Funny you say that...Just convert a pair of Enviro200 buses to rail standards (and add a cab at the other end)![]()
Funny you say that...Just convert a pair of Enviro200 buses to rail standards (and add a cab at the other end)![]()
Revolution's design has diesel as well, and for the limited time it will need charge (given low energy, short distance, regenerative braking, etc.), that could well be enough not to need fast charge, third rail, etc.The issue with any battery system is if enough charge can be added at each turn around so one vehicle can cover a full day. The alternative is a third rail along part of the route which inevitably will add cost. The design and approvals potentially could cost as much as the actual implementation
If you could make it work without a diesel engine, you probably would thoughRevolution's design has diesel as well, and for the limited time it will need charge (given low energy, short distance, regenerative braking, etc.), that could well be enough not to need fast charge, third rail, etc.
......
Here's a thought - could an off the shelf EV fast charger be used, with staff just plugging it in?
Could you make the EV fast charger energise the 3rd rail. What voltage is the input to an EV with a fast charger?
What we don't want is for the vehicle to be stuck at the bottom with a flat battery!
Revolution's design has diesel as well, and for the limited time it will need charge (given low energy, short distance, regenerative braking, etc.), that could well be enough not to need fast charge, third rail, etc.
If you could make it work without a diesel engine, you probably would though
Ah for some reason I thought only two were in operation on any one day. Scratch that one then.There is only one spare 230 at BLY and they are not reliable enough not to need it.
It isnt going to save anything significant if closed. No signalling, track category as low as it can be. Just elastic bands for the PPM.Am I missing something? Sadly it's becoming increasingly obvious that the country and the railway are bankrupt and we need to make ruthless cost savings.
In that enviornment, why do we need the line at all? It's less than a mile up/down a not very steep hill. Disabled/elderly can take a bus/cab.
Replace with a cycle path or (even better) mothball.
Out of curiosity, would it still be cheaper to maintain more 230s, given they already have the know how and equipment in place to do so, or would the VLR edge it out if more reliable, despite having to train new maintenance staff for it and bring in new equipment.There is only one spare 230 at BLY and they are not reliable enough not to need it.
I like your thinking!Anyone good with Photoshop care to make one up?
Reminds me a bit of this image I first saw online years ago!
Image shows a single Northern Class 170 vehicle photoshopped to have a cab at each end and shortened to have only one set of doors.
View attachment 123339
Buses aren't all that reliable, especially with traffic at peak. Currently, people can (mostly) rely on the 139s to cover the distance in 3 minutes, not 4, 5 10 minutes due to traffic.The Luton Airport shuttle bus (among others) worked perfectly fine as an extension of the train system for a long time. No need for anything complicated, just declare it a permanent RRB and sell tickets to/from Town.
It's probably not particularly heavily subsidised compared to many lines that cost far more to operate.In that enviornment, why do we need the line at all?
Yes we do need it. Its a very busy route and well used. Why should passengers have the inconvenience of walking or having to call a cab, when there's a perfectly useful well used shuttle.Am I missing something? Sadly it's becoming increasingly obvious that the country and the railway are bankrupt and we need to make ruthless cost savings.
In that enviornment, why do we need the line at all? It's less than a mile up/down a not very steep hill. Disabled/elderly can take a bus/cab.
Replace with a cycle path or (even better) mothball.
Yes, two are in service at once... with the third either on maintenance or doing crew training runs.Ah for some reason I thought only two were in operation on any one day. Scratch that one then.
Ah for some reason I thought only two were in operation on any one day. Scratch that one then.
Is the branch DOO? I assume it is from pictures but hard to be sure.
They could hire a 14xx 0-4-2T plus Autocoach from a heritage railway.......
(runs for cover).........
It isnt going to save anything significant if closed. No signalling, track category as low as it can be. Just elastic bands for the PPM.
It's probably not particularly heavily subsidised compared to many lines that cost far more to operate.
People actually use this line in substantial numbers, and there are many others you can't really say that for.
Stourbridge Junction had more pre-coronavirus entries and exists than every station on the Far North Line combined (excepting Inverness).
Yes we do need it. Its a very busy route and well used. Why should passengers have the inconvenience of walking or having to call a cab, when there's a perfectly useful well used shuttle.
They could hire a 14xx 0-4-2T plus Autocoach from a heritage railway.......
(runs for cover).........
I know. This is basically taking the "opportunity" (and it makes me sad to type this) of "needs new stuff" to close a bit of the railway.How much of the railway runs at a profit? without opening that can of worms, it isn't much of it.
Even with the £1.40 end to end fare, the farebox is going to be approaching a million pounds a year. Considering the minimal staffing requirement its likely pretty close to breakeven.But does it run at a profit?
What would be the point of mothballing?If not, is mothballing cheaper?
The Stourbridge Town branch has the advantage that people actually use it, they don't just scream that it must be maintained and then then drive or take the bus instead.If so then I don't see the point in this environment where we have to save piles of cash. It may not be much cash in the grand scheme of things but a lot of "not very much" could be "a bit much".
I appreciate closing the far north line etc may save a lot more but there are social and political reasons that make that (rightly) impractical. I don't think anyone is that bothered about what is basically a bit of trivia rather than a vitally important transport link.
Even with the £1.40 end to end fare, the farebox is going to be approaching a million pounds a year. Considering the minimal staffing requirement its likely pretty close to breakeven.
What would be the point of mothballing?
If it closes it will never reopen, it would be better to admit this to the public.
And mothballing is highly unlikely to save anything much other than the operating staff salaries, I can't imagine the maintenance spend is significant.
The Far North Line is not a "vitally important transport link", that role was usurped by the X99 bus decades ago.
The Stourbridge Town branch has the advantage that people actually use it, they don't just scream that it must be maintained and then then drive or take the bus instead.
One thing you could do, since it takes two staff members anyway, would be to put in a flatpack ski-lift style MDG gondola with one staff member at each end.
But that would require a fight over air rights given the annoyingly curvy alignment.
At a million pound a year revenue the amortised cost of replacement of the vehicless will be basically nothing in comparison.How much to replace the 139s though? That's what this thread is about.
No, I just know its not the kind of thing that appeals to the people who hand out reopening money.The point of abandoning is so that it could be reopened in more favourable economic circumstances. If you think there's no chance it would ever be reopened then that rather suggests you agree with me it's a bit of a historical aberration that while nice doesn't really "deserve" to exist.
Emirates Air Line was an abomination designed to generate headlines for Boris rather than function as a public transport system. Complete with architect led 'statement' stations.Can't tell if you're joking or not but if it is revenue-neutral/positive fine. Emirates Air Lift suggests otherwise...
What about the inspection saloon Caroline and a class 37?. If this thread was running in 2020 someone would have suggested a driving car from a 442 with class 67 on the back.They could hire a 14xx 0-4-2T plus Autocoach from a heritage railway.......
(runs for cover).........
Reopening a service within a town with a railway station does not appeal to them.
The fact that such systems are appearing in other cities indicates they aren't all disasters, indeed a rather heavywieght system opened in Toulouse recently.