Unobrow
Member
Quick update. Its expected they’ll be one test Train a day Monday-Friday for a couple of weeks, then hopefully the terminal will go fully operational from 23rd if everything is satisfactory.
There was an aggregates working on Monday from Barrow Hill (originally Dowlow) to Grimsby Pyewipe Road - apparently this is some sort of trial? I don’t think there’s been rail freight into/out of Grimsby for a while (though sometimes stuff from Immingham gets diverted that way). https://www.realtimetrains.co.uk/service/gb-nr:85701/2025-06-09/detailed
There was an aggregates working on Monday from Barrow Hill (originally Dowlow) to Grimsby Pyewipe Road - apparently this is some sort of trial? I don’t think there’s been rail freight into/out of Grimsby for a while (though sometimes stuff from Immingham gets diverted that way). https://www.realtimetrains.co.uk/service/gb-nr:85701/2025-06-09/detailed
A trial flow with the intention to become a regular service, GBRF are also due to run a train in the next few days/week. There is also talk of another flow staring in the coming months.There was an aggregates working on Monday from Barrow Hill (originally Dowlow) to Grimsby Pyewipe Road - apparently this is some sort of trial? I don’t think there’s been rail freight into/out of Grimsby for a while (though sometimes stuff from Immingham gets diverted that way). https://www.realtimetrains.co.uk/service/gb-nr:85701/2025-06-09/detailed
The vac was sent over in connection with cable laying along the light railway, not quite sure why ten autoballasters were needed.There was another service on Monday, running from Belmont Down Yd, which I passed at Doncaster.
The consist was a stoneblower, and two rakes of auto-ballasters. Very odd.
Yes, some useful gen on this threadApologies if this post isn't strictly "freight", but I'm seeing photos via Today's Railways UK and Modern Railways that 99001 and 99002 have arrived by boat to Avonmouth and suggestions this should leave by rail to Leicester "soon / in the next few days", possibly Tues 17th June.
Couple of days of good news (for once), first train into the new Northampton Gateway yesterday,...
It gets better, as on Tuesday and today, five freight workings:Couple of days of good news (for once), first train into the new Northampton Gateway yesterday
Assuming these are diversions off the usual route via Banbury (overnight engineering work?)It gets better, as on Tuesday and today, five freight workings:
4O11 Basford Hall to Southampton MCT
4O22 Trafford Park to Southampton MCT
4O18 Lawley Street to Southampton MCT
4M60 Southampton MCT to Northampton Gateway
4O56 return Northampton Gateway to Southampton MCT.
Attached screen shot is of Tuesday's RTT data for Winslow.
Attachments
Correct.Assuming these are diversions off the usual route via Banbury (overnight engineering work?)
There are 2 primary routes where it would relieve a capacity constraint (Nuneaton-Coventry-Leamington and MK-Wembley-Acton-Reading) but that has to be balanced against the capacity constraints on Didcot-Oxford, MK-Rugby and the 3-track section from Brinklow to just south of Nuneaton (northbound).Does anyone know if routing a Southampton-bound modal via the EWR offers any operational advantage? Does it free up capacity on a restricted route, or is it neither here nor there and chances are there won’t be mass re-routing via it?
Plans for new railway halt at wood panel manufacturer are agreed by Highland Council but the time of operation at the ex-Norbord base was curtailed at the weekend...
...The construction of a rail sidings yard including a connection to the main rail line and hard standing, an access road, parking, fencing, drainage and landscaping...
Aggregate, this 66745 did the honours this time.There was another working to Grimsby Pyewipe Rd yesterday from Doncaster - anyone know what it was? Just a civil engineer?
What about the 4L05/4M05 train? I thought that was a Ditton train as well.GBRf only had one Ditton (Widnes)-Felixstowe service, that being the 4L62/4M61. At the moment 4L62 runs to Felixstowe, emptied, then runs to Parkeston for the week before returning to Felixstowe Friday for Saturdays 4M61 departure. It was never a heavily populated train like the Trafford Park and container volumes are low across the board at the moment.
Next boatload of steel is not due into Portbury until mid July, I'm told - sorry!They do run Saturday trains, and the tunnel works were due to finish today, so perhaps the traffic will resume tomorrow.
There was also a three times a week (GB operated) train from Southampton until earlier this year,Hi all, does anyone know why container traffic to Ditton seems to have dropped off a cliff recently?
Previously, it was this:
FL 2 a day to Felixstowe, GBRf 2 a day to Felixstowe
Now, it is this:
FL 1 a day to London Gateway, GBRf 1 a day to Felixstowe
Quite a big drop - anyone know why?
Next boatload of steel is not due into Portbury until mid July, I'm told - sorry!
The EAF hasn’t even began being constructed yet, this is slab (AFAIK from the Netherlands) for rolling at Port TalbotOut of interest, is it known where the steel is coming from? (Presume this is scrap for the electric arc at Port Talbot?)
A lot of the slabs I've seen loaded on that train over the last few months have been marked with India as the country of originThe EAF hasn’t even began being constructed yet, this is slab (AFAIK from the Netherlands) for rolling at Port Talbot
The FL work was Maersk, so moved to Gateway as 4L58/4M58Next boatload of steel is not due into Portbury until mid July, I'm told - sorry!
== Doublepost prevention - post automatically merged: ==
There was also a three times a week (GB operated) train from Southampton until earlier this year,
which has also died a death.