Are 385s still running in test mode in Scotland or has that been suspended?
Driver training has been suspended due to the windscreen issue. Could be a long time before these 385s enter passenger carrying services.
Ohhhh s**t! Cue all the SNP & Humza Yousuf bashers...........
They needed the interim 7 car units until Queen St is extended some time next decade.
When was the original go live date for the 385's, December 16 wasn't it? At this rate its going to be 2 years late which is a shocking state of affairs.
to be fair to Humza Yousaf, its not really his fault. The fault lies in the manufacturer, Hitatchi, and how they have designed the cab to accomodate the gangway (required to fulfill the franchise requirement of passengers and on board catering to be able to move through the whole train). Although further delays will give political opponents another opportunity to attack the SNP over ScotRail. (note, I am not a fan of the SNP, but they are fairly blameless in regards the 385 debacle).
You are right to a degree, however the rectification and how it is managed and progressed does become a political issue. The ultimate client is the Scottish government. if the contract is now well over a year late what have they been doing to manage the situation is a perfectly legitimate question. They make the appointments, set the strategy, they insisted on the corridor connection that seems to be causing the issue. So there are legitimate questions. Also how long does it take a company with the resources Hitachi Rail have to fix a design flaw? Seems this was noted months ago, still not got an agreed solution, no timetable for rectification. Seems reasonable to me that questions are asked of transport Scotland and ultimately the Scottish government.
You are right to a degree, however the rectification and how it is managed and progressed does become a political issue. The ultimate client is the Scottish government. if the contract is now well over a year late what have they been doing to manage the situation is a perfectly legitimate question. They make the appointments, set the strategy, they insisted on the corridor connection that seems to be causing the issue. So there are legitimate questions. Also how long does it take a company with the resources Hitachi Rail have to fix a design flaw? Seems this was noted months ago, still not got an agreed solution, no timetable for rectification. Seems reasonable to me that questions are asked of transport Scotland and ultimately the Scottish government.
That would have been simple, do as with the 345s and deliver the E-G sets as 7 car with the eighth cars put in storage until required.They needed the interim 7 car units until Queen St is extended some time next decade.
.
What will be the short term solution to this? Overcrowding on some short-formed services has been awful. This morning was some of the worst I’ve ever seen.
So come hell or high water the 385s must be got into service by then.Just seen on another thread.. another 12 x 170 due on top of the 4 already transferred due at Northern for 1st July
319s had guards during their early days on Thameslink, occasional services on Southern and now on LM and Northern. 365s would have had guards when working on Southeastern routes I imagine.Someone else mentioned class 319 and 365 earlier in the thread.
Out of curiosity have these fleets ever been worked with guards or were they always DOO units?
Can I just be clear, you are saying that the purchaser of a service or goods should actively be involved with the manfacture and design of goods? I this case you think politicians should be involved in the design of a train and how any issues are resolved?
This is absurd. Those with the knowledge should manage the issue. The contract has been let and it is 100% the responsibility of Hitachi to deliver and to address issues. How on earth were the Scottish Government meant to address an issue on a train they had not yet received?
Heard yesterday (Sunday) that single 158s were running between Queen Street and Waverley... Apparently it wasn't pretty.
Transport Scotland/the Scottish Ministers are not the only ones who have a stake in this. Sumitomo Mitsui (via Caledonian Rail Leasing) aren't going to hand over (or will claw back) the hundreds of millions of pounds they have committed to Hitachi to build the trains if they're not fit for purpose. If there are serious safety concerns about the 385s, they will not be able to enter service with any operator. Even if you could force driver co-operation, I seriously doubt any insurer would want to take the risk. If death or serious injury were the result of this known problem, the pay-outs could be biblical.
So come hell or high water the 385s must be got into service by then.
Heard yesterday (Sunday) that single 158s were running between Queen Street and Waverley... Apparently it wasn't pretty.
Why not use the HST's until Wabtec can get sorted out with the programme for refurbishment.