• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

South Wales 'Metro' updates

ExeBlueBird27

Member
Joined
16 Sep 2026
Messages
6
Location
Exeter
Hirwaun was always on the table as the first (of hopefully many over the course of time) real extension of rail services. Hope Plaid can make this happen, in a world of diminiahing oil resources and sky high diesel prices we need these projects to come to fruition.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,293
Location
West Wiltshire
The extension to Hirwaun would be a quick win and help justify the use of Tram-trains. The proposal does not include a station where the line goes under the A4069 - which I would have thought was an obvious place for a station with parking being the nearest point to outlying places such as Penderyn. Ideally, such a station could be served by a bus link to Tower zip line and in the other direction - Penderyn - both for the locals and tourists to the distillery and footpath to Scwd-Yr-Eira Waterfall. (This would also help even out the flow of passengers with commuters heading south to Cardiff & tourists heading north).

The consultation appears to include 2 stations : Hirwaun and Llwydcoed

But I agree, shame there isn't a park and ride by Gellitaw Farm where the line crosses under A465 Heads of the Valleys Road or where it crosses A4069

 
Last edited:

Farigiraf

Established Member
Joined
23 Jul 2023
Messages
1,242
Location
Bridge on the River Cam
A not particularly important question that's nonetheless been on my mind: The Hirwaun extension is being designed as a tramway (to cut costs) and will be served by tram-trains. However, the rest of the route is a National Rail service run on heavy rail through proper NR stations. Will Hirwaun and Llwydcoed stations be National Rail stations or not?

Either way it'd be a bit strange. You'd either have 2 tram stops served by trams that are officially NR stations (while Rotherham Parkgate and Magna aren't) or you'd have a National Rail service that stops at two tram stops at the end of the route, which would be a bit of a nightmare for the rail ticketing system and Darwin to handle.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,149
A not particularly important question that's nonetheless been on my mind: The Hirwaun extension is being designed as a tramway (to cut costs) and will be served by tram-trains. However, the rest of the route is a National Rail service run on heavy rail through proper NR stations. Will Hirwaun and Llwydcoed stations be National Rail stations or not?

Either way it'd be a bit strange. You'd either have 2 tram stops served by trams that are officially NR stations (while Rotherham Parkgate and Magna aren't) or you'd have a National Rail service that stops at two tram stops at the end of the route, which would be a bit of a nightmare for the rail ticketing system and Darwin to handle.
I would have thought the legal definition of how the railway is run will have absolutely no impact on how the railway is marketed (which is effectively what National Rail is).

So I would expect the two new stations to be treated in exactly the same way as all the other valley line stations.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,041
Either way it'd be a bit strange. You'd either have 2 tram stops served by trams that are officially NR stations (while Rotherham Parkgate and Magna aren't)

I don't think you need to wait for the Hirwaun extension to happen. Unless I've misunderstood or plans have changed, Cardiff Bay and Butetown station will in due course be on a line operating under line of sight operation, tramway style. Of course the stations will still have heavy rail high platforms, though I think Cardiff Bay will have a foot crossing that wouldn't be appropriate for a heavy rail line.

Personally I don't see it as being all that strange.
 

Akela

Member
Joined
20 Jun 2021
Messages
51
Location
Wales
A not particularly important question that's nonetheless been on my mind: The Hirwaun extension is being designed as a tramway (to cut costs) and will be served by tram-trains. However, the rest of the route is a National Rail service run on heavy rail through proper NR stations. Will Hirwaun and Llwydcoed stations be National Rail stations or not?

Either way it'd be a bit strange. You'd either have 2 tram stops served by trams that are officially NR stations (while Rotherham Parkgate and Magna aren't) or you'd have a National Rail service that stops at two tram stops at the end of the route, which would be a bit of a nightmare for the rail ticketing system and Darwin to handle.

The station infrastructure being built to light rail standards doesn’t really impact the way they’ll appear in the ticketing system. I don’t see why they wouldn’t be “National Rail” stations and appear as a destination in ticket machines or apps etc.

Important to note however they won’t be Network Rail stations, as they’re on the CVL network which is owned and operated by TFW directly, a bit like how the Elizabeth Line core section is owned by TFL.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,020
The consultation appears to include 2 stations : Hirwaun and Llwydcoed

But I agree, shame there isn't a park and ride by Gellitaw Farm where the line crosses under A465 Heads of the Valleys Road or where it crosses A4069

I suspect that the additional station that's mentioned for the Tower Colliery site might include a large car park as part of the redevelopment.

== Doublepost prevention - post automatically merged: ==

The wording of the consultation document (attached below for future reference as they often disappear) says:

  • Up to four trains per hour between Aberdare and Llwydcoed
  • Up to two trains per hour between Hirwaun and Cardiff
  • Direct Metro connections between Hirwaun, Aberdare, Pontypridd and Cardiff
That sounds like only half of the trains arriving from Aberdare continue to Hirwaun, with the rest terminating at Llwydcoed?
 

Attachments

  • aberdare_hirwaun.pdf
    643.2 KB · Views: 20
Last edited:

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,633
Not sure if this fits here, or the Class 398 thread (as the timetable change is dependent on the rollout of the new trains) but it looks like RTT has now been update pushing back the date that the Treherbert line will get 4tph (with the new two to Cardiff Bay). This initially was in RTT for the middle of January but now looks to be from the 5th Feb instead. I wouldn't be surprised to see that get pushed back again tbh.
 

Top