Goldfish62
Veteran Member
- Joined
- 14 Feb 2010
- Messages
- 13,151
I know what. Rip out the ironing boards and replace with comfortable seats.Hitachi needs to do something to limit damage to their reputation and restore faith in their ability to deliver.
I know what. Rip out the ironing boards and replace with comfortable seats.Hitachi needs to do something to limit damage to their reputation and restore faith in their ability to deliver.
would go down well with the passengers, maybe not so with the bean counters.I know what. Rip out the ironing boards and replace with comfortable seats.![]()
how far behind are they? About a year? I take it whatever sanction can be/has been applied is commercially confidential?My understanding is that the maximum possible penalty clause in the contract was reached some time ago.
Hitachi re-tractioned 365s?Presumably ScotRail will be negotiating for sone kind of compensation from Hitachi...
Hitachi re-tractioned 365s?![]()
plus some aircon as well, just in case this heatwave continues. Means the windows would need to be changed for non-opening types but Hitachi doesn't really have a good track record with that sort of thing.....Hitachi re-tractioned 365s?![]()
Speak for yourself, I find the so called ironing board seats perfectly comfortable and for journeys far longer than the 40 odd minutes the Glasgow to Edinburgh run will take.I know what. Rip out the ironing boards and replace with comfortable seats.![]()
And lose the nice motor noise in the process?![]()
385031 was also noted with the vestible covers the previous week
My understanding is that the maximum possible penalty clause in the contract was reached some time ago.
You do realise I wasn't being completely serious?Speak for yourself, I find the so called ironing board seats perfectly comfortable and for journeys far longer than the 40 odd minutes the Glasgow to Edinburgh run will take.
I find the seats in the MK4s sheer torture mind you. Bit like bike saddles, what suits one person's arse will be agony for someone else.
https://twitter.com/Clinnick1/status/1014049672862814208?s=19So far five @HitachiRailEU Class 385s have been modified with new windscreens for use with @ScotRail. They enter traffic later this month. 385005/104 on test last night have both been treated.
first deployments will be E&G out of necessity, because more 170s go off-lease this month.Just spotted 385103 and 385104 at Musselburgh.
It stopped at the station for a few minutes and pulled away as I got over the bridge at the station.
Sorry no pics as I’m on my bike.
Maybe North Berwick for first deployments?
How many go off lease? After all the 365s will release 8.
Sort of - I wouldn't say July is OK, but it shouldn't get any worse as a result of 170s going south. There are already short-forms elsewhere that probably wouldn't mind getting longer trains back!So July is already ok, and it seems certain that there will be enough 385s in service by October, and who know, maybe Wabtec will have completed an HST set by then. No panic.
first deployments will be E&G out of necessity, because more 170s go off-lease this month.
Just spotted 385103 and 385104 at Musselburgh.
It stopped at the station for a few minutes and pulled away as I got over the bridge at the station.
Sorry no pics as I’m on my bike.
Maybe North Berwick for first deployments?
Edit: Appears to be on a test run to Dunbar and back.
http://www.realtimetrains.co.uk/train/G61221/2018/07/03/advanced
http://www.realtimetrains.co.uk/train/G61223/2018/07/03/advanced
Cool not what I was told but you might have heard differentlyThe E&G will see Class 385 in passenger service before any other route.
Cool not what I was told but you might have heard differently
Surely if the 365' are managing on Edinburgh to Glasgow in 8 car formation it would make more sense to introduce the 385s on other services first?The E&G will see Class 385 in passenger service before any other route.
No, there's not enough Class 365s to do the full E&G service, hence Class 385s will oust the final diesels….Surely if the 365's are managing on the E&G in 8 car formation it would make more sense to introduce the 385's on other services 1st
Makes sense, but once 170's are ousted would make sense for service to be shared with 365,s initiallyNo, there's not enough Class 365s to do the full E&G service, hence Class 385s will oust the final diesels….