• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Should speed through mainline stations be slower?

Status
Not open for further replies.

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
Did trains used to slow down to around 60mph when passing through Milton Keynes 5-10 years ago? I'm sure I can remember the train greatly reducing speed and trundling through there before speeding up again, although not in recent years.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Did trains used to slow down to around 60mph when passing through Milton Keynes 5-10 years ago? I'm sure I can remember the train greatly reducing speed and trundling through there before speeding up again, although not in recent years.

I recall there was a 90mph Temporary Speed Restriction on the Down Fast Line immediately north of the station that lasted for a while between 2010 and 2012.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,161
I’d say no. Places like Stevenage have seen trains pass at 125 mph for many years, and it isn’t really an issue. It isn’t worth the time and capacity penalty.
Quite. The island platform layout at Stevenage mean every passenger using the station uses a platform where trains pass at 125mph.

Did trains used to slow down to around 60mph when passing through Milton Keynes 5-10 years ago? I'm sure I can remember the train greatly reducing speed and trundling through there before speeding up again, although not in recent years.
No they didn't. If you slow trains down at Milton Keynes are you going to do the same at Leighton Buzzard, Cheddington, Hemel Hempstead etc. I'm sorry but it's just not feasible.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,686
Location
Northampton
Did trains used to slow down to around 60mph when passing through Milton Keynes 5-10 years ago? I'm sure I can remember the train greatly reducing speed and trundling through there before speeding up again, although not in recent years.
I still don't see why slowing EVERY train down is a better solution (or any solution at all) to this problem, which is so easily solved by waiting in the coffee shop, where there is a bar and seats!
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
I still don't see why slowing EVERY train down is a better solution (or any solution at all) to this problem, which is so easily solved by waiting in the coffee shop, where there is a bar and seats!

Yes. A more practical solution is to minimise the number of passengers entering the platform more than a few minutes before the train is due. Which most passengers don't do anyway.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,999
Did trains used to slow down to around 60mph when passing through Milton Keynes 5-10 years ago? I'm sure I can remember the train greatly reducing speed and trundling through there before speeding up again, although not in recent years.

If that happened, it would have been due to temporary speed restrictions, possibly connected with the remodelling 15 or so years ago.

Also it is possible that fast trains run more slowly through due to following one that has just stopped, and it is therefore on restrictive aspects.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,729
Location
Hope Valley
Quite. The island platform layout at Stevenage mean every passenger using the station uses a platform where trains pass at 125mph.
No longer the case with the 'bay' platform for the Hertford North trains.

This does, of course, illustrate the issue that cross-platform interchange creates unless all trains on both platforms (disregarding freight) stop.

At Surbiton in the Up direction there is usually a 'warden' on duty, at least at busy times of day, to discourage people from standing too close to the Up Fast.
 

CW2

Established Member
Joined
7 May 2020
Messages
2,233
Location
Crewe
I recall there was a 90mph Temporary Speed Restriction on the Down Fast Line immediately north of the station that lasted for a while between 2010 and 2012.
When the MK remodelling was completed in January 2010 the Down Fast linespeed was 125 mph. After a few months part of the newly laid track on the Down Fast just north of the station settled a bit, causing a bumpy ride. Identitying and resolving the issue took many months, hence there was the 90mph TSR mentioned. Once the problem had been sorted, the linespeed was lifted back to 125 EPS as designed.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
When the MK remodelling was completed in January 2010 the Down Fast linespeed was 125 mph. After a few months part of the newly laid track on the Down Fast just north of the station settled a bit, causing a bumpy ride. Identitying and resolving the issue took many months, hence there was the 90mph TSR mentioned. Once the problem had been sorted, the linespeed was lifted back to 125 EPS as designed.

Aha, thanks. I wondered why it was there for so long!
 

ic31420

Member
Joined
23 Aug 2017
Messages
404
Location
United Kingdom
Being hit by a train at 100mph is pretty much going to have the same effect has being hit by a train at 125mph or indeed 50mph.

Probably easier more effective and more cost effective to limit access to the platform to only when a stopping train is approaching.

That is if we are not solving a problem that doesn't exist.

One of my earliest childhood memories is sitting on the platform at Newport when a double or triple headed 37 hauled train came through. It rather startled me as a kiddie.
 
Joined
24 Sep 2017
Messages
315
I believe they already do this at Reading. Isn't the alignment capable of 125, but the speed is 95 through the platforms?
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,370
Are they flat out at Slough? I seem to recall a rather narrow platform once on a visit.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,161
Probably easier more effective and more cost effective to limit access to the platform to only when a stopping train is approaching.
Good luck trying to implement that at somewhere like Stevenage. It's simply not possible.

I believe they already do this at Reading. Isn't the alignment capable of 125, but the speed is 95 through the platforms?
Pretty much everything calls at Reading so it's probably not the biggest issue.

Are they flat out at Slough? I seem to recall a rather narrow platform once on a visit.
They were certainly going through at a fair wack when I was there a few weeks ago, not sure if it's 125mph there but it can't be far off if it isn't.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,900
They were certainly going through at a fair wack when I was there a few weeks ago, not sure if it's 125mph there but it can't be far off if it isn't.
Line speed through Slough on both the up and down main is 125mph. Reading platform 9 (down main) is 80mph and platform 10 (up main) is 85, with both having a HST 95 limit as well.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Line speed through Slough on both the up and down main is 125mph. Reading platform 9 (down main) is 80mph and platform 10 (up main) is 85, with both having a HST 95 limit as well.

At Reading, it may have changed, but the limitation on speed is due to the signalling which - in theory - ETCS will resolve. The alignment is fit for 125mph.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,357
They can always stand on platform 3 or 5. I've never had a problem with a pendo - if anything the freight on the Slows is more unnerving.
Yes, there seems to be much more air turbulence when liner trains pass through stations than that caused by any Pendolino (or Voyager).
 

miklcct

Established Member
Joined
2 May 2021
Messages
5,017
Location
Cricklewood
It seems that trains in the UK do not need to slow down when passing a station non-stop. In Hong Kong, I have heard that non-stop trains have to reduce the speed to at most 70 km/h when passing a station without platform gate non-stop as a safety measure to prevent people waiting on the platform being sucked onto the train passing at high speed due to difference in pressure.

Is it true that a train passing through at high speed may cause danger for people waiting at the platform if there is no platform gate, especially when the platform is crowded?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,320
No, there is no requirement to do this on Network Rail, trains conform to the stated line speed, up to and including 125 mph with appropriate warning notices, yellow lines etc. Above 125 mph then access to platforms must be prevented.
 

Jimini

Established Member
Joined
8 Oct 2006
Messages
2,182
Location
Reading
The down main at Slough is probably one of the best examples of proximity of platform to gates / queuing passengers etc.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,350
The down main at Slough is probably one of the best examples of proximity of platform to gates / queuing passengers etc.
Or one of the worst examples ... I've used it regularly in the morning peak when a train on the relief lines and the Windsor shuttle arrive together - and the worst was one time when a revenue block was being done there as well. It's actually got worse - an oncoming Down HST at 125mph at full chat gave a useful few seconds notice of its passing. Not now it's all electric. A few drivers sound horn there if seeing the crowd, but others don't.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,599
Location
Yorkshire
Is it true that a train passing through at high speed may cause danger for people waiting at the platform if there is no platform gate, especially when the platform is crowded?
If people are not behind the yellow line, this could indeed be dangerous.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,161
The platforms at Stevenage are relatively narrow and it's not unusual for a GTR class 700 to tip out a load of passegers as a LNER speeds past on the other side of the platform at 125mph. It's worked ok for years and there really isn't a reason to change it.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,068
Location
St Albans
Or one of the worst examples ... I've used it regularly in the morning peak when a train on the relief lines and the Windsor shuttle arrive together - and the worst was one time when a revenue block was being done there as well. It's actually got worse - an oncoming Down HST at 125mph at full chat gave a useful few seconds notice of its passing. Not now it's all electric. A few drivers sound horn there if seeing the crowd, but others don't.
There was probably more of an aggregate health risk with the 'brow mist' that the HSTs often created through stations. <D
Thankfully, with the 8xx's now running instead, that problem has gone.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,339
Location
Reading
I believe they already do this at Reading. Isn't the alignment capable of 125, but the speed is 95 through the platforms?
According to a Network Rail person present at the exhibitions of the planned works before the rebuild began the limiting factor for the line speed is the curve on the Mains to the west of the bridge over the Kennet which makes 125mph impractical.

This is the curve which shifts the Mains, which were built south of what are now the Relief lines when the route was widened in the 19th century, across to the pre-rebuild Relief line alignment through the station. Platform 8 - the current Down Main Platform Loop - was Platform 5, the Up Main Platform Loop and Platform 9, the current Down Main was, pre-rebuild, Platform 8 - the Down Relief.

The current signalling arrangements may also have a rôle to play in the 95mph limit for the Mains - but that is supposition on my part.
 

rower40

Member
Joined
1 Jan 2008
Messages
584
No-one suggested platform-edge barriers/doors yet? (After all - when did you last look down a lift-shaft? And trains are just impressively-complicated sideways lifts.)

That would prevent accidental and deliberate interactions between passengers and non-stop trains. All we have to do now is solve the engineering issues of unpredictable train door spacing and positioning.
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
3,003
Location
Cambridge
No-one suggested platform-edge barriers/doors yet? (After all - when did you last look down a lift-shaft? And trains are just impressively-complicated sideways lifts.)

That would prevent accidental and deliberate interactions between passengers and non-stop trains. All we have to do now is solve the engineering issues of unpredictable train door spacing and positioning.
I understand they are commonly used in parts of Asia, such as Hong Kong.
 
Status
Not open for further replies.

Top