Class377/5
Established Member
- Joined
- 19 Jun 2010
- Messages
- 5,594
My suspicion is that Ardwick are still getting used to the type as are the train crews. So the people maintaining them aren't yet fully clued up on how to keep them in tip top condition in the same way that LM depots are. Also both train crew and depot staff are probably erring on the side of caution when it comes to faults. So a minor fault that down in LM land would still see a unit in service because everyone knows that this is absolutely fine might well be given much more serious treatment by staff that are new to the type.
Either that or Siemens forgot how to build 350s...
There's been figure pointing that units looked after in Scotland aren't getting the same level of attention as those at Ardwick. Plus the two damaged by an NR engineering train.
I do think the issue of crew knowledge is an important issue as its a significant change from diesel to electric and crews take awhile to get used to them. Same happened on Thameslink with the introduction of the 377s. Its part of the usual introduction issues.