zwk500
Veteran Member
Is it a problem with TGV-M not meeting the accessibility requirements, or separate problems with accessibility, and the TGV-M?Problems with accessibility guidelines and TGV-M.
Is it a problem with TGV-M not meeting the accessibility requirements, or separate problems with accessibility, and the TGV-M?Problems with accessibility guidelines and TGV-M.
The problem is explained in detail in this article that I have just found.Is it a problem with TGV-M not meeting the accessibility requirements, or separate problems with accessibility, and the TGV-M?
crossborderrail.trainsforeurope.eu
So, something like the eurostar e320? That would make lots of sense. Maybe too much for Eurostar!Surely a single deck flat floor unit with distributed traction is the most straightforward choice?
They (eg the Omneo Premium) are ingenious, I agree - I wonder how you would cope with the aerodynamics at 330km/h though?For non-high-speed trains there are also trains that have a mix of double and single deck coaches, would such a design make sense for a high-speed operation? Simply have the accessible seats and wheelchair places in the single deck sections.
That should be doable - the region 2N / Omneo premium already gets close by using the roof of the single-deck cars to install equipment. Or just have VERY tall ceilings on the single deck carsThey (eg the Omneo Premium) are ingenious, I agree - I wonder how you would cope with the aerodynamics at 330km/h though?
The two main ways for dealing with the platform heights are:There's still the issue of two different platform heights to cope with.
I don't have access to the original documents, but likely to make it easier to board trains designed for 915mm height platforms.Why did HS1 build its international platforms at a different height to those in France..?
They followed the standard of Belgium, the Netherlands and western Germany (760mm). Why mainland europe has decided to standardise on two different levels (550 and 760mm), I do not know.Why did HS1 build its international platforms at a different height to those in France..?
The old dutch height was 840mm, but the Netherlands is changing to 760mm. Fortunately they are pretty close, so both heights existing at the same time is not really an issue.I don't have access to the original documents, but likely to make it easier to board trains designed for 915mm height platforms.
760mm is the higher of the two permitted TSI heights (leaving aisde national special heights like 915mm or the Dutch one)
Millions of passengers could benefit from quicker, greener and more convenient travel across Europe as the Transport Secretary signs a landmark agreement to progress a new direct rail link to Switzerland.
A Memorandum of Understanding (MoU) signed today (9 May 2025) between the Transport Secretary, Heidi Alexander, and Federal Councillor, Albert Rösti, will lay the groundwork for future commercial services that could boost tourism to the UK, support jobs and businesses and strengthen cross-border trade.
This landmark agreement, signed today at London St Pancras Station, signifies the government’s ambition to boost sustainable transport links across Europe and unlock the significant economic, social and environmental benefits a direct rail connection brings.
The move will help formalise cooperation between the 2 governments, building on industry efforts, to address the barriers to establishing direct rail services, in particular the need to establish border controls and meet Channel Tunnel safety rules.
It will also support the industry’s existing plans to realise long-term ambitions for enhanced rail connectivity between the UK and central Europe.
There is also a specific thread for this announcement: https://www.railforums.co.uk/threads/london-to-switzerland-direct.285973/DfT announcement : deal with Switzerland for direct rail link
![]()
Transport Secretary forges landmark deal to progress new Swiss rail link
Direct rail link between UK and Switzerland could boost tourism and grow our economy, while offering a greener option for passengers.www.gov.uk
The transport tech giant Uber is to take on Eurostar through the Channel Tunnel – but you may need an Uber to reach the departure station in east London.
Uber has teamed up with a start-up operator, Gemini Trains, to promote a planned rival service linking London with Paris and Brussels.
If the partners are permitted to launch trains to Continental Europe, they will not start from the terminal at St Pancras – but six miles down the track at Stratford International.
“Stratford is actually a bit of a blank canvas,” said Adrian Quine, chief executive of Gemini Trains. “It’s a bit like London City airport as opposed to Heathrow or Gatwick: it’s very quick and easy to get through. It’s going to be far less crowded, so we think it's a bit of a jewel in the crown.”
Replace? Probably not![]()
Could Stratford replace St Pancras as the gateway to Europe?
Exclusive: ’We think it's a bit of a jewel in the crown’ says Gemini Trains CEO Adrian Quinewww.independent.co.uk
Can it though?Replace? Probably not
Supplement? Definitely
It remains to be seen what Gemini’s plan is because as you say the investment required is nothing to sniff at, unless they plan to deadhead to St Pancras and back. But I assume they must have thought of thisCan it though?
Given the issues of turning at Stratford and access to Platforms 1 and 4 would it work without huge investment?
In not serving passengers at St Pancras, they are trying to avoid the cost of using HS1 for that distance and St P for that time. Reversing in platform costs a large portion of serving the station like Eurostar, and there are no sidings in the station. The line towards Camden Road may have been ruled out as a siding.Is reversing at St Pancras really such a big deal?
In not serving passengers at St Pancras, they are trying to avoid the cost of using HS1 for that distance and St P for that time. Reversing in platform costs a large portion of serving the station like Eurostar, and there are no sidings in the station. The line towards Camden Road may have been ruled out as a siding.
You can terminate but only the domestic platforms allow trains to reverse. You would need to run to St Pancras to reverse.So would it be at all possible to terminate trains at Stratford as it stands?
Not from abroad.So would it be at all possible to terminate trains at Stratford as it stands?
Yes, the international are 760mm high and the domestic 915mm high (they had to prop up the international for Javelin service during the Olympics to serve the volume)Would switching the domestic and international platforms come at incredibly large cost?
The international facilities at Stratford are not really lying idle, most of them do not exist!
They will need an awful lot of money to pay to finish the terminal and then operate it, unless they expect the government to provide a major additional subsidy.
Would switching the domestic and international platforms come at incredibly large cost?
not only that but the domestic platforms in the middle are half the length of the international platforms.Yes, the international are 760mm high and the domestic 915mm high (they had to prop up the international for Javelin service during the Olympics to serve the volume)