To try and encourage more traffic from the south I guess.Why when a lot of Manchester Airport's traffic comes from the north?
To try and encourage more traffic from the south I guess.Why when a lot of Manchester Airport's traffic comes from the north?
To try and encourage more traffic from the south I guess.
It would be as useful for people from the South as the Birmingham Int stops on the class 9 Avanti Scotland to London via west midlands trains: It opens up another option for easy access to an airport if you spot good-value flights going from there, or flights at a more civilised time.Why when a lot of Manchester Airport's traffic comes from the north?
Even so, the present hourly stopper is poor. Most passengers trying to go south from MIA currently end up going via PiccadillyThere isn't likely to be a lot from an awfully long way south, because the budget flyers will end up at Luton, Stansted and Birmingham, and the further south you go the wide ranging offer of Heathrow becomes attractive. You might get some from Birmingham at a push as that has a very narrow range of destinations, but certainly not further south.
Even so, the present hourly stopper is poor. Most passengers trying to go south from MIA currently end up going via Piccadilly
especially as Jet2 are increasing their activities at John Lennon...There is an argument to extend the LNR to Manchester Airport which were at one point being actively considered but seem to have gone on the back burner now, though. I'd say Liverpool made more sense.
Hmm. May require a stronger rethink.Impracticable with the current layout at Crewe. Only Platform 6 is available for such movements.
It's not just an airport, it is a significant transport hub for buses and coaches in the area too. Also you could take pressure off Picc 13/14 a bit by enabling passengers to interchange onto a service originating at the airport (e.g. the Blackpool North service) to board there, splitting the load compared to InterCity passengers from the south interchanging at Picc, as is typical.Why when a lot of Manchester Airport's traffic comes from the north?
A sensible post.@AlastairFraser and others
The removal of "surplus" platforms, cross-overs and other railway infrastructure to create a slimmed down railway in the last 30 years or so of British Rail's existence was a sensible approach to keeping costs under control and the "essential" railway alive. However, it has made it more difficult to remodel services and this has to be taken into account for the financially challenging times that the railway network is experiencing once again.
Therefore, it is important to make best use of existing infrastructure, with its limitations at busy junctions such as Cardiff Central, Crewe and inner Manchester. Sadly, use of the Ordsall curve makes matters worse because associated infrastructure to make best use of it, in particular along the Castlefield line, was never built and is now completely unaffordable for the foreseeable future.
Therefore, services need to be planned to take account of the existing facts that:
IMO, therefore, mothballing the Ordsall curve, except for occasional ecs moves, is the best way forward for it, even if it causes slight inconvenience to some people such as those travelling from Yorkshire/NE England to Manchester Airport.
- there are 4 tracks through Victoria and only 2 along the Castlefield line
- platforms 13 and 14 at Piccadilly are unsuitable for long-distance trains carrying passengers with lots of luggage
- crossing moves are wasteful of capacity
- trains calling at Victoria AND Castlefield line stations waste platform capacity
- extending Metrolink is the most cost-effective way of increasing rail use within Greater Manchester

I have already (like other members) have suggested various alternative options for reducing the amount of trains through the Castlefield corridor in previous posts which has nothing to do with the Ordsall Chord.A reminder that there is only 1ph using the Ordsall Chord at the moment anyway - removing it will not magically solve all of Castlefield's problems.
In addition, cutting the TPE Saltburn back to Victoria brings it's own problems as the station is not suited to terminating services.
No it is an international airport with a hub feeding it. Its not a hub with an airport attached. Manchester Airport have ambitions to reach 70 million passengers per annum once all the upgrades have been completed, that kind of throughput needs multiple connectivity modes including rail from the airport's prime markets which are across the North of England.Hmm. May require a stronger rethink.
== Doublepost prevention - post automatically merged: ==
It's not just an airport, it is a significant transport hub for buses and coaches in the area too. Also you could take pressure off Picc 13/14 a bit by enabling passengers to interchange onto a service originating at the airport (e.g. the Blackpool North service) to board there, splitting the load compared to InterCity passengers from the south interchanging at Picc, as is typical.
The problem being that Stalybridge isn't exactly a huge feeder of the airport. Oh I know the theory, throw punters off TPEs there to get the "shuttle"...I don't think I would mothball it, but a 2tph all stations EMU service from Stalybridge to Manchester Airport is probably the best use for it, not sending TPE round it.
In the long term, I'd disagree that it is unaffordable, because there are many different ways to relieve Castlefield of local and shorter regional services.@AlastairFraser and others
The removal of "surplus" platforms, cross-overs and other railway infrastructure to create a slimmed down railway in the last 30 years or so of British Rail's existence was a sensible approach to keeping costs under control and the "essential" railway alive. However, it has made it more difficult to remodel services and this has to be taken into account for the financially challenging times that the railway network is experiencing once again.
Therefore, it is important to make best use of existing infrastructure, with its limitations at busy junctions such as Cardiff Central, Crewe and inner Manchester. Sadly, use of the Ordsall curve makes matters worse because associated infrastructure to make best use of it, in particular along the Castlefield line, was never built and is now completely unaffordable for the foreseeable future.
Therefore, services need to be planned to take account of the existing facts that:
IMO, therefore, mothballing the Ordsall curve, except for occasional ecs moves, is the best way forward for it, even if it causes slight inconvenience to some people such as those travelling from Yorkshire/NE England to Manchester Airport.
- there are 4 tracks through Victoria and only 2 along the Castlefield line
- platforms 13 and 14 at Piccadilly are unsuitable for long-distance trains carrying passengers with lots of luggage
- crossing moves are wasteful of capacity
- trains calling at Victoria AND Castlefield line stations waste platform capacity
- extending Metrolink is the most cost-effective way of increasing rail use within Greater Manchester
Well, if MAG think their glorified shed at Ringway is worthy of a multitude of direct connections, they should strongly consider contributing to a rail project to strengthen those rail connections.No it is an international airport with a hub feeding it. Its not a hub with an airport attached. Manchester Airport have ambitions to reach 70 million passengers per annum once all the upgrades have been completed, that kind of throughput needs multiple connectivity modes including rail from the airport's prime markets which are across the North of England.
LNWR already serve Liverpool South Parkway, the nearest station... LNR to Man Airport would make perfect senseespecially as Jet2 are increasing their activities at John Lennon...
It seems to me that a lot of the problem is the insistence on using Piccadilly for functions for which it is very badly shaped. Only two platforms, and in the most awkward position, to handle all "through" services, and most of the capacity in the terminus part which is arguably in the wrong place anyway.
Perhaps if They could fettle up the Philips Park line, and stomach building a 500m or so flyover from the south end of it to the main line from Piccadilly, some at least of the "through" services from the north-west could run via Victoria instead of Piccadilly, and still call at Mcr Airport etc.
Wouldnt have worked with TPU, unless a load more infrastructure was built.I can't help but think Philips Park would have been more useful than Ordsall, because it would have allowed North West/North Wales services to run via and call at Victoria but then run round and terminate in the Piccadilly low numbered platforms. Would have meant a loss of Airport through services (as crossing the formation wouldn't work), but this could be replaced with a shuttle from platform 11 which is a very short walk on the flat. It would have removed several trains per hour from Castlefield allowing other services like the CLC to be improved.
Why does the service frequency through the Castlefield corridor need to be further reduced?The emphasis is surely on getting trains through the Castlefield corridor within its limited capacity which currently means reducing the present frequency of trains going through it especially when you have reasonable alternative options available. If this means the Ordsall Chord becomes a white elephant, so be it but at least passengers will get a more reliable and consistent service which is what they want.
That would certainly solve a few different problems wouldn’t it! Has it ever been mooted?One solution which would benefit the Airport and Piccadilly station would be. Build a new line from just north of Mobberley station and run underground under the airport and create a new underground station linked to the existing one then run out and link with the existing line and onward to Manchester Piccadilly. This would provide more platforms at the airport and trains would not have to use the Castlefield corridor.
How does that solve anything? Mobberley trains end up at Edgeley/Stockport so avoid Castlefield anyway? Sending them via the Airport just sends them via the Styals and compounds the issues at Slade Lane. I don't get it.One solution which would benefit the Airport and Piccadilly station would be. Build a new line from just north of Mobberley station and run underground under the airport and create a new underground station linked to the existing one then run out and link with the existing line and onward to Manchester Piccadilly. This would provide more platforms at the airport and trains would not have to use the Castlefield corridor.
1) WCML capacity south of Preston is very limited - no way they could send the BPNs through Warrington.Trains from Blackpool, Lakes etc would be able to go to the airport via Hartford junction. Therefore not going through Manchester.
Reduces platform pressure at the airport allowing longer trains assisting with dwell time through Castlefield.How does that solve anything? Mobberley trains end up at Edgeley/Stockport so avoid Castlefield anyway? Sending them via the Airport just sends them via the Styals and compounds the issues at Slade Lane. I don't get it.
See, this is a good plan for the future, but the situation in central Manchester is more urgent and both situations will cost a lot of money to sort out.Reduces platform pressure at the airport allowing longer trains assisting with dwell time through Castlefield.
Would allow Chester and North Wales services currently travelling via Warrington Bank Quay to travel via Northwich linking to a northern or TPE service maintaining connectivity to the airport and Manchester City Centre but removing a path from Castlefield.
Also allows Northern services terminating at the airport to be extended potentially allowing reopening of Middlewich branch and improving services to Northwich. Would need additional investment in addition to the airport western link itself but would deliver a wide range of benefits.
Which trains would become longer through this? Platform sharing doesn't routinely happen these days, if unit formations are too short for the passenger loadings it isn't the fault of the station at the airport.Reduces platform pressure at the airport allowing longer trains assisting with dwell time through Castlefield.
The existing station has four platforms, each of them eight carriages long. There are a handful of six carriage trains, that is all. Platform sharing seldom happens and even when it does it's usually a two car train sharing with another two car train. You could extend the airport platforms to 400m and it wouldn't make the slightest bit of difference to congestion through Castlefield Jcn.If an underground station was built it should be made to allow longer trains to stop there.
Reduces platform pressure at the airport allowing longer trains assisting with dwell time through Castlefield.
Would allow Chester and North Wales services currently travelling via Warrington Bank Quay to travel via Northwich linking to a northern or TPE service maintaining connectivity to the airport and Manchester City Centre but removing a path from Castlefield.
Also allows Northern services terminating at the airport to be extended potentially allowing reopening of Middlewich branch and improving services to Northwich. Would need additional investment in addition to the airport western link itself but would deliver a wide range of benefits.
Which trains would become longer through this? Platform sharing doesn't routinely happen these days, if unit formations are too short for the passenger loadings it isn't the fault of the station at the airport.
Which Chester services currently via Warrington BQ end up in Manchester??