Clansman
Established Member
Concourse Level Plan
Only a few extra metres would be possible, but not worthwhile as it wouldn't be enough for 5 carriages. The stairs down to the low level station are in the way of any further extensions.
Cheers for the link, not seen the official plans until now.
I guess in an ideal world you could shut Dundas Street and demolish the adjacent buildings to the main shed at Queen Street which make up the staff bothy, ticket halls, and low-level entrances; and run platform 1 all the way through to the concourse, with a newly built concourse and stairs for the low level platforms and subway where Dundas Street currently is. But obviously if this was possible then that would be happening.
Platform 1's just a major pain in the backside in terms of any future platform plans for Queen Street when it comes to hunting down capacity.
Last edited: