lumitumey12345
Member
IndeedHard to see this country in anything other than (badly) managed decline.
IndeedHard to see this country in anything other than (badly) managed decline.
Importantly, the contract for the tunnels has been let:I don't believe it will happen!
And they have already demolished my favourite pub, the Bree Louise, for the station extension. The least that they can do now is to build the bloody thingNo, but there is at least a set of engineering drawings for it.
Whist we are at it we could close St Pancras and run Eurostar from Stratford, close Kings Cross and run LNER from Finsbury Park, then sell the termini for building land and people can make a killing on tax evading investments in Gibraltar. Stupid plan from an out of ideas government that needs to go.
I believe that was tried once, and I have a friend who doesn't let me forget it!Whist we are at it we could close St Pancras and run Eurostar from Stratford, close Kings Cross and run LNER from Finsbury Park, then sell the termini for building land and people can make a killing on tax evading investments in Gibraltar. Stupid plan from an out of ideas government that needs to go.
There's no track on HS2 at all.. That's why they're building a railway!There's no track from HS2 to Paddington. It would be an act of lunacy to pull Euston now considering how much has already been done
This is true. And the land is bought and the demolition work mostly complete and the tunnel boring machines commissioned. I am sure that there are a few billion to be saved by not building it even after compensation for lost profit - but it is a lot of money sunk for no benefit if that was to happenImportantly, the contract for the tunnels has been let:
![]()
HS2 agrees £78m variation on Euston tunnels cost
Skanska Costain Strabag seals extra payment for agreed changes to the scope of workwww.constructionenquirer.com
So cancelling it now will incur penalties, which usually tend to be more expensive than simply finishing the job.
It will depend on the contract. But there will be a whole load of materials that won't be needed which will be significant savings.Importantly, the contract for the tunnels has been let:
![]()
HS2 agrees £78m variation on Euston tunnels cost
Skanska Costain Strabag seals extra payment for agreed changes to the scope of workwww.constructionenquirer.com
So cancelling it now will incur penalties, which usually tend to be more expensive than simply finishing the job.
Abso - bloody - lately. The loss of the Bree was the biggest negative associated with HS2.And they have already demolished my favourite pub, the Bree Louise, for the station extension. The least that they can do now is to build the bloody thing
A challenge with delaying the work is whether construction inflation would actually outpace the availability of tax income.I am sure that there are a few billion to be saved by not building it even after compensation for lost profit - but it is a lot of money sunk for no benefit if that was to happen
OK, no route intended for it. I think people know what I meant.There's no track on HS2 at all.. That's why they're building a railway!
No it wouldn't, Paddington is much further out from central London. Paddington's not even particularly close to the West End. Euston is right next door to the Kings X/St Pancras complex and the tube connections are resolvable. It's only crossrail Paddington outranks it on and OOC solves that.If there were capacity (and there isn't) Paddington would be just as good a place to terminate as Euston - slightly better tube connection (and crossrail of course).
They could make old oak common bigger - more platforms - almost as if it was a terminus station. And they can build 2 more tunnels on the elizabeth line to cope with the extra capacity. And because we need extra trains on the Liz Line we can run the HS2 trains on the new tunnels.I don't think old oak has the capacity to take the amount of passengers there would be by terminating at old oak common. The Elizabeth line would be screwed to Farringdon if that happened.
Old Oak Common is already expected to be the terminus for something like three years, so it will have to take those passengers for a while.I don't think old oak has the capacity to take the amount of passengers there would be by terminating at old oak common. The Elizabeth line would be screwed to Farringdon if that happened.
We can have a conversation about net present value and various equivalents in the real pricing of projects but if inflation is greater than bond yields the real cost will increase.A challenge with delaying the work is whether construction inflation would actually outpace the availability of tax income.
with only phase 1 traffic from birmingham and much reduced frequency as I recallOld Oak Common is already expected to be the terminus for something like three years, so it will have to take those passengers for a while.
We held a vigil. There was a lot of real ale involved.Abso - bloody - lately. The loss of the Bree was the biggest negative associated with HS2.
I will absolutely be going Euston.
Don't give them anymore ideas!
EasyTrain - taking you from London (Old Oak Common) to Manchester (Airport, maybe, but probably only Birmingham).Not content with being the laughing stock of Europe, now they want to build a line to London that doesn't go to London...
The only attraction I can see is that this would send a clear message to those up North missing Phase 2 that London is also just as "important" as the North of the UK.
I can see changing at OOC would be bearable for me - more weather proof that walking from Euston to/from StPancras Thameslink platforms. But really ? - dropping Euston would be madness.
And they have already demolished my favourite pub, the Bree Louise, for the station extension. The least that they can do now is to build the bloody thing
OOC is going to have 6 platforms for HS2, and they've already dug the hole that big...
If you're going to various parts of Southern England then continuing to Euston and either getting the Victoria line or Thameslink is going to be more attractive than changing onto Crossrail and changing again. Especially if they tart up Phoenix way.
I'd be surprised if that was the end of the cutbacks: if I had to punt on how this would end, I'd say OOC-Birmingham only.The only attraction I can see is that this would send a clear message to those up North missing Phase 2 that London is also just as "important" as the North of the UK.
I can see changing at OOC would be bearable for me - more weather proof that walking from Euston to/from StPancras Thameslink platforms. But really ? - dropping Euston would be madness.
Indeed, and this connectivity is very helpful for spreading the load across both stations. Broadly, traffic heading north or south of London will head for Euston with King's Cross/St Pancras and Thameslink, whilst traffic heading for east or west of London will head for OOC and Crossrail.As I live in Hampshire, Euston would be better for me because of the direct Northern Line connection between Euston and Waterloo. But if I lived in Essex, the direct Elizabeth Line connection from Old Oak to Liverpool Street would be boon. So Old Oak vs Euston depends on the passenger's final destination.
If the line does get built to Euston, it will interesting to see how many people are still on the train when it gets there when compared with the number that got off at Old Oak.
This is all from an article in the Sun. I'm sure the journalism is sound.Could this not all be about the fact that Old Oak common will open first and the tunnels to Euston will take longer to be finished as was the initial plan.
Therefore this may just be the headline grabbing media proclaiming it's (HS2) all delayed and doomed and a waste of money. Trains to terminate at OOC whilst Euston is finished as 'delayed'?
That has always been the case. OOC opened first with an initial limited service to Birmingham between 2029 and 2031, then some more services from OOC, and then a full service from Euston.Could this not all be about the fact that Old Oak common will open first and the tunnels to Euston will take longer to be finished as was the initial plan.
Therefore this may just be the headline grabbing media proclaiming it's (HS2) all delayed and doomed and a waste of money. Trains to terminate at OOC whilst Euston is finished as 'delayed'?