The Merthyr branch has a loop between Troedyrhiw and Merthyr Vale too - that was the first reinstated one since the 70s.Merthyr Branch. From just north of Pentrebach (23 miles 11 chains) to just south of Merthyr (24.37),
together with a loop at Quakers Yard.
Aberdare Branch: Mountain Ash loop now extends to just south of Fernhill (20.71),
and doubled from just north of Cwmbach to Aberdare
Rhondda Branch: South of Ynyswen (22.40) as far as Treherbert.
Ystrad Rhondda loop extended north to just south of Ton Pentre (20.65)
North of Porth, double track now extended to just beyond Dinas Rhondda (17.47)
Rhymney Branch: Tir Phil loop extended northwards to 21.36
Cardiff Bay Doubled throughout (work ongoing)
All measurements are from TrackMaps 7th edition.
Agree, but that didn't get mentioned, as the request was for changes since 2019.The Merthyr branch has a loop between Troedyrhiw and Merthyr Vale too - that was the first reinstated one since the 70s.
The only way this will work is if they turn back any train running away from Cardiff more than a few minutes late at the end of double track, unless the following one is also late in which case whichever one continues will end up working a later diagram. This allows it to return to central Cardiff on time and avoids a situation where each train delays the next one (and probably trains on other routes too) right up until the end of service.Agree, but that didn't get mentioned, as the request was for changes since 2019.
As an aside, I can't help wondering how robust the timetable will be once 4tph is introduced up each branch with the remaining sections of single line.
James Price said in one of his interviews that with any extra funding one of the main priorities after getting 4tph on Coryton and City lines would be to add extra double tracking for more resilience. I think it's been incredibly value engineered using the simulations, assuming the 398s work as advertised I think in normal service it'll be fine but if there's any external disruption it'll probably result in a lot of turning back.Agree, but that didn't get mentioned, as the request was for changes since 2019.
As an aside, I can't help wondering how robust the timetable will be once 4tph is introduced up each branch with the remaining sections of single line.
This obviously isn't ideal for passengers but the next train should be there 15min after the original timings so the extra delay isn't huge...
More passing loops probably wouldn't help much, because as soon as things are out of pattern on a single line they no longer meet at the passing loops. On a network combining single lines with a very intensively worked central section, the priority to keep the service running is to ensure everything comes into the central area on time. Like I said above, I agree this isn't ideal but I'm trying to explain the consequences of what they now have.But a passenger might have to wait 29 minutes for a train on what has been heavily promoted as a "turn up and go" service.
Having the bare minimum number of passing loops required to run a 4tph service is asking for trouble.
Unless the number of turn shorts is really huge, I'd say something that turns up every 15min but sometimes doesn't is better than something that turns up every 30min but sometimes (less often) still doesn't.Perhaps a lower than promised frequency should be implemented initially - in favour of network resilience. 3tph to each TAM terminus perhaps, though it doesn't have to be symmetrical. Perhaps one terminus deserves/requires the promised 4tph immediately, while another could put up with 2tph in the short-term, though in the absence of analysis, I cannot determine which has a higher demand.
More passing loops probably wouldn't help much, because as soon as things are out of pattern on a single line they no longer meet at the passing loops. On a network combining single lines with a very intensively worked central section, the priority to keep the service running is to ensure everything comes into the central area on time. Like I said above, I agree this isn't ideal but I'm trying to explain the consequences of what they now have.
If you double the passing loops then you can run trains at half the headway, so 7.5min. So a train going away from Cardiff, running more than a small amount late, will have to wait until it is 7.5min late assuming trains towards Cardiff get priority. Unless it has enough turnaround time to depart close to right time, it will still be late coming back, probably causing the next train away from Cardiff also to be 7.5min late on arrival. With the frequency needed through Queen Street a train even a couple of minutes behind will probably delay at least one other train there.I understand your point, but the more passing loops there are, the easier it is to get back on track after delays (which, on the TfW network, are inevitable). Ideally, of course, for a 4tph service, the entire line would be double-tracked, but I doubt that there is the will for that, never mind the money.
Rhymney Branch: Tir Phil loop extended northwards to 21.36
The Tirphil passing loop extension hasn't happened. Likewise the additional platform at Rhymney so at the moment no chance of 4tph.Back on topic, I see mention of the Tirphill passing loop extension, did that ever actually happen I seem to remember that the work at the Northern end of the Rhymney line was planned to be the last bit of works done but obviously the timeline are fully out now.
Thank you very much and thanks also to everyone else for the additional info/discussion.Merthyr Branch. From just north of Pentrebach (23 miles 11 chains) to just south of Merthyr (24.37),
together with a loop at Quakers Yard.
Aberdare Branch: Mountain Ash loop now extends to just south of Fernhill (20.71),
and doubled from just north of Cwmbach to Aberdare
Rhondda Branch: South of Ynyswen (22.40) as far as Treherbert.
Ystrad Rhondda loop extended north to just south of Ton Pentre (20.65)
North of Porth, double track now extended to just beyond Dinas Rhondda (17.47)
Rhymney Branch: Tir Phil loop extended northwards to 21.36
Cardiff Bay Doubled throughout (work ongoing)
All measurements are from TrackMaps 7th edition.
Although does Bargoed - Rhymney warrant 4tph all day? The only useful change would be for those intermediate stations to get 2tph rather than 1tph with the other train speeding through without stoppingThe Tirphil passing loop extension hasn't happened. Likewise the additional platform at Rhymney so at the moment no chance of 4tph.
Yes?Although does Bargoed - Rhymney warrant 4tph all day?