It is the key part of the revised EGIP programme which entirely centres on delivering 4tph of 8 X 23m coaches per hour.
This requires more than one platform to be available at Queen Street for 8x23m coaches.
In turn however it enabled the Greenhill remodelling, Croy turnback and Dalmeny Chord to be dropped, saving hundreds of millions of pounds for a similar capacity level.
And that’s a great loss however, especially the Dalmeny chord.
Very short term thinking.
Well Yes and No. The Dalmeny Chord is still needed and no doubt will happen in CP6 but the previous version of EGIP would have spent an awfully large amount of money to run 2tph extra between the cities and not added much if any capacity to intermediate stations which is where much of the growth has been.
In my view running longer trains should be the plan across Scotland to increase capacity before we start running more services, especially once the frequency is around 4tph anyway.
I’d like to see 8 x 23m EMUs as the standard expected across the central belt with platforms lengthened to reflect this. For me one of the weaknesses of the current EGIP is that platforms have not been lengthened at Bishopbriggs and Lenzie which feels like a mistake. SDO is still possible but on the busier sections of route better to have full length platforms where they are relatively cheap to deliver.
Well Yes and No. The Dalmeny Chord is still needed and no doubt will happen in CP6 but the previous version of EGIP would have spent an awfully large amount of money to run 2tph extra between the cities and not added much if any capacity to intermediate stations which is where much of the growth has been.
In my view running longer trains should be the plan across Scotland to increase capacity before we start running more services, especially once the frequency is around 4tph anyway.
I’d like to see 8 x 23m EMUs as the standard expected across the central belt with platforms lengthened to reflect this. For me one of the weaknesses of the current EGIP is that platforms have not been lengthened at Bishopbriggs and Lenzie which feels like a mistake. SDO is still possible but on the busier sections of route better to have full length platforms where they are relatively cheap to deliver.
I just went down to Queen Street and saw a pair of 385s (one four car, one three car) arrive on a press jolly from Edinburgh. First time I've seen 385s up close...and the conclusion I'm forced to jump to is that they're spectacularly ugly.
Not only is the front now asymmetrical (number higher on one side, two different types of window fitted), the roof-mounted and underframe-mounted equipment looks incredibly untidy and ungainly compared with the neat boxing-in on many other designs.
I'll probably get used to it in time, but the whole thing just looks awkward and uneven to me.
I hadn't appreciated that only the driver's side screen is being replaced.I just went down to Queen Street and saw a pair of 385s (one four car, one three car) arrive on a press jolly from Edinburgh. First time I've seen 385s up close...and the conclusion I'm forced to jump to is that they're spectacularly ugly.
Not only is the front now asymmetrical (number higher on one side, two different types of window fitted), the roof-mounted and underframe-mounted equipment looks incredibly untidy and ungainly compared with the neat boxing-in on many other designs.
I'll probably get used to it in time, but the whole thing just looks awkward and uneven to me.
I hadn't appreciated that only the driver's side screen is being replaced.
Its complicated.
Basically the Developer has to pay for the station before they can build beyond a certain number of the new houses. They haven't yet reached that number (Somewhere around 1000 houses from memory).
The new secondary school also has to be agreed before they can build beyond a certain number of houses (around 550 and almost reached now). This number is less the number for the station so the school has to be agreed first.
But the council will only agree to borrow money to build a school if they are sure the developer will pay that money back. So the council need to be sure that the station (and the motorway junction) are fully funded or else they might pay to build a school but then the developer has to stop building houses (and thus paying back the money the council has borrowed for the new school) because there is no money to pay for the station (or the motorway junction).
There are also City Deal loans and Scottish Government lending guarantees in there to make it more complicated.
The key thing to realise is that basically the funding has to be in place for all 6 big schemes - 2 secondary schools, 1 primary school, new station, link road, motorway junction before any one of them can go ahead as no one wants to pay for one of those 6 schemes if there isn't certainty that the other 5 are all being built as well.
One non-denominational, one denominational. Linlithgow is in the catchment of the denominational secondary school in Blackburn, Winchburgh go to Livingston. I’d assume that the both the proposed schools in Winchburgh would recast both sets of catchments in West Lothian.2 secondary schools in Winchburgh? Where did you read that?
There’s only one in Linlithgow which is much bigger than even the proposed redeveloped Winchburgh, which also serves current Winchburgh.
2 secondary schools in Winchburgh? Where did you read that?
There’s only one in Linlithgow which is much bigger than even the proposed redeveloped Winchburgh, which also serves current Winchburgh.
One non-denominational, one denominational. Linlithgow is in the catchment of the denominational secondary school in Blackburn, Winchburgh go to Livingston. I’d assume that the both the proposed schools in Winchburgh would recast both sets of catchments in West Lothian.
What all that has to do with the train coming past my house approximately 0616 tomorrow, I dunno.
https://twitter.com/JakeNeill14/status/1021378855049842688?s=19What a fantastic morning it's been! Travelled on my first @ScotRail Class 385 between #Glasgow and #Edinburgh and I must say they great trains! Thanks to all involved for a great event this morning! Thanks for the Lego 385 too@HitachiRailEU https://t.co/mhJD0adTmG
Al Dalton from the Scotsman shared this picture which captures more of the moquette - I'm pleased to see it's real moquette too and not that flat cloth rubbish being used elsewhere…A pic posted on Twitter by someone on todays press run shows an interesting moquette on the priority seating:
https://twitter.com/JakeNeill14/status/1021378855049842688?s=19
385003, presumably still coupled with 385104 did the honour.
The 0749 was 170s. Bit of a disappointment!
Looks like it'll be working even xx:15 from Edinburgh and odd xx:15 from Queen Street?
Diagram is as follows
Ecs from Millerhill
0555 Edb-Glq
0715/0915/1115/1315/1515/1715/1915 GQS to Edi
0815/1015/1215/1415/1615/1815 Edb-GLQ
After 1915 GQS to Edi it is ecs to Millerhill
That was due to 365533 and 517 failing in the afternoon. The 365s have started to become more than a bit troublesome in the last couple of weeks as the gremlins appear....Looks like they’ve rejigged the diagrams a bit - the 17.15 out of Queen Street was 170s last night, and that's been solid 365s for a while.
That was due to 365533 and 517 failing in the afternoon. The 365s have started to become more than a bit troublesome in the last couple of weeks as the gremlins appear....
Although a passenger pulling a pass comm right out the wall wasn't exactly the trains fault!That was due to 365533 and 517 failing in the afternoon. The 365s have started to become more than a bit troublesome in the last couple of weeks as the gremlins appear....