If all trains were switch over to using LED bulbs, how many extra hours could they get out of the emergency lighting?
I am regretting booking with Transpennine between Edinburgh and Bolton before and after Christmas. I doubt I will get my reserved seat![]()
Would have thought that one a bit early to be busy for a Saturday?
Neil
Why? I always make sure I'm in plenty of time, suss out which platform the unit is on (even if not indicated there is only one FTPE train at EDB at one time) and go and stand by the doors appropriate for your seat. Works for me.
Oh, and if you have a reservation in coach D, hope it isn't a single 185! (The clever people at FTPE HQ swapped a few reservable seats between C and D
Would have thought that one a bit early to be busy for a Saturday?
Neil
It was on that trip, plenty of available seats on departure from Lancaster. I wonder what it was like on the way back...
So a few of these to fit the UK gauge could go to Cross Country and TPE.
Continental designs do not fit our loading gauge, new DMUs would need to be a UK specific design.
Chris
Think we all probably know on here that continental designs don't fit the UK loading gauge.
However if these designs don't work in the UK you may be struggling for new trains. Like 350/450, 380, 444, 185, 390 et al.
So building a UK gauge Bi Mode does really not create a problem.
If all trains were switch over to using LED bulbs, how many extra hours could they get out of the emergency lighting?
Think we all probably know on here that continental designs don't fit the UK loading gauge.
However if these designs don't work in the UK you may be struggling for new trains. Like 350/450, 380, 444, 185, 390 et al.
So building a UK gauge Bi Mode does really not create a problem.
Wel we're now just over a year since the first 2 of these went into service and we still seam to have issues with reliabilitty and performance. A bit sad really given they were punted as being solid reliable work out of the box units.
Pretty solid mid table performance wasn't it in the annual performance awards, considering they are brand new and performance increases over time, and also this is the most strenuous route they've been used for it wasn't as bad as people made out.
Running maxed performance...
Running maxed performance most of their route with on intercity duties when they were designed as suburban stock, high availability requirement meaning little time for preventative maintenance, lot of early issues with brand new pantograph design causing dewirements, pantograph having had to be specially developed as no other rolling stock has two pantographs so close causing wire oscillation.
Sorry but I have to ask again. Why was a new design of pan required when other 350s operate without a new design? Why does a four car 350/4 cause overhead problems when as far as I know four car 387s do not. Are 350/3s causing the same problems and having the same bedding in failures?
starmill beat me to my next question.
Don't forget a 350 failure that require assistance means two units out of service creating large gaps in an hourly service.
If 8 out of 10 units ran doubbled up perminantly with 2 at Ardwick what kind of service could provided? 2 hourly? Or is not doable.
They really could've done with an extra couple of units.