Whitwell & Reepham station ....
(...open floor if correct as I shall be away from my PC for the rest of the day..)
Correct.
So, as the man says......
Whitwell & Reepham station ....
(...open floor if correct as I shall be away from my PC for the rest of the day..)
I am still here so ..
Paddington- Westbourne Park was pure GWR and was electrified as part of the Hammersmith and City Line in 1906.
...open floor if correct..
Wasn't the Rock Ferry to Hooton section [ie an extension of the previously electrified Mersey Railway from Liverpool Central], the first to be actually on ex Great Western metals?
Of course...
Oxley shed to the junction north of Wolverhampton station??
Correct!
The Central Line extension from North Acton to West Ruislip was actually built by the GWR in 1947 and has handed over to the London Underground upon opening or just after as an electrified line.
I attach scans of two GWR tickets one from Hangar Lane (dated 1947) and one from North Acton both are stations on the now Central Line tube.

Fairly dos, I wasn't arguing that you were incorrect, just that I was unable to find anything to confirm your comments.
However, during the search to confirm or deny your answer, I found that the Ealing & Shepherds Bush railway of the GWR was the first as this became an extension of the Central Line in 1920 and would have been electrified before the West Ruislip extension.
I will say that I consider you to have come up with the more correct answer than my initial belief and so the floor is yours.
As over a week's gone by, I'll post another.....
Signalboxes were usually out of bounds to those who were neither signallers nor stationmasters, but one rule in the old rule book specified certain others should visit.
To which rule am I alluding, who were involved, and in what circumstances?
As over a week's gone by, I'll post another.....
Signalboxes were usually out of bounds to those who were neither signallers nor stationmasters, but one rule in the old rule book specified certain others should visit.
To which rule am I alluding, who were involved, and in what circumstances?

Yes - you've got it.
Originally, 8 2xcar units were built. As the name suggests, they were built of lighter alloys [which was to cause trouble later], and introduced on the Leeds Central-Bradford Exchange lines via Stanningley/Pudsey in June 1954.
I remember being taken on one as a child, and standing right up at the front, enjoying the view.