an LR system.

How much does it cost to maintain a single Metrolink stop? It's open the elements and uses pretty much standard street furniture sitting on a pre-fab concrete box. Access for all is provided by simple little concrete ramps. What about an underground station? You have the costs of maintaining a tunnel, with the fire safety regulations (which make it mandatory to have staff on site at all time, even if passenger numbers aren't enough to justify it), the need to have lifts, the need for security and so on. To serve a city centre well, you need to have multiple stations, but for every station you add more cost.

The advantages of LR which you describe are somewhat offset by putting it into a tunnel, quite apart from the cost of construction. And that doesn't get around the almost unavoidable reduction in capacity, unless you string so many trams together that they're incapable of running on oh-so-flexible LR lines.

Once again, all this really boils down to is 'let's turn everything into light rail coz it's cheap', even though it is possible to reduce the cost differential substantially with heavy rail. There is a danger here of knowing the price of everything, and the value of nothing.

I discussed the variety of pre-metro systems built on the continent and how they've essentially failed. A tunnel is only required as a measure of last resort if there is no practical way to run enough trams along the street. Manchester may require that in future.

LR isn't better than other transport modes. All modes exist on a spectrum of capacity and demand. You have buses, then trolleybuses/BRT, then trams, then light metro, then heavy metro, then heavy rail. You pick the appropriate mode for the requirements of the city at that point in time. If passenger demand grows too much for a mode, that's when you look at building the next step up. Edinburgh is justifying building the tram down to Leith because the projections say there will be too many passengers for buses alone to cope. It is entirely possible that passenger demand can drop too, making it useful to drop down to the lower level. Plenty of cities in the UK used to have trams when urban density was at its peak, but de-urbanisation made buses a better choice.

So if it really is such a simples numbers game of the nirvana of saved costs why have the city fathers stuck with Heavy Rail in Liverpool and the West Midlands and ordered significant numbers of new HR rollling stock?if your right they would have been beating the door of DFT or financing themselves?

Now that Merseyrail has tunnels, there's not a lot of point in changing it all again. Newcastle, Liverpool and Manchester all had their metro-ification years ago, using different technology in each case. Cardiff is on the cusp of having its own, and down in the Bay they're looking at using the most up-to-date knowledge and experience when doing it.

LR is only suitable for a properly bounded network. The local services around Cardiff are separated from other rail services enough that it makes sense to do some sort of different system. In Birmingham, the WM trains have to share the same tracks as trains which run all the way from Aberdeen to Penzance. LR can't really increase frequency or reduce the costs of stations out in the suburbs because of that. Without frequency enhancements the only way to retain capacity is to keep trains long, and needing long trains puts LR well out of its comfort zone. If you have no choice but to run relatively low frequency 6 car EMUs, staffing costs become proportionately less.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
I see you missed the point again. There was a point made about new western suburb developments, and it was said that LR would be useless because it would be stuck in traffic. My point is that modern tram systems tend to be mostly segregated from traffic out in suburbs. Especially in new developments it's easy to provide a twin track route either on the verge, central reservation or totally separated from the road. Shared running is used only where there's more value from serving streets directly rather than running faster. Oldham saw the separated tracks through Mumps redirected onto the street through the town centre, because the advantage of serving more people massively outweighed the journey time increase for cross-Oldham travel.

You could quite easily have LR trains run on the existing segregated HR alignment through Cardiff city centre and then turn off onto the streets to serve suburbs. That's the sort of flexibility that LR is absolutely great at. The same system can do everything from full street running to fully segregated lines and any combination of the two. That's simply not possible with HR. If you had both a pure tram and a heavy rail network, you wouldn't be able to join the two together with through running.



Yes, a busy urban core. If street running happens in the centre of Cardiff, it will be designed to handle match days. Would the whole edifice come crashing down if trams were given a few metres' width of one street? It's far easier to handle predictable tram traffic than it is to handle bus, let alone taxi and car, traffic.





Infrastructure capability is only one factor. Extra HR capacity will cost more money than it brings in ticket revenue. If there are more beneficial ways for the government to spend the necessary subsidy money, then HR enhancements won't happen. We all know there are many, many infrastructure schemes which have enabled extra capacity or new services without those services actually happening.



Yes, Merseyrail would be cheaper to run if DOO. However, the minimum cost will always be higher than an LR system.

How much does it cost to maintain a single Metrolink stop? It's open the elements and uses pretty much standard street furniture sitting on a pre-fab concrete box. Access for all is provided by simple little concrete ramps. What about an underground station? You have the costs of maintaining a tunnel, with the fire safety regulations (which make it mandatory to have staff on site at all time, even if passenger numbers aren't enough to justify it), the need to have lifts, the need for security and so on. To serve a city centre well, you need to have multiple stations, but for every station you add more cost.



I discussed the variety of pre-metro systems built on the continent and how they've essentially failed. A tunnel is only required as a measure of last resort if there is no practical way to run enough trams along the street. Manchester may require that in future.

LR isn't better than other transport modes. All modes exist on a spectrum of capacity and demand. You have buses, then trolleybuses/BRT, then trams, then light metro, then heavy metro, then heavy rail. You pick the appropriate mode for the requirements of the city at that point in time. If passenger demand grows too much for a mode, that's when you look at building the next step up. Edinburgh is justifying building the tram down to Leith because the projections say there will be too many passengers for buses alone to cope. It is entirely possible that passenger demand can drop too, making it useful to drop down to the lower level. Plenty of cities in the UK used to have trams when urban density was at its peak, but de-urbanisation made buses a better choice.



Now that Merseyrail has tunnels, there's not a lot of point in changing it all again. Newcastle, Liverpool and Manchester all had their metro-ification years ago, using different technology in each case. Cardiff is on the cusp of having its own, and down in the Bay they're looking at using the most up-to-date knowledge and experience when doing it.

LR is only suitable for a properly bounded network. The local services around Cardiff are separated from other rail services enough that it makes sense to do some sort of different system. In Birmingham, the WM trains have to share the same tracks as trains which run all the way from Aberdeen to Penzance. LR can't really increase frequency or reduce the costs of stations out in the suburbs because of that. Without frequency enhancements the only way to retain capacity is to keep trains long, and needing long trains puts LR well out of its comfort zone. If you have no choice but to run relatively low frequency 6 car EMUs, staffing costs become proportionately less.

The Snow Hill services do not share tracks with long distance cross country trains you can segregate Chiltern and terminate those services in Moor St.
You can find plenty of examples of light rail systems in tunnels in America and Europe. Neither of these arguments you put forward ( the presence of long distance trains/ tunnels ) explain why Light Rail was not adopted in Liverpool and part of Birmingham as they don't actually apply.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
The Snow Hill services do not share tracks with long distance cross country trains you can segregate Chiltern and terminate those services in Moor St.

CrossCountry have to be able to run along the suburban tracks in Birmingham, because these suburban tracks tend to lead somewhere well outside of Birmingham itself. Even with a LR bypass of New Street, capacity would be limited by the need for regional and InterCity trains to use the same tracks. Therefore, the city's LR system is a currently a pure tramway, largely using a trackbed which was surplus to requirements.

In Cardiff, the local services run on tracks which are largely only useful for local services. There's no value in making the Valley lines suitable for regional or InterCity trains, because there's never a reason for them to head up there. The only line you could ever justify keeping cleared for diverted services would the Vale of Glamorgan, and that can fairly easily be done with tram-train technology.

It's a similar story for the Tyne and Wear Metro, and for Metrolink. Yes, the Altrincham line was used by services to Chester. The diversion via Stockport has lengthened the journey a bit, but when the end result is better overall this is a price worth paying.

You can find plenty of examples of light rail systems in tunnels in America and Europe. Neither of these arguments you put forward ( the presence of long distance trains/ tunnels ) explain why Light Rail was not adopted in Liverpool and part of Birmingham as they don't actually apply.

Light rail wasn't adopted in Liverpool because 1. a big chunk of the tunnelled heavy rail metro infrastructure was already in existence and 2. because light rail wasn't as technologically developed. When did Merseyrail happen? 1977, only 15 years after the final Gen 1 tramway closed in Glasgow. At that time, people hadn't properly grasped the flaw in the pre-metro idea as cars were still largely in vogue. Lessons were learned with time and these lessons were applied in turn to Newcastle and to Manchester.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
The Snow Hill services do not share tracks with long distance cross country trains you can segregate Chiltern and terminate those services in Moor St.

By "cross country" he actually does mean CrossCountry, not Chiltern...check it again.

You can find plenty of examples of light rail systems in tunnels in America and Europe. Neither of these arguments you put forward ( the presence of long distance trains/ tunnels ) explain why Light Rail was not adopted in Liverpool and part of Birmingham as they don't actually apply.

I *suspect* in Liverpool the existing third rail electrification system and tunnels were a fairly big part of the reason. Unlike the Bury line this was not non-standard (being the same system as used all over the Southern etc). Altrincham was of course 25kV, but having decided to convert Bury that provided "donor" OHLE equipment, cutting costs further.

The Link (Northern Line) could have fairly easily been done as a tramway, running on street out of the front of Exchange (which would have a simple island platform tramstop), then probably via Stanley Street and Lord Street down a ramp onto the old formation out of Central. I think that (as a former local who is very familiar with the Northern Line :) ) would probably to me be just as acceptable as the present Northern Line, and would have a certain set of advantages too. But back then the mentality was very much "roads are for cars", even to the point that the reason for the elevated Moorfields entrance was that there was a plan to build a network of elevated walkways rather like those in some older New Towns, or like the partial project around Manchester University, all of which has now been removed.

The Loop is a bit different, and because it requires access to the deep level tunnel under the Mersey may have been a bit difficult to do as a tramway. Of course you could have just carried on running heavy rail into Central low level (which would have been unaffected) - but then how would you serve Lime St?
 
Last edited:

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
NotATrainspott,
The more you answer the more it confirms that you have not looked at a map of Cardiff, or read the comments of many people on here about it's physical and raliway geography and the problems that brings with any light rail proposal.
And you certainly have no idea about the crowd problems and the number of days that affects the City Centre.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
By "cross country" he actually does mean CrossCountry, not Chiltern...check it again.



I *suspect* in Liverpool the existing third rail electrification system and tunnels were a fairly big part of the reason. Unlike the Bury line this was not non-standard (being the same system as used all over the Southern etc). Altrincham was of course 25kV, but having decided to convert Bury that provided "donor" OHLE equipment, cutting costs further.

The Link (Northern Line) could have fairly easily been done as a tramway, running on street out of the front of Exchange (which would have a simple island platform tramstop), then probably via Stanley Street and Lord Street down a ramp onto the old formation out of Central. I think that (as a former local who is very familiar with the Northern Line :) ) would probably to me be just as acceptable as the present Northern Line, and would have a certain set of advantages too. But back then the mentality was very much "roads are for cars", even to the point that the reason for the elevated Moorfields entrance was that there was a plan to build a network of elevated walkways rather like those in some older New Towns, or like the partial project around Manchester University, all of which has now been removed.

The Loop is a bit different, and because it requires access to the deep level tunnel under the Mersey may have been a bit difficult to do as a tramway. Of course you could have just carried on running heavy rail into Central low level (which would have been unaffected) - but then how would you serve Lime St?


STANLEY STREET???? Have you taken leave of your senses? There is barely enough space for cars to get down Stanley Street when traffics parked on either side. And after that? Round a series of extraordinarily tight bends, straight up the middle of Liverpool's (not particularly wide) main shopping street (have a look at it from before it was pedestrianised), then down the 'old ramp' into Central - do you mean the pedestrian ramp, c 15 ft wide, which leads off Bold Street at 90 degrees????

To justify your case, you have proposed a route which not even the 'Baby Grands' of the Corporation tramways could have physically managed. I think Liverpool's done rather better from a tunneled HR line.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Yes, Merseyrail would be cheaper to run if DOO. However, the minimum cost will always be higher than an LR system.

How much does it cost to maintain a single Metrolink stop? It's open the elements and uses pretty much standard street furniture sitting on a pre-fab concrete box. Access for all is provided by simple little concrete ramps. What about an underground station? You have the costs of maintaining a tunnel, with the fire safety regulations (which make it mandatory to have staff on site at all time, even if passenger numbers aren't enough to justify it), the need to have lifts, the need for security and so on. To serve a city centre well, you need to have multiple stations, but for every station you add more cost.


There's a point where frugality tips over into austerity fetishism, if not downright masochism.

You do realise that it is possible to have the concrete bunkers of which you sound so fond on an HR system? Perhaps the waiting facilities at Mersyeside stations - which I'd suggest are the least railway users in a civilised country should be entitled to expect - might be one of the reasons why so many more travel by heavy rail, compared to in TfGMland.

Also, isn't it a teensy bit inconsistent to be arguing that the cost of maintaining underground stations is a disadvantage of HR, before admitting down the page that Manchester will need a cross-city tunnel soon? How do you expect passengers to get to and from that? Via the sewers, which by the sounds of things is the sort of miserable, but cheap, solution you'd enjoy?


I discussed the variety of pre-metro systems built on the continent and how they've essentially failed. A tunnel is only required as a measure of last resort if there is no practical way to run enough trams along the street. Manchester may require that in future.

Why do you keep raising pre-metro systems? As they're light rail based, they should be right up your low cost thoroughfare. Britain doesn't have any pre-metro systems, but then few countries that I am aware of outside Britain have replaced heavy rail lines with LR only routes.


LR isn't better than other transport modes. All modes exist on a spectrum of capacity and demand. You have buses, then trolleybuses/BRT, then trams, then light metro, then heavy metro, then heavy rail. You pick the appropriate mode for the requirements of the city at that point in time. If passenger demand grows too much for a mode, that's when you look at building the next step up. Edinburgh is justifying building the tram down to Leith because the projections say there will be too many passengers for buses alone to cope. It is entirely possible that passenger demand can drop too, making it useful to drop down to the lower level. Plenty of cities in the UK used to have trams when urban density was at its peak, but de-urbanisation made buses a better choice.
7
I am deeply sceptical of anyone who suggests that buses are a better mode of transport than any other, rather than just a cheaper one. Are you now arguing that it was a good thing that almost every British town and city dismantled their street tramways networks? Seems like the main basis for every one of your arguments is cheapness, although I am perhaps being a bit unfair when we consider how much the Rotherham tram-trains fiasco is costing.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
CrossCountry have to be able to run along the suburban tracks in Birmingham, because these suburban tracks tend to lead somewhere well outside of Birmingham itself. Even with a LR bypass of New Street, capacity would be limited by the need for regional and InterCity trains to use the same tracks. Therefore, the city's LR system is a currently a pure tramway, largely using a trackbed which was surplus to requirements.

You certainly are struggling with the rail geography of Birmingham. The electrified cross city line uses New St and shares its tracks south of New St with Long Distance Cross Country services however north of it to Lichfield and Walsall/Rugely they don't share with anything else.
The Snow Hill lines refer to the ex Great Western lines from Kidderminster /Stourbridge Junction to Leamington Spa/Stratford Upon Avon. Chiltern Railways run to Birmingham from Marylebone via Leamington Spa and Solihull. You could segregate those services from Leamington Spa into central Birmingham quite well as they run in on a ex 4 track formation and tie the converted local HR lines with the current Midland Metro.

If converting to Light Rail was such a wonderful idea with proven benefits then why did they not do it? Why have the stuck with new Heavy Rail rolling stock? Clearly the gospel of Notatrainspott has yet to penetrate the West Midlands. The "surplus to requirement trackbed" the Midland Metro is on is now needed as the Heavy rail corridor from Wolverhampton to Birmingham has reached saturation point and part of the reason were now building HS2. Light Rail got chosen to reopen the local service to Wolverhampton from Snow Hill because at the time in the mid 80's the Ministry of Roads was still hectoring BR to put forward lines for closure and bustitution so a Light Rail system not involving BR was seen as way of side stepping central Government hostility.

Likewise on Merseyside theirs loads of Light Rail systems with underground sections across the world. Rip up that pesky non standard 3rd rail and put the "cheap" wires up and run cheap Light Rail vehicles instead of 3rd rail vehicles is surely a better solution? Why did the city fathers on Merseyside not lap this up?
 