Well well. I have just caught up reading pages and pages of stuff. I cannot recall reading anything about the seats. what is wrong with you all

.
What occurs to me and I have not recalled seeing it mentioned before but it is (too ?) simple.
Do not release any/some of the 170s and 158s that are due to leave Scotland. OK OK this screws up the rest of Britain's plans but they are on thin ice already. Lets pull together chaps. After all, in the big picture (ie the UK) there is not going to be a sudden cull of trains. Even the cull of non-compliant stuff (pacers etc) in December 2020 can be put off. All that happens is that improvemenmnts are delayed rather than loads of people losing what little service they had - anywhere in the United Kingdom.
The only reason to panic is if people want to save face and blame others who themselves want to cover their backsides by counter blaming first.
Bad (brown) things happens, lets get on with coping. As for those saying the problems should have been foreseen well of course that is so. But then why do we insist on testing everything after it has been so carefully designed. It is because, in reality, the unexpected happens.
BUT if it is going to take an age to sort out the driver visibility problem then apart from the simple/initial fix of not changing anything - yet. The next step is to ask how long do we (well not me as I am from the dirty sweaty capital down South) have to cope. I trust that the people in charge are busy doing that instead of fighting. So if it will be a long time then get hold of the 365s for E&G and get on with training the people who have to drive, despatch and maintain them. Quicker option and possibly an initial solution is to grab as many 315s, 317s and 321s as possible/feasible and use these to cascade the 380s towards E&G.
It is ironic that the UK is awash with surplus electric trains and short of diesel trains. Anyone from the UK who is at all worried about the environment should be happy about that. But in one part of the UK where the electrification has gone LESS unsuccessfully they are short of electric trains

.